X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375041908000

Well Details

Well ID: 0375041908000
Loading map...
Location: 00/08-19-037-04W5/0
Location Alias: 00/08-19-37-04 W5M
Location Alias 2: 00/08-19-037-04 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 19
County/Municipality: Clearwater County
Well Name: ACL SYLAKE 8-19-37-4
Operator Name: Paramount Resources Ltd.
License Number: 0116744
License Date: 1985-08-07
License Status: Issued
Spud Date: 1985-08-07
Final Drill Date: 1985-08-30
Well Total Depth: 2582.40 m
Surface Hole Latitude: 52.194805
Surface Hole Longitude: -114.554313

For data sources see[1][2]

Well History

Date Event
1985-08-07 Obtained License
1985-08-09 Surface Casing Operation Performed
1985-08-30 Finished Drilling
1985-08-30 Well Log Performed
1985-08-30 Well Mode changed to Drilled and Cased
1985-08-31 Well Log Performed
1985-09-02 Drill Stem Test Performed
1985-09-03 Production Casing Operation Performed
1985-09-04 Rig Released
1985-09-27 Well Log Performed
1985-09-29 Perforation Treatment Performed - Jet Perforation
1985-10-05 Perforation Treatment Performed - Jet Perforation
1985-10-05 Well Log Performed
1985-10-09 Perforation Treatment Performed - Jet Perforation
1985-10-09 Well Log Performed
1985-10-17 Well Log Performed
1985-10-20 Perforation Treatment Performed - Jet Perforation
1985-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-07 Well Log Performed
1985-11-18 Well Began Production
1985-11-18 Well Fluid changed to Crude Oil
1985-11-18 Well Mode changed to Pumping
1985-11-29 Well Fluid changed to Crude Oil
1985-11-29 Well Mode changed to Suspended
1987-10-01 Well Fluid changed to Crude Oil
1987-10-01 Well Mode changed to Pumping
1987-10-15 Well Fluid changed to Crude Oil
1987-10-15 Well Mode changed to Suspended
1987-10-16 Well Began Injection
1987-10-16 Well Fluid changed to Water
1987-10-16 Well Type changed to Disposal
1987-10-27 Well Log Performed
1987-10-28 Perforation Treatment Performed - Jet Perforation
1987-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-09-20 Well Log Performed
1995-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-22 Perforation Treatment Performed - Jet Perforation
1995-09-25 Perforation Treatment Performed - Fractured
1995-10-02 Perforation Treatment Performed - Jet Perforation
1995-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-11 Perforation Treatment Performed - Cement Squeeze
1997-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-09-29 Perforation 2508.00 2510.00 13
1987-10-28 Perforation 2503.80 2504.80 13
1987-10-28 Perforation 2506.50 2510.00 13
1987-11-01 Acid Treatment 2481.50 2510.00 0
1991-09-25 Acid Treatment 2481.50 2510.00 0
1995-09-21 Packing Device Capped w/Cement 2467.00 2475.00 0
1995-09-22 Perforation 2350.50 2363.00 18
1995-09-25 Fracture 2350.50 2363.00 0
1995-10-02 Perforation 2481.50 2483.50 13
1995-10-02 Perforation 2486.50 2489.00 13
1995-10-02 Perforation 2492.00 2497.50 13
1985-10-05 Perforation 2498.50 2499.50 13
1995-10-02 Perforation 2498.50 2499.50 13
1995-10-02 Perforation 2500.00 2502.80 13
1995-10-02 Perforation 2500.50 2503.00 13
1995-10-02 Perforation 2503.80 2504.80 13
1995-10-02 Perforation 2506.50 2510.00 13
1995-10-03 Acid Treatment 2481.50 2510.00 0
1995-10-11 Cement Squeeze 2350.50 2363.00 0
1997-11-05 Acid Treatment 2481.50 2510.00 0
1999-07-28 Acid Treatment 2481.50 2510.00 0
2000-10-24 Acid Treatment 2481.50 2510.00 0
1985-10-05 Perforation 2500.00 2502.80 13
2002-12-04 Acid Treatment 2481.50 2510.00 0
2004-09-08 Acid Treatment 2481.50 2510.00 0
2006-09-25 Acid Treatment 2481.50 2510.00 0
2007-06-21 Acid Treatment 2481.50 2510.00 0
2014-04-11 Acid Treatment 2481.50 2510.00 0
1985-10-09 Perforation 2492.00 2494.00 13
1985-10-20 Perforation 2481.50 2483.50 13
1985-10-26 Acid Treatment 2481.50 2483.50 0
1987-10-28 Perforation 2486.50 2489.00 13
1987-10-28 Perforation 2492.00 2497.50 13
1987-10-28 Perforation 2500.50 2503.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 263 0.0 0.0 0.0
1987 240 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-04-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References