X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375042406000

Well Details

Well ID: 0375042406000
Loading map...
Location: 00/06-24-037-04W5/0
Location Alias: 00/06-24-37-04 W5M
Location Alias 2: 00/06-24-037-04 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 24
County/Municipality: Clearwater County
Well Name: CVE SYLAKE 6-24-37-4
Operator Name: Cenovus Energy Inc.
License Number: 0115748
License Date: 1985-06-28
License Status: Abandoned
Spud Date: 1985-07-12
Final Drill Date: 1985-07-25
Well Total Depth: 2355.00 m
Surface Hole Latitude: 52.194880
Surface Hole Longitude: -114.442780

For data sources see[1][2]

Well History

Date Event
1985-06-28 Obtained License
1985-07-14 Surface Casing Operation Performed
1985-07-24 Lost Circulation Occurred
1985-07-25 Finished Drilling
1985-07-25 Well Mode changed to Drilled and Cased
1985-07-27 Well Log Performed
1985-07-28 Drill Stem Test Performed
1985-07-30 Production Casing Operation Performed
1985-07-31 Rig Released
1985-08-12 Perforation Treatment Performed - Abrasa-Jet Perforation
1985-09-01 Well Began Production
1985-09-01 Well Fluid changed to Crude Oil
1985-09-01 Well Mode changed to Pumping
1986-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-08 Well Log Performed
1987-02-09 Perforation Treatment Performed - Cement Squeeze
1987-02-13 Perforation Treatment Performed - Jet Perforation
1987-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-15 Well Fluid changed to Crude Oil
1987-03-15 Well Mode changed to Abandoned
1987-04-07 Well Log Performed
1988-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-03-15 Plug Back Performed
1988-03-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-08-12 Hydra Jet Perforation 2306.50 2307.10 0
1986-08-28 Acid Treatment 2306.50 2307.10 0
1987-02-09 Cement Squeeze 2306.50 2307.10 0
1987-02-13 Perforation 2304.00 2305.00 15
1987-02-14 Acid Treatment 2304.00 2305.00 0
1988-03-15 Packing Device Capped w/Cement 2290.00 2298.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 2535 0.0 0.0 0.0
1986 6984 0.0 0.0 0.0
1987 2305 0.0 0.0 0.0
1988 24 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-07-24 Lost Circulation 2320.00 2355.00

For data sources see[6]

References