X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375071814040

Well Details

Well ID: 0375071814040
Loading map...
Location: 04/14-18-037-07W5/0
Location Alias: 04/14-18-37-07 W5M
Location Alias 2: 04/14-18-037-07 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 07
Section: 18
County/Municipality: Clearwater County
Well Name: YANGARRA HZ 103 CHEDDER 14-18-37-7
Operator Name: Yangarra Resources Corp.
License Number: 0493485
License Date: 2019-01-18
License Status: Issued
Spud Date: 2019-01-18
Final Drill Date: 2019-02-01
Well Total Depth: 5611.00 m
Surface Hole Latitude: 52.157446
Surface Hole Longitude: -114.992691

For data sources see[1][2]

Well History

Date Event
2019-01-18 Obtained License
2019-01-20 Surface Casing Operation Performed
2019-01-23 Well Log Performed
2019-01-25 Direction Drilling Operation Performed - Deviate
2019-01-27 Direction Drilling Operation Performed - Horizontal
2019-02-01 Finished Drilling
2019-02-01 Well Mode changed to Drilled and Cased
2019-02-02 Well Log Performed
2019-02-05 Production Casing Operation Performed
2019-02-05 Rig Released
2019-03-01 Well Began Production
2019-03-01 Well Fluid changed to Crude Oil
2019-03-01 Well Mode changed to Flowing
2019-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-23 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-18 Stampede Drilling A Division Of Matrix Energy Technologi 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-25 2111.70 Deviate (5 - 79 degrees)
2019-01-27 2521.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-07 Multi-Stage Fracture 5561.70 5561.80 0
2019-03-18 Multi-Stage Fracture 5394.50 5394.60 0
2019-03-20 Multi-Stage Fracture 3753.30 3753.40 0
2019-03-20 Multi-Stage Fracture 3734.50 3734.60 0
2019-03-20 Multi-Stage Fracture 3715.70 3715.80 0
2019-03-20 Multi-Stage Fracture 3696.90 3697.00 0
2019-03-20 Multi-Stage Fracture 3677.90 3678.00 0
2019-03-20 Multi-Stage Fracture 3659.10 3659.20 0
2019-03-20 Multi-Stage Fracture 3640.90 3641.00 0
2019-03-20 Multi-Stage Fracture 3622.20 3622.30 0
2019-03-20 Multi-Stage Fracture 3603.40 3603.50 0
2019-03-20 Multi-Stage Fracture 3584.30 3584.40 0
2019-03-18 Multi-Stage Fracture 5379.20 5379.30 0
2019-03-21 Multi-Stage Fracture 3565.50 3565.60 0
2019-03-21 Multi-Stage Fracture 3547.10 3547.20 0
2019-03-21 Multi-Stage Fracture 3528.70 3528.80 0
2019-03-21 Multi-Stage Fracture 3510.20 3510.30 0
2019-03-21 Multi-Stage Fracture 3491.30 3491.40 0
2019-03-21 Multi-Stage Fracture 3472.50 3472.60 0
2019-03-21 Multi-Stage Fracture 3454.30 3454.40 0
2019-03-21 Multi-Stage Fracture 3436.00 3436.10 0
2019-03-21 Multi-Stage Fracture 3417.70 3417.80 0
2019-03-21 Multi-Stage Fracture 3399.30 3399.40 0
2019-03-18 Multi-Stage Fracture 5361.10 5361.20 0
2019-03-21 Multi-Stage Fracture 3381.10 3381.20 0
2019-03-21 Multi-Stage Fracture 3362.70 3362.80 0
2019-03-21 Multi-Stage Fracture 3344.30 3344.40 0
2019-03-21 Multi-Stage Fracture 3326.30 3326.40 0
2019-03-21 Multi-Stage Fracture 3307.90 3308.00 0
2019-03-22 Multi-Stage Fracture 3289.60 3289.70 0
2019-03-22 Multi-Stage Fracture 3271.30 3271.40 0
2019-03-22 Multi-Stage Fracture 3253.10 3253.20 0
2019-03-22 Multi-Stage Fracture 3234.80 3234.90 0
2019-03-22 Multi-Stage Fracture 3216.60 3216.70 0
2019-03-18 Multi-Stage Fracture 5343.40 5343.50 0
2019-03-22 Multi-Stage Fracture 3198.40 3198.50 0
2019-03-22 Multi-Stage Fracture 3180.00 3180.10 0
2019-03-22 Multi-Stage Fracture 3161.80 3161.90 0
2019-03-22 Multi-Stage Fracture 3143.50 3143.60 0
2019-03-22 Multi-Stage Fracture 3125.30 3125.40 0
2019-03-22 Multi-Stage Fracture 3107.10 3107.20 0
2019-03-22 Multi-Stage Fracture 3088.70 3088.80 0
2019-03-22 Multi-Stage Fracture 3070.70 3070.80 0
2019-03-22 Multi-Stage Fracture 3052.30 3052.40 0
2019-03-22 Multi-Stage Fracture 3034.10 3034.20 0
2019-03-18 Multi-Stage Fracture 5325.20 5325.30 0
2019-03-22 Multi-Stage Fracture 3015.70 3015.80 0
2019-03-22 Multi-Stage Fracture 2997.60 2997.70 0
2019-03-22 Multi-Stage Fracture 2979.30 2979.40 0
2019-03-22 Multi-Stage Fracture 2961.00 2961.10 0
2019-03-22 Multi-Stage Fracture 2942.80 2942.90 0
2019-03-22 Multi-Stage Fracture 2924.60 2924.70 0
2019-03-22 Multi-Stage Fracture 2906.40 2906.50 0
2019-03-23 Multi-Stage Fracture 2888.20 2888.30 0
2019-03-23 Multi-Stage Fracture 2870.00 2870.10 0
2019-03-23 Multi-Stage Fracture 2851.80 2851.90 0
2019-03-18 Multi-Stage Fracture 5307.00 5307.10 0
2019-03-23 Multi-Stage Fracture 2833.70 2833.80 0
2019-03-23 Multi-Stage Fracture 2815.30 2815.40 0
2019-03-23 Multi-Stage Fracture 2797.10 2797.20 0
2019-03-23 Multi-Stage Fracture 2778.90 2779.00 0
2019-03-23 Multi-Stage Fracture 2760.60 2760.70 0
2019-03-23 Multi-Stage Fracture 2742.50 2742.60 0
2019-03-23 Multi-Stage Fracture 2724.40 2724.50 0
2019-03-23 Multi-Stage Fracture 2706.20 2706.30 0
2019-03-23 Multi-Stage Fracture 2688.00 2688.10 0
2019-03-23 Multi-Stage Fracture 2669.80 2669.90 0
2019-03-18 Multi-Stage Fracture 5288.80 5288.90 0
2019-03-23 Multi-Stage Fracture 2651.70 2651.80 0
2019-03-23 Multi-Stage Fracture 2633.40 2633.50 0
2019-03-23 Multi-Stage Fracture 2615.20 2615.30 0
2019-03-23 Multi-Stage Fracture 2597.00 2597.10 0
2019-03-23 Multi-Stage Fracture 2579.00 2579.10 0
2019-03-23 Multi-Stage Fracture 2560.70 2560.80 0
2019-03-23 Multi-Stage Fracture 2542.40 2542.50 0
2019-03-23 Multi-Stage Fracture 2524.20 2524.30 0
2019-03-18 Multi-Stage Fracture 5270.60 5270.70 0
2019-03-18 Multi-Stage Fracture 5252.30 5252.40 0
2019-03-18 Multi-Stage Fracture 5234.10 5234.20 0
2019-03-18 Multi-Stage Fracture 5529.30 5529.40 0
2019-03-18 Multi-Stage Fracture 5215.90 5216.00 0
2019-03-18 Multi-Stage Fracture 5197.80 5197.90 0
2019-03-18 Multi-Stage Fracture 5179.60 5179.70 0
2019-03-18 Multi-Stage Fracture 5161.50 5161.60 0
2019-03-18 Multi-Stage Fracture 5143.50 5143.60 0
2019-03-19 Multi-Stage Fracture 5125.30 5125.40 0
2019-03-19 Multi-Stage Fracture 5107.00 5107.10 0
2019-03-19 Multi-Stage Fracture 5089.40 5089.50 0
2019-03-19 Multi-Stage Fracture 5071.20 5071.30 0
2019-03-19 Multi-Stage Fracture 5053.00 5053.10 0
2019-03-18 Multi-Stage Fracture 5511.10 5511.20 0
2019-03-19 Multi-Stage Fracture 5035.00 5035.10 0
2019-03-19 Multi-Stage Fracture 5016.80 5016.90 0
2019-03-19 Multi-Stage Fracture 4998.80 4998.90 0
2019-03-19 Multi-Stage Fracture 4980.60 4980.70 0
2019-03-19 Multi-Stage Fracture 4962.40 4962.50 0
2019-03-19 Multi-Stage Fracture 4944.00 4944.10 0
2019-03-19 Multi-Stage Fracture 4925.90 4926.00 0
2019-03-19 Multi-Stage Fracture 4907.60 4907.70 0
2019-03-19 Multi-Stage Fracture 4889.40 4889.50 0
2019-03-19 Multi-Stage Fracture 4871.10 4871.20 0
2019-03-18 Multi-Stage Fracture 5493.10 5493.20 0
2019-03-19 Multi-Stage Fracture 4852.90 4853.00 0
2019-03-19 Multi-Stage Fracture 4834.70 4834.80 0
2019-03-19 Multi-Stage Fracture 4816.30 4816.40 0
2019-03-19 Multi-Stage Fracture 4798.00 4798.10 0
2019-03-19 Multi-Stage Fracture 4779.20 4779.30 0
2019-03-19 Multi-Stage Fracture 4760.30 4760.40 0
2019-03-19 Multi-Stage Fracture 4741.60 4741.70 0
2019-03-19 Multi-Stage Fracture 4723.20 4723.30 0
2019-03-19 Multi-Stage Fracture 4704.80 4704.90 0
2019-03-19 Multi-Stage Fracture 4686.60 4686.70 0
2019-03-18 Multi-Stage Fracture 5475.50 5475.60 0
2019-03-19 Multi-Stage Fracture 4667.80 4667.90 0
2019-03-19 Multi-Stage Fracture 4649.00 4649.10 0
2019-03-19 Multi-Stage Fracture 4630.70 4630.80 0
2019-03-19 Multi-Stage Fracture 4612.50 4612.60 0
2019-03-19 Multi-Stage Fracture 4594.30 4594.40 0
2019-03-19 Multi-Stage Fracture 4576.10 4576.20 0
2019-03-19 Multi-Stage Fracture 4557.90 4558.00 0
2019-03-19 Multi-Stage Fracture 4539.70 4539.80 0
2019-03-19 Multi-Stage Fracture 4521.60 4521.70 0
2019-03-19 Multi-Stage Fracture 4503.40 4503.50 0
2019-03-18 Multi-Stage Fracture 5460.10 5460.20 0
2019-03-19 Multi-Stage Fracture 4485.20 4485.30 0
2019-03-19 Multi-Stage Fracture 4467.00 4467.10 0
2019-03-19 Multi-Stage Fracture 4448.80 4448.90 0
2019-03-19 Multi-Stage Fracture 4430.70 4430.80 0
2019-03-19 Multi-Stage Fracture 4412.50 4412.60 0
2019-03-19 Multi-Stage Fracture 4394.30 4394.40 0
2019-03-19 Multi-Stage Fracture 4376.40 4376.50 0
2019-03-19 Multi-Stage Fracture 4358.20 4358.30 0
2019-03-19 Multi-Stage Fracture 4340.50 4340.60 0
2019-03-20 Multi-Stage Fracture 4322.70 4322.80 0
2019-03-18 Multi-Stage Fracture 5443.10 5443.20 0
2019-03-20 Multi-Stage Fracture 4304.60 4304.70 0
2019-03-20 Multi-Stage Fracture 4286.30 4286.40 0
2019-03-20 Multi-Stage Fracture 4268.00 4268.10 0
2019-03-20 Multi-Stage Fracture 4249.70 4249.80 0
2019-03-20 Multi-Stage Fracture 4231.30 4231.40 0
2019-03-20 Multi-Stage Fracture 4213.00 4213.10 0
2019-03-20 Multi-Stage Fracture 4194.60 4194.70 0
2019-03-20 Multi-Stage Fracture 4176.30 4176.40 0
2019-03-20 Multi-Stage Fracture 4157.90 4158.00 0
2019-03-20 Multi-Stage Fracture 4139.60 4139.70 0
2019-03-18 Multi-Stage Fracture 5425.30 5425.40 0
2019-03-20 Multi-Stage Fracture 4121.60 4121.70 0
2019-03-20 Multi-Stage Fracture 4103.40 4103.50 0
2019-03-20 Multi-Stage Fracture 4085.00 4085.10 0
2019-03-20 Multi-Stage Fracture 4066.70 4066.80 0
2019-03-20 Multi-Stage Fracture 4048.50 4048.60 0
2019-03-20 Multi-Stage Fracture 4030.30 4030.40 0
2019-03-20 Multi-Stage Fracture 4012.80 4012.90 0
2019-03-20 Multi-Stage Fracture 3994.70 3994.80 0
2019-03-20 Multi-Stage Fracture 3976.50 3976.60 0
2019-03-20 Multi-Stage Fracture 3958.40 3958.50 0
2019-03-18 Multi-Stage Fracture 5409.90 5410.00 0
2019-03-20 Multi-Stage Fracture 3940.20 3940.30 0
2019-03-20 Multi-Stage Fracture 3921.90 3922.00 0
2019-03-20 Multi-Stage Fracture 3903.00 3903.10 0
2019-03-20 Multi-Stage Fracture 3884.10 3884.20 0
2019-03-20 Multi-Stage Fracture 3865.10 3865.20 0
2019-03-20 Multi-Stage Fracture 3846.10 3846.20 0
2019-03-20 Multi-Stage Fracture 3827.80 3827.90 0
2019-03-20 Multi-Stage Fracture 3809.60 3809.70 0
2019-03-20 Multi-Stage Fracture 3790.70 3790.80 0
2019-03-20 Multi-Stage Fracture 3772.00 3772.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-07 2019-03-23 2,395 18,291 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 95.6173 N/A
20/40 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 4.5776 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 0.3257 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0091 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0091 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0799 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0799 N/A
ELEFR-3A Element Friction Reducer Non-hazardous Ingredients Not Available 100 0.0207 N/A
Tergitol 15-S-20 68131-40-8 100 0.0207 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.0399 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0399 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0637 N/A
Methanol 67-56-1 100 0.0637 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0637 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-03-18 2019-03-23 Surface Water - Runoff 18274
2019-03-07 2019-03-13 Recycled Fracturing Water (treated at well site) 147
2019-03-06 2019-03-13 Recycled Fracturing Water (treated at well site) 850

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5582 0.0 0.0 0.0
2020 2035 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-05 No Incident Encountered 0.00 0.00
2019-03-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References