X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375082304020

Well Details

Well ID: 0375082304020
Loading map...
Location: 02/04-23-037-08W5/0
Location Alias: 02/04-23-37-08 W5M
Location Alias 2: 02/04-23-037-08 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 08
Section: 23
County/Municipality: Clearwater County
Well Name: YANGARRA HZ 102 FERRIER 4-23-37-8
Operator Name: Yangarra Resources Corp.
License Number: 0493411
License Date: 2019-01-14
License Status: Issued
Spud Date: 2019-02-24
Final Drill Date: 2019-03-09
Well Total Depth: 5837.00 m
Surface Hole Latitude: 52.221168
Surface Hole Longitude: -115.050100

For data sources see[1][2]

Well History

Date Event
2019-01-14 Obtained License
2019-02-26 Surface Casing Operation Performed
2019-03-02 Direction Drilling Operation Performed - Deviate
2019-03-03 Direction Drilling Operation Performed - Horizontal
2019-03-09 Finished Drilling
2019-03-09 Well Log Performed
2019-03-09 Well Mode changed to Drilled and Cased
2019-03-12 Production Casing Operation Performed
2019-03-12 Rig Released
2019-05-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-05-31 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-01 Well Began Production
2019-06-01 Well Fluid changed to Crude Oil
2019-06-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-02-24 Stampede Drilling A Division Of Matrix Energy Technologi 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-03-02 1901.20 Deviate (5 - 79 degrees)
2019-03-03 2728.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-05-28 Multi-Stage Fracture 5792.00 5792.10 0
2019-05-28 Multi-Stage Fracture 5617.40 5617.50 0
2019-05-30 Multi-Stage Fracture 4003.60 4003.70 0
2019-05-30 Multi-Stage Fracture 3985.70 3985.80 0
2019-05-30 Multi-Stage Fracture 3967.70 3967.80 0
2019-05-30 Multi-Stage Fracture 3949.80 3949.90 0
2019-05-30 Multi-Stage Fracture 3931.90 3932.00 0
2019-05-30 Multi-Stage Fracture 3914.00 3914.10 0
2019-05-30 Multi-Stage Fracture 3896.00 3896.10 0
2019-05-30 Multi-Stage Fracture 3878.10 3878.20 0
2019-05-30 Multi-Stage Fracture 3860.20 3860.30 0
2019-05-30 Multi-Stage Fracture 3842.30 3842.40 0
2019-05-28 Multi-Stage Fracture 5599.50 5599.60 0
2019-05-30 Multi-Stage Fracture 3824.40 3824.50 0
2019-05-30 Multi-Stage Fracture 3806.50 3806.60 0
2019-05-30 Multi-Stage Fracture 3788.60 3788.70 0
2019-05-30 Multi-Stage Fracture 3770.70 3770.80 0
2019-05-30 Multi-Stage Fracture 3752.90 3753.00 0
2019-05-30 Multi-Stage Fracture 3735.00 3735.10 0
2019-05-30 Multi-Stage Fracture 3717.00 3717.10 0
2019-05-30 Multi-Stage Fracture 3699.20 3699.30 0
2019-05-30 Multi-Stage Fracture 3681.50 3681.60 0
2019-05-30 Multi-Stage Fracture 3663.60 3663.70 0
2019-05-28 Multi-Stage Fracture 5581.60 5581.70 0
2019-05-30 Multi-Stage Fracture 3645.70 3645.80 0
2019-05-30 Multi-Stage Fracture 3627.80 3627.90 0
2019-05-30 Multi-Stage Fracture 3609.80 3609.90 0
2019-05-30 Multi-Stage Fracture 3592.10 3592.20 0
2019-05-30 Multi-Stage Fracture 3574.10 3574.20 0
2019-05-30 Multi-Stage Fracture 3556.20 3556.30 0
2019-05-30 Multi-Stage Fracture 3538.30 3538.40 0
2019-05-31 Multi-Stage Fracture 3520.40 3520.50 0
2019-05-31 Multi-Stage Fracture 3502.40 3502.50 0
2019-05-31 Multi-Stage Fracture 3484.50 3484.60 0
2019-05-28 Multi-Stage Fracture 5563.90 5564.00 0
2019-05-31 Multi-Stage Fracture 3466.60 3466.70 0
2019-05-31 Multi-Stage Fracture 3448.70 3448.80 0
2019-05-31 Multi-Stage Fracture 3430.70 3430.80 0
2019-05-31 Multi-Stage Fracture 3412.80 3412.90 0
2019-05-31 Multi-Stage Fracture 3394.80 3394.90 0
2019-05-31 Multi-Stage Fracture 3376.80 3376.90 0
2019-05-31 Multi-Stage Fracture 3358.80 3358.90 0
2019-05-31 Multi-Stage Fracture 3340.90 3341.00 0
2019-05-31 Multi-Stage Fracture 3322.90 3323.00 0
2019-05-31 Multi-Stage Fracture 3305.00 3305.10 0
2019-05-28 Multi-Stage Fracture 5546.00 5546.10 0
2019-05-31 Multi-Stage Fracture 3287.10 3287.20 0
2019-05-31 Multi-Stage Fracture 3269.10 3269.20 0
2019-05-31 Multi-Stage Fracture 3251.20 3251.30 0
2019-05-31 Multi-Stage Fracture 3233.30 3233.40 0
2019-05-31 Multi-Stage Fracture 3215.30 3215.40 0
2019-05-31 Multi-Stage Fracture 3197.40 3197.50 0
2019-05-31 Multi-Stage Fracture 3179.30 3179.40 0
2019-05-31 Multi-Stage Fracture 3161.40 3161.50 0
2019-05-31 Multi-Stage Fracture 3143.40 3143.50 0
2019-05-31 Multi-Stage Fracture 3125.50 3125.60 0
2019-05-28 Multi-Stage Fracture 5528.10 5528.20 0
2019-05-31 Multi-Stage Fracture 3107.60 3107.70 0
2019-05-31 Multi-Stage Fracture 3089.60 3089.70 0
2019-05-31 Multi-Stage Fracture 3071.60 3071.70 0
2019-05-31 Multi-Stage Fracture 3053.70 3053.80 0
2019-05-31 Multi-Stage Fracture 3035.80 3035.90 0
2019-05-31 Multi-Stage Fracture 3017.80 3017.90 0
2019-05-31 Multi-Stage Fracture 2999.80 2999.90 0
2019-05-31 Multi-Stage Fracture 2981.90 2982.00 0
2019-05-31 Multi-Stage Fracture 2963.90 2964.00 0
2019-05-31 Multi-Stage Fracture 2946.00 2946.10 0
2019-05-28 Multi-Stage Fracture 5510.20 5510.30 0
2019-05-31 Multi-Stage Fracture 2928.10 2928.20 0
2019-05-31 Multi-Stage Fracture 2910.20 2910.30 0
2019-05-31 Multi-Stage Fracture 2892.20 2892.30 0
2019-05-31 Multi-Stage Fracture 2874.30 2874.40 0
2019-05-31 Multi-Stage Fracture 2856.30 2856.40 0
2019-05-31 Multi-Stage Fracture 2838.40 2838.50 0
2019-05-31 Multi-Stage Fracture 2820.50 2820.60 0
2019-05-31 Multi-Stage Fracture 2802.50 2802.60 0
2019-05-31 Multi-Stage Fracture 2784.60 2784.70 0
2019-05-31 Multi-Stage Fracture 2766.60 2766.70 0
2019-05-28 Multi-Stage Fracture 5492.30 5492.40 0
2019-05-28 Multi-Stage Fracture 5474.40 5474.50 0
2019-05-28 Multi-Stage Fracture 5456.50 5456.60 0
2019-05-28 Multi-Stage Fracture 5760.70 5760.80 0
2019-05-28 Multi-Stage Fracture 5438.50 5438.60 0
2019-05-28 Multi-Stage Fracture 5420.60 5420.70 0
2019-05-28 Multi-Stage Fracture 5402.80 5402.90 0
2019-05-28 Multi-Stage Fracture 5384.80 5384.90 0
2019-05-28 Multi-Stage Fracture 5366.90 5367.00 0
2019-05-28 Multi-Stage Fracture 5349.00 5349.10 0
2019-05-28 Multi-Stage Fracture 5331.00 5331.10 0
2019-05-28 Multi-Stage Fracture 5313.00 5313.10 0
2019-05-28 Multi-Stage Fracture 5295.10 5295.20 0
2019-05-29 Multi-Stage Fracture 5277.10 5277.20 0
2019-05-28 Multi-Stage Fracture 5742.80 5742.90 0
2019-05-29 Multi-Stage Fracture 5259.20 5259.30 0
2019-05-29 Multi-Stage Fracture 5241.20 5241.30 0
2019-05-29 Multi-Stage Fracture 5223.30 5223.40 0
2019-05-29 Multi-Stage Fracture 5205.40 5205.50 0
2019-05-29 Multi-Stage Fracture 5187.50 5187.60 0
2019-05-29 Multi-Stage Fracture 5169.60 5169.70 0
2019-05-29 Multi-Stage Fracture 5151.70 5151.80 0
2019-05-29 Multi-Stage Fracture 5133.70 5133.80 0
2019-05-29 Multi-Stage Fracture 5115.80 5115.90 0
2019-05-29 Multi-Stage Fracture 5097.80 5097.90 0
2019-05-28 Multi-Stage Fracture 5724.80 5724.90 0
2019-05-29 Multi-Stage Fracture 5079.90 5080.00 0
2019-05-29 Multi-Stage Fracture 5061.90 5062.00 0
2019-05-29 Multi-Stage Fracture 5043.90 5044.00 0
2019-05-29 Multi-Stage Fracture 5026.00 5026.10 0
2019-05-29 Multi-Stage Fracture 5008.00 5008.10 0
2019-05-29 Multi-Stage Fracture 4990.00 4990.10 0
2019-05-29 Multi-Stage Fracture 4972.10 4972.20 0
2019-05-29 Multi-Stage Fracture 4954.10 4954.20 0
2019-05-29 Multi-Stage Fracture 4936.20 4936.30 0
2019-05-29 Multi-Stage Fracture 4918.30 4918.40 0
2019-05-28 Multi-Stage Fracture 5706.90 5707.00 0
2019-05-29 Multi-Stage Fracture 4900.40 4900.50 0
2019-05-29 Multi-Stage Fracture 4882.40 4882.50 0
2019-05-29 Multi-Stage Fracture 4864.40 4864.50 0
2019-05-29 Multi-Stage Fracture 4846.40 4846.50 0
2019-05-29 Multi-Stage Fracture 4828.40 4828.50 0
2019-05-29 Multi-Stage Fracture 4810.50 4810.60 0
2019-05-29 Multi-Stage Fracture 4792.60 4792.70 0
2019-05-29 Multi-Stage Fracture 4774.60 4774.70 0
2019-05-29 Multi-Stage Fracture 4756.70 4756.80 0
2019-05-29 Multi-Stage Fracture 4738.70 4738.80 0
2019-05-28 Multi-Stage Fracture 5689.00 5689.10 0
2019-05-29 Multi-Stage Fracture 4720.80 4720.90 0
2019-05-29 Multi-Stage Fracture 4702.90 4703.00 0
2019-05-29 Multi-Stage Fracture 4684.90 4685.00 0
2019-05-29 Multi-Stage Fracture 4666.90 4667.00 0
2019-05-29 Multi-Stage Fracture 4648.90 4649.00 0
2019-05-29 Multi-Stage Fracture 4631.10 4631.20 0
2019-05-29 Multi-Stage Fracture 4613.10 4613.20 0
2019-05-29 Multi-Stage Fracture 4595.20 4595.30 0
2019-05-29 Multi-Stage Fracture 4577.30 4577.40 0
2019-05-29 Multi-Stage Fracture 4559.30 4559.40 0
2019-05-28 Multi-Stage Fracture 5671.10 5671.20 0
2019-05-29 Multi-Stage Fracture 4541.30 4541.40 0
2019-05-29 Multi-Stage Fracture 4523.30 4523.40 0
2019-05-29 Multi-Stage Fracture 4505.40 4505.50 0
2019-05-29 Multi-Stage Fracture 4487.50 4487.60 0
2019-05-29 Multi-Stage Fracture 4469.50 4469.60 0
2019-05-29 Multi-Stage Fracture 4451.60 4451.70 0
2019-05-30 Multi-Stage Fracture 4433.70 4433.80 0
2019-05-30 Multi-Stage Fracture 4415.80 4415.90 0
2019-05-30 Multi-Stage Fracture 4397.90 4398.00 0
2019-05-30 Multi-Stage Fracture 4379.90 4380.00 0
2019-05-28 Multi-Stage Fracture 5653.10 5653.20 0
2019-05-30 Multi-Stage Fracture 4362.00 4362.10 0
2019-05-30 Multi-Stage Fracture 4344.00 4344.10 0
2019-05-30 Multi-Stage Fracture 4326.20 4326.30 0
2019-05-30 Multi-Stage Fracture 4308.30 4308.40 0
2019-05-30 Multi-Stage Fracture 4290.30 4290.40 0
2019-05-30 Multi-Stage Fracture 4272.40 4272.50 0
2019-05-30 Multi-Stage Fracture 4254.40 4254.50 0
2019-05-30 Multi-Stage Fracture 4236.50 4236.60 0
2019-05-30 Multi-Stage Fracture 4218.50 4218.60 0
2019-05-30 Multi-Stage Fracture 4200.60 4200.70 0
2019-05-28 Multi-Stage Fracture 5635.30 5635.40 0
2019-05-30 Multi-Stage Fracture 4182.60 4182.70 0
2019-05-30 Multi-Stage Fracture 4164.70 4164.80 0
2019-05-30 Multi-Stage Fracture 4146.90 4147.00 0
2019-05-30 Multi-Stage Fracture 4129.10 4129.20 0
2019-05-30 Multi-Stage Fracture 4111.10 4111.20 0
2019-05-30 Multi-Stage Fracture 4093.10 4093.20 0
2019-05-30 Multi-Stage Fracture 4075.20 4075.30 0
2019-05-30 Multi-Stage Fracture 4057.30 4057.40 0
2019-05-30 Multi-Stage Fracture 4039.50 4039.60 0
2019-05-30 Multi-Stage Fracture 4021.60 4021.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-05-28 2019-05-31 2,424 17,799 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 94.7321 N/A
20/40 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 4.9158 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 0.352 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0093 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0093 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0801 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0801 N/A
ELEFR-3A Element Friction Reducer Non-hazardous Ingredients Not Available 100 0.0084 N/A
Tergitol 15-S-20 68131-40-8 100 0.0084 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.0491 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0491 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0556 N/A
Methanol 67-56-1 100 0.0556 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0556 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-05-30 2019-05-31 Surface Water - Lake 3827
2019-05-27 2019-05-30 Groundwater - Non-saline less than or equal to 150m deep 13536
2019-05-27 2019-05-31 Oilfield Produced Water 300
2019-05-27 2019-05-30 Oilfield Produced Water 120
2019-05-28 2019-05-31 Oilfield Produced Water 118
2019-05-31 2019-05-31 Oilfield Produced Water 21

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 4754 0.0 0.0 0.0
2020 2030 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-12 No Incident Encountered 0.00 0.00
2019-06-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References