X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375033201000

Well Details

Well ID: 0375033201000
Loading map...
Location: 00/01-32-037-03W5/0
Location Alias: 00/01-32-37-03 W5M
Location Alias 2: 00/01-32-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 32
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 1-32-37-3
Operator Name: Cenovus Energy Inc.
License Number: 0164720
License Date: 1994-02-03
License Status: Suspension
Spud Date: 1994-02-03
Final Drill Date: 1994-02-14
Well Total Depth: 2298.00 m
Surface Hole Latitude: 52.218227
Surface Hole Longitude: -114.384639

For data sources see[1][2]

Well History

Date Event
1994-02-03 Obtained License
1994-02-04 Surface Casing Operation Performed
1994-02-14 Finished Drilling
1994-02-14 Well Log Performed
1994-02-14 Well Mode changed to Drilled and Cased
1994-02-16 Production Casing Operation Performed
1994-02-16 Rig Released
1994-02-23 Well Log Performed
1994-02-24 Perforation Treatment Performed - Jet Perforation
1994-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-01 Perforation Treatment Performed - Cement Squeeze
1994-03-02 Well Log Performed
1994-03-03 Perforation Treatment Performed - Jet Perforation
1994-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-09 Well Began Production
1994-03-09 Well Fluid changed to Crude Oil
1994-03-09 Well Mode changed to Pumping
1994-12-14 Well Log Performed
1994-12-15 Perforation Treatment Performed - Jet Perforation
1996-02-21 Perforation Treatment Performed - Chemical Squeeze
1996-08-20 Perforation Treatment Performed - Jet Perforation
1996-08-20 Well Log Performed
1996-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-13 Plug Back Performed
2000-07-13 Well Fluid changed to Crude Oil
2000-07-13 Well Log Performed
2000-07-13 Well Mode changed to Abandoned Zone
2000-07-14 Perforation Treatment Performed - Jet Perforation
2000-07-14 Well Log Performed
2000-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-02-24 Perforation 2249.00 2250.00 18
2000-07-13 Packing Device Capped w/Cement 2228.00 2236.00 0
2000-07-14 Perforation 2212.00 2217.00 20
2000-07-17 Acid Treatment 2212.00 2217.00 0
1994-02-25 Acid Treatment 2249.00 2250.00 0
1994-03-01 Cement Squeeze 2249.00 2250.00 0
1994-03-03 Perforation 2240.50 2246.50 18
1994-03-04 Acid Treatment 2240.50 2246.50 0
1994-12-15 Perforation 2248.50 2249.50 18
1996-02-21 Chemical Squeeze 2240.00 2249.50 0
1996-08-20 Perforation 2240.50 2246.50 18
1996-08-21 Acid Treatment 2240.50 2246.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 6620 0.0 0.0 0.0
1995 8443 0.0 0.0 0.0
1996 5636 0.0 0.0 0.0

For data sources see[5]

References