X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375033309000

Well Details

Well ID: 0375033309000
Loading map...
Location: 00/09-33-037-03W5/0
Location Alias: 00/09-33-37-03 W5M
Location Alias 2: 00/09-33-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 33
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 9-33-37-3
Operator Name: Cenovus Energy Inc.
License Number: 0151743
License Date: 1992-02-18
License Status: RecCertified
Spud Date: 1992-02-21
Final Drill Date: 1992-03-02
Well Total Depth: 2278.00 m
Surface Hole Latitude: 52.225584
Surface Hole Longitude: -114.362980

For data sources see[1][2]

Well History

Date Event
1992-02-18 Obtained License
1992-02-22 Surface Casing Operation Performed
1992-03-02 Finished Drilling
1992-03-02 Well Log Performed
1992-03-02 Well Mode changed to Drilled and Cased
1992-03-03 Drill Stem Test Performed
1992-03-04 Drill Stem Test Performed
1992-03-06 Production Casing Operation Performed
1992-03-06 Rig Released
1992-03-25 Perforation Treatment Performed - Jet Perforation
1992-03-25 Well Log Performed
1992-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-26 Perforation Treatment Performed - Cement Squeeze
1992-03-27 Well Log Performed
1992-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-31 Perforation Treatment Performed - Jet Perforation
1992-03-31 Well Log Performed
1992-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-04-07 Well Began Production
1992-04-07 Well Fluid changed to Crude Oil
1992-04-07 Well Mode changed to Flowing
1992-04-17 Well Fluid changed to Crude Oil
1992-04-17 Well Mode changed to Pumping
1992-06-11 Perforation Treatment Performed - Jet Perforation
1992-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-17 Perforation Treatment Performed - Cement Squeeze
1992-06-18 Perforation Treatment Performed - Jet Perforation
1992-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-23 Perforation Treatment Performed - Cement Squeeze
1992-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-25 Perforation Treatment Performed - Jet Perforation
1995-08-11 Perforation Treatment Performed - Cement Squeeze
1995-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-08-15 Perforation Treatment Performed - Jet Perforation
1995-08-15 Well Log Performed
1997-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-28 Plug Back Performed
1997-02-28 Well Fluid changed to Crude Oil
1997-02-28 Well Log Performed
1997-02-28 Well Mode changed to Abandoned Zone
2000-11-20 Well Log Performed
2005-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-09-22 Well Log Performed
2005-09-26 Well Log Performed
2005-09-29 Well Abandoned
2005-09-29 Well Fluid changed to Crude Oil
2005-09-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-03-25 Perforation 2218.00 2219.50 18
1992-06-18 Perforation 2209.00 2213.00 18
1992-06-19 Acid Treatment 2209.00 2213.00 0
1992-06-23 Cement Squeeze 2209.00 2213.00 0
1992-06-25 Perforation 2214.00 2215.00 18
1992-06-25 Acid Treatment 2214.00 2215.00 0
1995-08-11 Cement Squeeze 2214.00 2215.00 0
1995-08-15 Perforation 2208.50 2209.50 17
1995-08-15 Acid Treatment 2208.50 2209.50 0
1997-02-28 Packing Device Capped w/Cement 2203.00 2206.00 0
2005-09-22 Packing Device Capped w/Cement 2165.00 2173.00 0
1992-03-26 Acid Treatment 2218.00 2219.50 0
1992-03-26 Cement Squeeze 2218.00 2219.50 0
1992-03-31 Perforation 2216.00 2217.00 18
1992-03-31 Acid Treatment 2216.00 2217.00 0
1992-04-03 Acid Treatment 2216.00 2217.00 0
1992-06-11 Perforation 2211.00 2212.00 18
1992-06-12 Acid Treatment 2211.00 2212.00 0
1992-06-17 Cement Squeeze 2211.00 2217.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 5824 0.0 0.0 0.0
1993 6608 0.0 0.0 0.0
1994 8608 0.0 0.0 0.0
1995 5387 0.0 0.0 0.0
1996 804 0.0 0.0 0.0

For data sources see[5]

References