X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375043408002

Well Details

Well ID: 0375043408002
Loading map...
Location: 00/08-34-037-04W5/2
Location Alias: 00/08-34-37-04 W5M
Location Alias 2: 00/08-34-037-04 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 34
County/Municipality: Clearwater County
Well Name: CVE SYLAKE 8-34-37-4
Operator Name: Cenovus Energy Inc.
License Number: 0129610
License Date: 1987-10-23
License Status: Suspension
Spud Date: 1987-10-30
Final Drill Date: 1987-11-12
Well Total Depth: 2378.00 m
Surface Hole Latitude: 52.221172
Surface Hole Longitude: -114.483221

For data sources see[1][2]

Well History

Date Event
1987-10-23 Obtained License
1987-10-31 Surface Casing Operation Performed
1987-11-12 Finished Drilling
1987-11-12 Well Log Performed
1987-11-12 Well Mode changed to Drilled and Cased
1987-11-14 Drill Stem Test Performed
1987-11-15 Production Casing Operation Performed
1987-11-15 Rig Released
1988-01-23 Well Log Performed
1988-01-24 Well Log Performed
1988-01-25 Perforation Treatment Performed - Jet Perforation
1988-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-01-27 Well Log Performed
1988-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-01-28 Plug Back Performed
1988-01-28 Well Log Performed
1988-01-29 Perforation Treatment Performed - Jet Perforation
1988-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-05 Perforation Treatment Performed - Fractured
1990-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-10 Plug Back Performed
1993-08-10 Well Log Performed
1993-08-11 Perforation Treatment Performed - Jet Perforation
1993-08-13 Perforation Treatment Performed - Fractured
1993-08-14 Perforation Treatment Performed - Fractured
1993-08-14 Well Log Performed
1993-08-15 Perforation Treatment Performed - Fractured
1993-08-19 Well Began Production
1993-08-19 Well Fluid changed to Gas
1993-08-19 Well Mode changed to Flowing
2002-09-17 Well Log Performed
2007-05-01 Well Fluid changed to Gas
2007-05-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-01-25 Perforation 2349.50 2352.00 13
1993-08-13 Fracture 2086.00 2087.50 0
1993-08-14 Fracture 2086.00 2087.50 0
1993-08-15 Fracture 2086.00 2087.50 0
1988-01-26 Acid Treatment 2349.50 2352.00 0
1988-01-28 Packing Device Capped w/Cement 2337.00 2345.00 0
1988-01-29 Perforation 2310.00 2314.00 13
1988-01-31 Acid Treatment 2310.00 2314.00 0
1988-02-05 Fracture 2310.00 2314.00 0
1990-09-22 Acid Treatment 2310.00 2314.00 0
1993-08-10 Packing Device Capped w/Cement 2299.00 2307.00 0
1993-08-11 Perforation 2086.00 2087.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2404 0.0 0.0 0.0
1994 8255 0.0 0.0 0.0
1995 8271 0.0 0.0 0.0
1996 8289 0.0 0.0 0.0
1997 8633 0.0 0.0 0.0
1998 8675 0.0 0.0 0.0
1999 8147 0.0 0.0 0.0
2000 8587 0.0 0.0 0.0
2001 8398 0.0 0.0 0.0
2002 8466 0.0 0.0 0.0
2003 8735 0.0 0.0 0.0
2004 8735 0.0 0.0 0.0
2005 8498 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8711 0.0 0.0 0.0
2008 8615 0.0 0.0 0.0
2009 8615 0.0 0.0 0.0
2010 8663 0.0 0.0 0.0
2011 8185 0.0 0.0 0.0
2012 8040 0.0 0.0 0.0
2013 7950 0.0 0.0 0.0
2014 6524 0.0 0.0 0.0
2015 8079 0.0 0.0 0.0
2016 8544 0.0 0.0 0.0
2017 1416 0.0 0.0 0.0

For data sources see[5]

References