X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375072807000

Well Details

Well ID: 0375072807000
Loading map...
Location: 00/07-28-037-07W5/0
Location Alias: 00/07-28-37-07 W5M
Location Alias 2: 00/07-28-037-07 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 07
Section: 28
County/Municipality: Clearwater County
Well Name: CVE CHEDDER 7-28-37-7
Operator Name: Cenovus Energy Inc.
License Number: 0115462
License Date: 1985-06-19
License Status: RecCertified
Spud Date: 1985-06-22
Final Drill Date: 1985-08-04
Well Total Depth: 3595.00 m
Surface Hole Latitude: 52.207243
Surface Hole Longitude: -114.940870

For data sources see[1][2]

Well History

Date Event
1985-06-19 Obtained License
1985-06-24 Surface Casing Operation Performed
1985-07-27 Well Log Performed
1985-07-28 Well Log Performed
1985-07-29 Production Casing Operation Performed
1985-08-02 Direction Drilling Operation Performed - Deviate
1985-08-04 Finished Drilling
1985-08-04 Well Mode changed to Drilled and Cased
1985-08-05 Plug Back Performed
1985-08-05 Well Log Performed
1985-08-07 Rig Released
1985-08-18 Well Log Performed
1985-08-19 Perforation Treatment Performed - Jet Perforation
1985-08-22 Perforation Treatment Performed - Fractured
1985-08-26 Well Log Performed
1985-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-08-27 Plug Back Performed
1985-08-27 Well Log Performed
1985-08-28 Perforation Treatment Performed - Jet Perforation
1985-08-30 Perforation Treatment Performed - Fractured
1985-09-04 Well Log Performed
1985-12-17 Well Began Production
1985-12-17 Well Fluid changed to Crude Oil
1985-12-17 Well Mode changed to Pumping
1991-02-01 Well Fluid changed to Crude Oil
1991-02-01 Well Mode changed to Suspended
1991-03-01 Well Fluid changed to Crude Oil
1991-03-01 Well Mode changed to Flowing
1991-03-23 Perforation Treatment Performed - Cement Squeeze
1991-03-23 Plug Back Performed
1991-03-26 Perforation Treatment Performed - Jet Perforation
1991-03-31 Perforation Treatment Performed - Cement Squeeze
1991-03-31 Plug Back Performed
1991-04-04 Perforation Treatment Performed - Jet Perforation
1991-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-04-07 Plug Back Performed
1991-04-08 Perforation Treatment Performed - Jet Perforation
1991-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-04-13 Plug Back Performed
1991-04-13 Well Fluid changed to Crude Oil
1991-04-13 Well Mode changed to Abandoned
1991-04-14 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-08-02 3493.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-08-19 Perforation 2774.00 2777.00 13
1991-04-05 Acid Treatment 3373.50 3376.50 0
1991-04-07 Packing Device Capped w/Cement 3352.00 3360.00 0
1991-04-08 Perforation 2928.50 2933.50 13
1991-04-09 Acid Treatment 2928.50 2933.50 0
1991-04-13 Packing Device Capped w/Cement 2914.00 2922.00 0
1985-08-22 Fracture 2774.00 2777.00 0
1985-08-27 Packing Device Capped w/Cement 2762.00 2770.00 0
1985-08-28 Perforation 2252.00 2254.00 13
1985-08-30 Fracture 2252.00 2254.00 0
1991-03-23 Cement Squeeze 2252.00 2254.00 0
1991-03-26 Perforation 2774.00 2777.00 13
1991-03-31 Cement Squeeze 2774.00 2777.00 0
1991-04-04 Perforation 3373.50 3376.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 389 0.0 0.0 0.0
1986 2374 0.0 0.0 0.0
1987 1663 0.0 0.0 0.0
1988 1139 0.0 0.0 0.0
1991 1 0.0 0.0 0.0

For data sources see[6]

References