X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375081308000

Well Details

Well ID: 0375081308000
Loading map...
Location: 00/08-13-037-08W5/0
Location Alias: 00/08-13-37-08 W5M
Location Alias 2: 00/08-13-037-08 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 08
Section: 13
County/Municipality: Clearwater County
Well Name: CVE CHEDDER 8-13-37-8
Operator Name: Cenovus Energy Inc.
License Number: 0142152
License Date: 1989-12-14
License Status: Suspension
Spud Date: 1989-12-20
Final Drill Date: 1990-01-18
Well Total Depth: 2800.00 m
Surface Hole Latitude: 52.174211
Surface Hole Longitude: -115.009693

For data sources see[1][2]

Well History

Date Event
1989-12-14 Obtained License
1989-12-20 Lost Circulation Occurred
1989-12-24 Surface Casing Operation Performed
1989-12-31 Direction Drilling Operation Performed - Deviate
1990-01-18 Finished Drilling
1990-01-19 Well Log Performed
1990-01-21 Production Casing Operation Performed
1990-01-22 Rig Released
1990-01-23 Well Log Performed
1990-01-24 Well Log Performed
1990-02-08 Well Mode changed to Drilled and Cased
1990-02-27 Well Log Performed
1990-02-28 Perforation Treatment Performed - Jet Perforation
1990-03-01 Well Began Production
1990-03-01 Well Fluid changed to Crude Oil
1990-03-01 Well Mode changed to Flowing
1990-03-03 Perforation Treatment Performed - Fractured
1999-01-01 Well Fluid changed to Crude Oil
1999-01-01 Well Mode changed to Suspended
2002-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-27 Plug Back Performed
2002-11-27 Well Fluid changed to Crude Oil
2002-11-27 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-12-31 1190.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-02-28 Perforation 2724.00 2727.50 20
1990-03-03 Fracture 2724.00 2727.50 0
2002-11-27 Packing Device Capped w/Cement 2707.00 2715.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2140 0.0 0.0 0.0
1991 2302 0.0 0.0 0.0
1992 2400 0.0 0.0 0.0
1993 3914 0.0 0.0 0.0
1994 2148 0.0 0.0 0.0
1995 757 0.0 0.0 0.0
1996 70 0.0 0.0 0.0
1997 3235 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-12-20 Lost Circulation 24.00 24.00

For data sources see[7]

References