If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375042604002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.206061,"lon":-114.476695,"icon":""}]} |
Location: 00/04-26-037-04W5/2 | |
Location Alias: 00/04-26-37-04 W5M | |
Location Alias 2: 00/04-26-037-04 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 04 | |
Section: 26 | |
County/Municipality: Clearwater County | |
Well Name: CNGL SYLAKE 4-26-37-4 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0157866 | |
License Date: 1993-04-20 | |
License Status: RecCertified | |
Spud Date: 1993-05-03 | |
Final Drill Date: 1993-05-28 | |
Well Total Depth: 2455.00 m | |
Surface Hole Latitude: 52.206061 | |
Surface Hole Longitude: -114.476695 |
Date | Event |
---|---|
1993-04-20 | Obtained License |
1993-05-05 | Surface Casing Operation Performed |
1993-05-10 | Direction Drilling Operation Performed - Deviate |
1993-05-13 | Drill Stem Test Performed |
1993-05-28 | Finished Drilling |
1993-05-29 | Well Log Performed |
1993-05-30 | Well Log Performed |
1993-05-31 | Kick Occurred |
1993-05-31 | Production Casing Operation Performed |
1993-06-02 | Rig Released |
1993-06-04 | Well Log Performed |
1993-06-14 | Perforation Treatment Performed - Jet Perforation |
1993-06-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-06-18 | Perforation Treatment Performed - Cement Squeeze |
1993-06-18 | Perforation Treatment Performed - Jet Perforation |
1993-06-19 | Perforation Treatment Performed - Jet Perforation |
1993-06-21 | Perforation Treatment Performed - Cement Squeeze |
1993-06-24 | Perforation Treatment Performed - Jet Perforation |
1993-08-03 | Perforation Treatment Performed - Cement Squeeze |
1993-08-07 | Perforation Treatment Performed - Jet Perforation |
1993-08-12 | Perforation Treatment Performed - Jet Perforation |
1993-08-12 | Well Mode changed to Drilled and Cased |
1993-08-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-08-20 | Perforation Treatment Performed - Selective Jet Perforations |
1993-08-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-08-27 | Perforation Treatment Performed - Fractured |
1994-10-24 | Well Fluid changed to Crude Oil |
1994-10-24 | Well Mode changed to Potential |
1994-10-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-10-25 | Plug Back Performed |
1994-10-25 | Well Abandoned |
1994-10-25 | Well Fluid changed to Crude Oil |
1994-10-25 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1993-05-10 | 1600.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-06-14 | Perforation | 2380.00 | 2383.80 | 17 |
1993-08-12 | Perforation | 2360.00 | 2370.00 | 17 |
1993-08-13 | Acid Treatment | 2360.00 | 2370.00 | 0 |
1993-08-20 | Selective Jet Perforations | 2361.00 | 2361.00 | 2 |
1993-08-20 | Selective Jet Perforations | 2362.80 | 2362.80 | 1 |
1993-08-20 | Selective Jet Perforations | 2365.30 | 2365.30 | 3 |
1993-08-20 | Selective Jet Perforations | 2365.80 | 2365.80 | 1 |
1993-08-20 | Selective Jet Perforations | 2368.00 | 2368.00 | 1 |
1993-08-23 | Acid Treatment | 2360.00 | 2370.00 | 0 |
1993-08-27 | Fracture | 2360.00 | 2370.00 | 0 |
1994-10-25 | Packing Device Capped w/Cement | 2371.00 | 2379.00 | 0 |
1993-06-16 | Acid Treatment | 2380.00 | 2383.80 | 0 |
1994-10-25 | Packing Device Capped w/Cement | 2342.00 | 2350.00 | 0 |
1993-06-18 | Perforation | 2396.00 | 2398.00 | 17 |
1993-06-18 | Cement Squeeze | 2396.00 | 2398.00 | 0 |
1993-06-19 | Perforation | 2385.00 | 2387.00 | 18 |
1993-06-21 | Cement Squeeze | 2380.00 | 2387.00 | 0 |
1993-06-24 | Perforation | 2380.00 | 2382.00 | 16 |
1993-08-03 | Cement Squeeze | 2380.00 | 2382.00 | 0 |
1993-08-07 | Perforation | 2380.00 | 2382.00 | 16 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1993-05-31 | Kick | 2455.00 | 2455.00 |
For data sources see[7]