If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375061504020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.176823,"lon":-114.785513,"icon":""}]} |
Location: 02/04-15-037-06W5/0 | |
Location Alias: 02/04-15-37-06 W5M | |
Location Alias 2: 02/04-15-037-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 06 | |
Section: 15 | |
County/Municipality: Clearwater County | |
Well Name: CVE GARR 4-15-37-6 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0343300 | |
License Date: 2005-11-23 | |
License Status: Issued | |
Spud Date: 2006-02-27 | |
Final Drill Date: 2006-03-04 | |
Well Total Depth: 2205.00 m | |
Surface Hole Latitude: 52.176823 | |
Surface Hole Longitude: -114.785513 |
Date | Event |
---|---|
2005-11-23 | Obtained License |
2006-03-01 | Surface Casing Operation Performed |
2006-03-04 | Finished Drilling |
2006-03-04 | Well Mode changed to Drilled and Cased |
2006-03-05 | Well Log Performed |
2006-03-06 | Production Casing Operation Performed |
2006-03-06 | Rig Released |
2006-03-16 | Perforation Treatment Performed - Jet Perforation |
2006-03-16 | Well Log Performed |
2006-03-17 | Perforation Treatment Performed - Fractured |
2006-12-05 | Well Began Production |
2006-12-05 | Well Fluid changed to Crude Oil |
2006-12-05 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-03-16 | Perforation | 2176.50 | 2179.00 | 20 |
2006-03-17 | Fracture | 2176.50 | 2179.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 415 | 0.0 | 0.0 | 0.0 |
2007 | 8438 | 0.0 | 0.0 | 0.0 |
2008 | 8683 | 0.0 | 0.0 | 0.0 |
2009 | 8560 | 0.0 | 0.0 | 0.0 |
2010 | 8590 | 0.0 | 0.0 | 0.0 |
2011 | 8739 | 0.0 | 0.0 | 0.0 |
2012 | 8584 | 0.0 | 0.0 | 0.0 |
2013 | 4173 | 0.0 | 0.0 | 0.0 |
2014 | 8448 | 0.0 | 0.0 | 0.0 |
2015 | 7974 | 0.0 | 0.0 | 0.0 |
2016 | 8675 | 0.0 | 0.0 | 0.0 |
2017 | 8320 | 0.0 | 0.0 | 0.0 |
2018 | 8747 | 0.0 | 0.0 | 0.0 |
2019 | 8628 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]