X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375041011002

Well Details

Well ID: 0375041011002
Loading map...
Location: 00/11-10-037-04W5/2
Location Alias: 00/11-10-37-04 W5M
Location Alias 2: 00/11-10-037-04 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 04
Section: 10
County/Municipality: Clearwater County
Well Name: GAO CZAR ET AL SYLAKE 11-10-37-4
Operator Name: Phillips Petroleum Resources, Ltd.
License Number: 0069936
License Date: 1978-06-05
License Status: RecCertified
Spud Date: 1978-08-03
Final Drill Date: 1978-08-27
Well Total Depth: 2476.00 m
Surface Hole Latitude: 52.169509
Surface Hole Longitude: -114.494779

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-06-05 Obtained License
1978-08-19 Drill Stem Test Performed
1978-08-21 Drill Stem Test Performed
1978-08-23 Drill Stem Test Performed
1978-08-27 Finished Drilling
1978-08-28 Drill Stem Test Performed
1978-08-31 Production Casing Operation Performed
1978-09-22 Perforation Treatment Performed - Jet Perforation
1978-11-23 Perforation Treatment Performed - Fractured
1978-12-04 Perforation Treatment Performed - Fractured
1979-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-03-22 Perforation Treatment Performed - Jet Perforation
1979-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-28 Perforation Treatment Performed - Jet Perforation
1979-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-04-05 Well Mode changed to Drilled and Cased
1981-08-29 Well Began Production
1981-08-29 Well Fluid changed to Crude Oil
1981-08-29 Well Mode changed to Pumping
1984-04-25 Well Fluid changed to Crude Oil
1984-04-25 Well Mode changed to Suspended
1984-04-26 Perforation Treatment Performed - Jet Perforation
1984-04-27 Well Log Performed
1984-05-01 Perforation Treatment Performed - Alcohol Squeeze
1991-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-08-03 Plug Back Performed
1991-08-03 Well Fluid changed to Crude Oil
1991-08-03 Well Mode changed to Abandoned
1991-08-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-09-22 Perforation 2352.00 2354.00 7
1979-03-29 Acid Treatment 2322.50 2330.50 0
1984-04-26 Perforation 2352.00 2354.00 7
1984-05-01 Alchohol Squeeze 2352.00 2354.00 0
1991-08-03 Packing Device Capped w/Cement 2340.00 2348.00 0
1991-08-03 Packing Device Capped w/Cement 2310.00 2318.00 0
1978-11-23 Fracture 2352.00 2354.00 0
1978-12-04 Fracture 2352.00 2354.00 0
1979-03-22 Packing Device Capped w/Cement 2342.40 2350.00 0
1979-03-22 Perforation 2335.00 2337.00 3
1979-03-23 Acid Treatment 2335.00 2337.00 0
1979-03-28 Perforation 2322.50 2323.50 3
1979-03-28 Perforation 2324.50 2325.50 3
1979-03-28 Perforation 2328.50 2330.50 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 51 0.0 0.0 0.0
1981 1236 0.0 0.0 0.0
1982 4685 0.0 0.0 0.0
1983 1311 0.0 0.0 0.0
1984 1973 0.0 0.0 0.0

For data sources see[5]

References