X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0384012015020

Well Details

Well ID: 0384012015020
Loading map...
Location: 02/15-20-038-01W4/0
Location Alias: 02/15-20-38-01 W4M
Location Alias 2: 02/15-20-038-01 W4/00
Country: Canada
Province: Alberta
Township: 038
Meridian: 4
Range: 01
Section: 20
County/Municipality: Municipal District of Provost No. 52
Well Name: WISER ET AL 15C PROVOST 15-20-38-1
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0257471
License Date: 2001-07-18
License Status: Suspension
Spud Date: 2001-07-27
Final Drill Date: 2001-07-30
Well Total Depth: 843.60 m
Surface Hole Latitude: 52.286054
Surface Hole Longitude: -110.109164

For data sources see[1][2]

Well History

Date Event
2001-07-18 Obtained License
2001-07-28 Direction Drilling Operation Performed - Deviate
2001-07-28 Surface Casing Operation Performed
2001-07-30 Finished Drilling
2001-07-30 Production Casing Operation Performed
2001-07-30 Rig Released
2001-07-30 Well Log Performed
2001-07-30 Well Mode changed to Drilled and Cased
2001-08-11 Perforation Treatment Performed - Jet Perforation
2001-08-18 Well Began Production
2001-08-18 Well Fluid changed to Crude Oil
2001-08-18 Well Mode changed to Pumping
2001-09-22 Perforation Treatment Performed - Jet Perforation
2001-09-22 Well Fluid changed to Crude Oil
2001-09-22 Well Log Performed
2001-09-22 Well Mode changed to Pumping
2003-04-01 Well Fluid changed to Crude Oil
2003-04-01 Well Mode changed to Suspended
2004-07-21 Well Fluid changed to Crude Oil
2004-07-21 Well Mode changed to Flowing
2012-04-01 Well Fluid changed to Crude Oil
2012-04-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-07-28 176.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-08-11 Perforation 796.00 802.00 26
2001-09-22 Perforation 784.20 794.80 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1030 0.0 0.0 0.0
2002 5001 0.0 0.0 0.0
2004 640 0.0 0.0 0.0
2005 622 0.0 0.0 0.0
2008 1896 0.0 0.0 0.0
2009 1859 0.0 0.0 0.0
2010 4163 0.0 0.0 0.0
2011 516 0.0 0.0 0.0

For data sources see[6]

References