X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375072715000

Well Details

Well ID: 0375072715000
Loading map...
Location: 00/15-27-037-07W5/0
Location Alias: 00/15-27-37-07 W5M
Location Alias 2: 00/15-27-037-07 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 07
Section: 27
County/Municipality: Clearwater County
Well Name: CVE CHEDDER 15-27-37-7
Operator Name: Cenovus Energy Inc.
License Number: 0125302
License Date: 1986-12-19
License Status: Abandoned
Spud Date: 1986-12-23
Final Drill Date: 1987-03-15
Well Total Depth: 3772.00 m
Surface Hole Latitude: 52.216127
Surface Hole Longitude: -114.916436

For data sources see[1][2]

Well History

Date Event
1986-12-19 Obtained License
1986-12-25 Surface Casing Operation Performed
1986-12-28 Lost Circulation Occurred
1987-01-06 Lost Circulation Occurred
1987-01-13 Drill Stem Test Performed
1987-01-14 Direction Drilling Operation Performed - Deviate
1987-03-04 Well Log Performed
1987-03-05 Well Log Performed
1987-03-09 Lost Circulation Occurred
1987-03-09 Production Casing Operation Performed
1987-03-13 Drill Stem Test Performed
1987-03-14 Lost Circulation Occurred
1987-03-15 Finished Drilling
1987-03-16 Well Log Performed
1987-03-18 Lost Circulation Occurred
1987-03-20 Plug Back Performed
1987-03-22 Rig Released
1987-03-25 Well Log Performed
1987-03-28 Perforation Treatment Performed - Jet Perforation
1987-03-28 Well Log Performed
1987-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-31 Well Log Performed
1987-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-04-01 Perforation Treatment Performed - Jet Perforation
1987-04-02 Well Log Performed
1987-04-07 Well Mode changed to Drilled and Cased
1987-09-24 Well Began Production
1987-09-24 Well Fluid changed to Gas
1987-09-24 Well Mode changed to Flowing
1988-06-06 Well Log Performed
1988-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-07-12 Well Log Performed
1990-03-08 Perforation Treatment Performed - Cement Plug
1990-03-08 Well Log Performed
1990-06-11 Well Log Performed
1990-06-12 Perforation Treatment Performed - Cement Plug
1995-02-28 Well Fluid changed to Gas
1995-02-28 Well Mode changed to Suspended
1997-03-25 Well Log Performed
1997-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-26 Plug Back Performed
1997-03-26 Well Fluid changed to Gas
1997-03-26 Well Mode changed to Abandoned Zone
1997-12-07 Perforation Treatment Performed - Jet Perforation
1997-12-07 Well Log Performed
1997-12-08 Perforation Treatment Performed - Cement Squeeze
1997-12-11 Perforation Treatment Performed - Jet Perforation
1997-12-11 Well Log Performed
1997-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-06-14 Perforation Treatment Performed - Cement Squeeze
2012-06-17 Perforation Treatment Performed - Jet Perforation
2012-06-17 Well Log Performed
2012-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-19 Perforation Treatment Performed - Jet Perforation
2012-06-19 Well Log Performed
2012-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-20 Perforation Treatment Performed - Jet Perforation
2012-06-20 Well Log Performed
2012-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-21 Perforation Treatment Performed - Jet Perforation
2012-06-21 Well Log Performed
2012-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-22 Perforation Treatment Performed - Remedial Casing
2012-06-23 Perforation Treatment Performed - Jet Perforation
2012-06-23 Well Log Performed
2012-06-25 Perforation Treatment Performed - Jet Perforation
2012-06-25 Well Log Performed
2012-06-26 Perforation Treatment Performed - Remedial Casing
2012-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-27 Perforation Treatment Performed - Jet Perforation
2012-06-27 Well Log Performed
2012-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-28 Perforation Treatment Performed - Jet Perforation
2012-06-28 Well Log Performed
2012-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-04 Perforation Treatment Performed - Remedial Casing
2012-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-05 Perforation Treatment Performed - Jet Perforation
2012-07-05 Perforation Treatment Performed - Remedial Casing
2012-07-05 Well Log Performed
2012-07-06 Perforation Treatment Performed - Jet Perforation
2012-07-06 Well Log Performed
2012-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-07 Perforation Treatment Performed - Remedial Casing
2012-07-11 Well Abandoned
2012-07-11 Well Fluid changed to Gas
2012-07-11 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1987-01-14 2456.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-03-28 Perforation 3650.50 3655.50 16
1997-12-07 Perforation 2883.00 2884.00 13
1997-12-07 Perforation 2907.00 2908.00 13
1997-12-08 Cement Squeeze 2883.00 2908.00 0
1997-12-11 Perforation 2894.00 2897.00 17
1997-12-12 Acid Treatment 2883.00 2884.00 0
2012-06-14 Cement Squeeze 2894.00 2897.00 0
2012-06-17 Perforation 3260.00 3261.00 17
2012-06-19 Packing Device Capped w/Cement 3246.80 3255.20 0
2012-06-19 Perforation 2940.00 2941.00 17
2012-06-20 Packing Device Capped w/Cement 2921.80 2930.20 0
1987-03-29 Acid Treatment 3650.50 3655.50 0
2012-06-20 Packing Device Capped w/Cement 2872.80 2881.20 0
2012-06-20 Perforation 2800.00 2801.00 17
2012-06-21 Packing Device Capped w/Cement 2782.80 2791.20 0
2012-06-21 Perforation 2520.00 2521.00 17
2012-06-22 Remedial Casing Cementing 2520.00 2521.00 0
2012-06-22 Packing Device Capped w/Cement 2505.00 2514.90 0
2012-06-23 Perforation 2330.00 2331.00 17
2012-06-25 Perforation 2320.00 2321.00 17
2012-06-26 Remedial Casing Cementing 2320.00 2321.00 0
2012-06-27 Packing Device Capped w/Cement 2306.90 2314.90 0
1987-04-01 Perforation 3622.50 3629.00 16
2012-06-27 Perforation 2193.00 2194.00 17
2012-06-27 Packing Device Capped w/Cement 2179.80 2187.80 0
2012-06-27 Perforation 1984.00 1985.00 17
2012-06-28 Packing Device Capped w/Cement 1966.80 1975.20 0
2012-06-28 Perforation 1530.00 1531.00 17
2012-07-04 Remedial Casing Cementing 1530.00 1531.00 0
2012-07-04 Packing Device Capped w/Cement 1513.00 1524.90 0
2012-07-05 Perforation 916.00 917.00 17
2012-07-05 Remedial Casing Cementing 916.00 917.00 0
2012-07-05 Packing Device Capped w/Cement 900.30 910.90 0
1987-04-01 Perforation 3635.00 3639.50 16
2012-07-06 Perforation 600.00 601.00 17
2012-07-07 Remedial Casing Cementing 600.00 601.00 0
2012-07-07 Packing Device Capped w/Cement 584.00 594.90 0
1987-04-01 Acid Treatment 3622.50 3639.50 0
1988-07-12 Packing Device Capped w/Cement 3646.00 3648.50 0
1990-03-08 Cement Plug 3642.00 3646.00 0
1990-06-12 Cement Plug 3634.30 3642.00 0
1997-03-26 Packing Device Capped w/Cement 3547.00 3555.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 2120 0.0 0.0 0.0
1988 7383 0.0 0.0 0.0
1989 7256 0.0 0.0 0.0
1990 8281 0.0 0.0 0.0
1991 7408 0.0 0.0 0.0
1992 8622 0.0 0.0 0.0
1993 8580 0.0 0.0 0.0
1994 7495 0.0 0.0 0.0
1995 1396 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-12-28 Lost Circulation 1045.00 1217.00
1987-01-06 Lost Circulation 2141.00 2803.00
1987-03-14 Lost Circulation 3694.00 3694.00
1987-03-09 Lost Circulation 3675.00 3675.00
1987-03-18 Lost Circulation 3772.00 3772.00
2012-07-11 No Incident Encountered 0.00 0.00

For data sources see[7]

References