X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375033210020

Well Details

Well ID: 0375033210020
Loading map...
Location: 02/10-32-037-03W5/0
Location Alias: 02/10-32-37-03 W5M
Location Alias 2: 02/10-32-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 32
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 10-32-37-3
Operator Name: Cenovus Energy Inc.
License Number: 0159394
License Date: 1993-06-23
License Status: RecCertified
Spud Date: 1993-07-13
Final Drill Date: 1993-07-23
Well Total Depth: 2330.00 m
Surface Hole Latitude: 52.226453
Surface Hole Longitude: -114.393678

For data sources see[1][2]

Well History

Date Event
1993-06-23 Obtained License
1993-07-14 Surface Casing Operation Performed
1993-07-17 Direction Drilling Operation Performed - Deviate
1993-07-23 Finished Drilling
1993-07-23 Well Mode changed to Drilled and Cased
1993-07-24 Well Log Performed
1993-07-25 Well Log Performed
1993-07-26 Production Casing Operation Performed
1993-07-27 Rig Released
1993-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-09 Perforation Treatment Performed - Jet Perforation
1993-08-09 Perforation Treatment Performed - Remedial Casing
1993-08-11 Perforation Treatment Performed - Jet Perforation
1993-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-15 Well Began Production
1993-08-15 Well Fluid changed to Crude Oil
1993-08-15 Well Mode changed to Flowing
1993-08-16 Well Log Performed
1993-11-17 Perforation Treatment Performed - Cement Squeeze
1993-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-19 Perforation Treatment Performed - Jet Perforation
1993-11-19 Well Log Performed
1995-05-23 Well Log Performed
1995-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-05-24 Well Fluid changed to Crude Oil
1995-05-24 Well Mode changed to Abandoned Zone
1999-06-11 Perforation Treatment Performed - Jet Perforation
1999-06-11 Perforation Treatment Performed - Remedial Casing
1999-06-11 Well Log Performed
1999-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-12 Perforation Treatment Performed - Jet Perforation
1999-06-12 Perforation Treatment Performed - Remedial Casing
1999-06-25 Well Abandoned
1999-06-25 Well Fluid changed to Crude Oil
1999-06-25 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-07-17 1746.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-08-09 Perforation 2279.00 2280.00 18
1993-11-19 Acid Treatment 2273.00 2276.50 0
1995-05-24 Packing Device Capped w/Cement 2261.00 2269.00 0
1999-06-11 Perforation 940.00 941.00 13
1999-06-11 Remedial Casing Cementing 940.00 941.00 0
1999-06-12 Perforation 381.30 382.30 13
1999-06-12 Acid Treatment 381.30 382.30 0
1999-06-12 Remedial Casing Cementing 381.30 382.30 0
1993-08-09 Acid Treatment 2279.00 2280.00 0
1993-08-09 Remedial Casing Cementing 2279.00 2280.00 0
1993-08-11 Perforation 2273.00 2274.00 18
1993-08-11 Perforation 2276.00 2278.00 18
1993-08-12 Acid Treatment 2273.00 2278.00 0
1993-11-17 Cement Squeeze 2273.00 2278.00 0
1993-11-19 Perforation 2273.00 2274.00 18
1993-11-19 Perforation 2275.00 2276.50 18

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2050 0.0 0.0 0.0
1994 7820 0.0 0.0 0.0
1995 2175 0.0 0.0 0.0

For data sources see[6]

References