X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375093010000

Well Details

Well ID: 0375093010000
Loading map...
Location: 00/10-30-037-09W5/0
Location Alias: 00/10-30-37-09 W5M
Location Alias 2: 00/10-30-037-09 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 09
Section: 30
County/Municipality: Clearwater County
Well Name: TIDEWATER FERRIER 10-30-37-9
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0045570
License Date: 1973-04-18
License Status: Issued
Spud Date: 1973-06-08
Final Drill Date: 1973-08-23
Well Total Depth: 4564.10 m
Surface Hole Latitude: 52.212542
Surface Hole Longitude: -115.270716

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-04-18 Obtained License
1973-08-23 Finished Drilling
1973-08-28 Liner Casing Operation Performed
1973-10-12 Well Log Performed
1973-10-14 Perforation Treatment Performed - Jet Perforation
1973-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-10-19 Well Log Performed
1973-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-10-20 Perforation Treatment Performed - Jet Perforation
1973-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-03-12 Well Mode changed to Drilled and Cased
1974-03-15 Well Mode changed to Drilled and Cased
1978-12-21 Well Began Injection
1978-12-21 Well Fluid changed to Water
1978-12-21 Well Type changed to Disposal
1987-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-15 Well Log Performed
1992-11-04 Perforation Treatment Performed - Jet Perforation
1992-11-04 Well Log Performed
1992-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-06 Well Log Performed
1995-09-21 Well Log Performed
1995-10-12 Well Log Performed
1995-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-24 Perforation Treatment Performed - Jet Perforation
1995-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-26 Perforation Treatment Performed - Remedial Casing
1995-10-27 Perforation Treatment Performed - Remedial Casing
1995-10-31 Well Log Performed
2010-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-15 Perforation Treatment Performed - Jet Perforation
2010-12-17 Well Log Performed
2011-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-14 Perforation Treatment Performed - Cement Squeeze
2012-11-15 Perforation Treatment Performed - Cement Squeeze
2012-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-11-16 Plug Back Performed
2012-11-16 Well Fluid changed to Water
2012-11-16 Well Log Performed
2012-11-16 Well Mode changed to Abandoned Zone
2012-11-16 Well Type changed to Disposal
2012-11-26 Well Log Performed
2012-11-27 Well Log Performed
2013-04-16 Liner Casing Operation Performed
2013-04-21 Well Log Performed
2013-04-22 Perforation Treatment Performed - Jet Perforation
2013-04-22 Well Log Performed
2013-04-23 Perforation Treatment Performed - Jet Perforation
2013-04-23 Well Log Performed
2013-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-04-24 Perforation Treatment Performed - Jet Perforation
2013-04-25 Perforation Treatment Performed - Jet Perforation
2013-04-25 Well Log Performed
2013-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-04-27 Well Log Performed
2015-05-27 Well Log Performed
2017-03-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-10-14 Perforation 4514.70 4520.80 7
1987-11-07 Acid Treatment 4314.70 4395.20 0
1992-11-04 Perforation 4373.60 4376.60 13
1992-11-05 Acid Treatment 4314.00 4395.20 0
1995-10-14 Acid Treatment 4314.00 4482.70 0
1995-10-24 Perforation 3763.00 3765.00 14
1995-10-24 Perforation 3798.00 3800.00 14
1995-10-24 Acid Treatment 3763.00 3800.00 0
1995-10-25 Acid Treatment 3763.00 3800.00 0
1995-10-26 Remedial Casing Cementing 3798.00 3800.00 0
1995-10-26 Acid Treatment 3763.00 3765.00 0
1973-10-14 Perforation 4474.50 4482.70 7
1995-10-27 Remedial Casing Cementing 3763.00 3765.00 0
2010-11-07 Packing Device Capped w/Cement 3925.00 3929.00 0
2010-12-15 Perforation 4321.70 4325.20 17
2010-12-15 Perforation 4318.20 4321.70 17
2010-12-15 Perforation 4314.70 4318.20 17
2010-12-15 Perforation 4311.20 4314.70 17
2011-06-21 Acid Treatment 4322.70 4339.10 0
2011-06-21 Acid Treatment 4321.70 4325.20 0
2011-06-21 Acid Treatment 4318.20 4321.70 0
2011-06-21 Acid Treatment 4314.70 4318.20 0
1973-10-16 Acid Treatment 4474.50 4520.80 0
2011-06-21 Acid Treatment 4311.20 4314.70 0
2012-11-14 Cement Squeeze 4344.00 4395.20 0
2012-11-15 Cement Squeeze 4311.20 4339.10 0
2012-11-16 Packing Device Capped w/Cement 3989.00 4282.00 0
2013-04-22 Perforation 3897.00 3900.00 20
2013-04-22 Perforation 3894.00 3897.00 20
2013-04-22 Perforation 3891.00 3894.00 20
2013-04-22 Perforation 3890.00 3891.00 20
2013-04-23 Perforation 3797.00 3800.00 20
2013-04-23 Perforation 3796.00 3797.00 20
1973-10-20 Packing Device Capped w/Cement 4449.60 4456.20 0
2013-04-23 Perforation 3793.00 3796.00 20
2013-04-23 Perforation 3790.00 3793.00 20
2013-04-24 Acid Treatment 3890.00 3900.00 0
2013-04-24 Acid Treatment 3790.00 3800.00 0
2013-04-24 Perforation 3899.00 3900.00 13
2013-04-25 Perforation 3896.00 3899.00 13
2013-04-25 Perforation 3893.00 3896.00 13
2013-04-25 Perforation 3890.00 3893.00 13
2013-04-25 Perforation 3804.00 3805.00 13
2013-04-25 Perforation 3801.00 3804.00 13
1973-10-20 Perforation 4314.70 4321.50 7
2013-04-25 Perforation 3798.00 3801.00 13
2013-04-25 Perforation 3795.00 3798.00 13
2013-04-26 Acid Treatment 3890.00 3900.00 0
2013-04-26 Acid Treatment 3795.00 3805.00 0
2013-04-27 Acid Treatment 3795.00 3900.00 0
1973-10-20 Perforation 4322.70 4339.10 7
1973-10-20 Perforation 4344.00 4350.10 7
1973-10-20 Perforation 4390.90 4395.20 7
1973-10-21 Acid Treatment 4314.70 4395.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-01-10 No Incident Encountered 0.00 0.00
2013-05-02 No Incident Encountered 0.00 0.00
2013-04-16 No Incident Encountered 0.00 0.00
2016-12-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References