X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375032104003

Well Details

Well ID: 0375032104003
Loading map...
Location: 00/04-21-037-03W5/3
Location Alias: 00/04-21-37-03 W5M
Location Alias 2: 00/04-21-037-03 W5/03
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 21
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 4-21-37-3
Operator Name: Cenovus Energy Inc.
License Number: 0093048
License Date: 1981-10-30
License Status: Issued
Spud Date: 1981-11-05
Final Drill Date: 1981-11-27
Well Total Depth: 2916.00 m
Surface Hole Latitude: 52.191496
Surface Hole Longitude: -114.376668

For data sources see[1][2]

Well History

Date Event
1981-10-30 Obtained License
1981-11-27 Finished Drilling
1981-11-27 Well Log Performed
1981-11-27 Well Mode changed to Drilled and Cased
1981-11-29 Drill Stem Test Performed
1981-11-30 Drill Stem Test Performed
1981-12-03 Production Casing Operation Performed
1982-01-21 Perforation Treatment Performed - Open-Hole Completion
1982-01-21 Well Log Performed
1982-01-22 Well Log Performed
1982-01-26 Well Log Performed
1982-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-01-28 Perforation Treatment Performed - Jet Perforation
1982-05-28 Perforation Treatment Performed - Jet Perforation
1982-06-01 Perforation Treatment Performed - Cement Squeeze
1982-06-09 Perforation Treatment Performed - Jet Perforation
1982-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-14 Perforation Treatment Performed - Cement Squeeze
1983-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-15 Perforation Treatment Performed - Jet Perforation
1984-05-17 Perforation Treatment Performed - Cement Squeeze
1984-05-18 Perforation Treatment Performed - Jet Perforation
1984-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-08 Perforation Treatment Performed - Cement Squeeze
1984-06-11 Well Log Performed
1984-06-12 Perforation Treatment Performed - Jet Perforation
1984-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-31 Perforation Treatment Performed - Cement Squeeze
1984-11-02 Well Log Performed
1984-11-03 Perforation Treatment Performed - Jet Perforation
1987-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-27 Perforation Treatment Performed - Cement Squeeze
1987-10-27 Plug Back Performed
1987-10-31 Perforation Treatment Performed - Jet Perforation
1987-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-05 Perforation Treatment Performed - Cement Squeeze
1987-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-07 Perforation Treatment Performed - Jet Perforation
1987-11-10 Well Log Performed
1987-11-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-11-11 Plug Back Performed
1987-11-12 Perforation Treatment Performed - Jet Perforation
1987-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-14 Perforation Treatment Performed - Jet Perforation
1987-11-17 Perforation Treatment Performed - Cement Squeeze
1987-11-18 Well Log Performed
1987-11-19 Perforation Treatment Performed - Jet Perforation
1987-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-21 Perforation Treatment Performed - Cement Squeeze
1987-11-21 Plug Back Performed
1989-10-05 Well Log Performed
1990-03-20 Well Log Performed
1990-04-09 Well Log Performed
1990-04-10 Perforation Treatment Performed - Jet Perforation
1990-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-01 Well Began Injection
1990-06-01 Well Fluid changed to Water
1990-06-01 Well Type changed to Disposal
1991-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-09 Perforation Treatment Performed - Jet Perforation
1994-02-09 Well Log Performed
1994-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-15 Perforation Treatment Performed - Jet Perforation
1995-05-26 Well Log Performed
1995-05-27 Perforation Treatment Performed - Jet Perforation
1995-06-21 Well Fluid changed to Water
1995-06-21 Well Type changed to Disposal
1995-10-10 Well Log Performed
1995-10-11 Perforation Treatment Performed - Jet Perforation
1995-10-11 Well Fluid changed to Water
1995-10-11 Well Type changed to Disposal
1995-10-12 Well Fluid changed to Water
1995-10-12 Well Mode changed to Suspended
1995-10-12 Well Type changed to Disposal
2009-12-02 Perforation Treatment Performed - Cement Squeeze
2009-12-02 Plug Back Performed
2009-12-17 Perforation Treatment Performed - Cement Plug
2009-12-17 Plug Back Performed
2009-12-17 Well Fluid changed to Water
2009-12-17 Well Mode changed to Abandoned Zone
2009-12-17 Well Type changed to Disposal
2009-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-18 Plug Back Performed
2009-12-19 Perforation Treatment Performed - Jet Perforation
2009-12-20 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-01-21 Open Hole/Barefoot Completion 2885.00 2916.00 0
1983-10-15 Perforation 2866.00 2867.50 13
1983-10-15 Acid Treatment 2866.00 2867.50 0
1984-05-17 Cement Squeeze 2866.00 2867.50 0
1984-05-18 Perforation 2235.00 2237.00 13
1984-05-18 Perforation 2238.00 2240.00 13
1984-05-18 Perforation 2241.00 2242.00 13
1984-05-19 Acid Treatment 2235.00 2242.00 0
1984-06-08 Cement Squeeze 2235.00 2242.00 0
1984-06-12 Perforation 2238.00 2240.00 13
1984-06-12 Perforation 2241.00 2242.00 13
1982-01-28 Packing Device Capped w/Cement 2879.50 2883.00 0
1984-06-15 Acid Treatment 2238.00 2242.00 0
1984-10-31 Cement Squeeze 2238.00 2242.00 0
1984-11-03 Perforation 2238.00 2240.00 13
1987-10-27 Acid Treatment 2238.00 2240.00 0
1987-10-27 Cement Squeeze 2238.00 2240.00 0
1987-10-31 Perforation 2862.50 2863.50 13
1987-11-01 Acid Treatment 2862.50 2863.50 0
1987-11-05 Cement Squeeze 2862.50 2863.50 0
1987-11-07 Perforation 2859.50 2861.50 13
1987-11-07 Acid Treatment 2859.50 2861.50 0
1982-01-28 Perforation 2872.50 2875.00 13
1987-11-11 Packing Device Capped w/Cement 2855.00 2855.00 0
1987-11-12 Perforation 2266.00 2268.00 13
1987-11-13 Acid Treatment 2266.00 2268.00 0
1987-11-14 Perforation 2281.00 2282.00 13
1987-11-17 Cement Squeeze 2266.00 2282.00 0
1987-11-19 Perforation 2266.00 2268.00 13
1987-11-20 Acid Treatment 2266.00 2268.00 0
1987-11-21 Cement Squeeze 2266.00 2268.00 0
1990-04-10 Perforation 2266.00 2268.00 13
1990-04-10 Perforation 2281.00 2285.00 13
1982-01-28 Acid Treatment 2872.50 2875.00 0
1990-04-10 Perforation 2291.00 2297.00 13
1990-04-12 Acid Treatment 2266.00 2297.00 0
1991-01-17 Acid Treatment 2266.00 2297.00 0
1991-02-24 Acid Treatment 2266.00 2297.00 0
1991-07-24 Acid Treatment 2266.00 2297.00 0
1991-10-29 Acid Treatment 2266.00 2297.00 0
1991-12-21 Acid Treatment 2266.00 2297.00 0
1992-01-23 Acid Treatment 2266.00 2297.00 0
1992-02-06 Acid Treatment 2266.00 2297.00 0
1992-04-10 Acid Treatment 2266.00 2297.00 0
1982-05-28 Perforation 2877.40 2878.10 13
1992-04-11 Acid Treatment 2266.00 2297.00 0
1992-05-19 Acid Treatment 2266.00 2297.00 0
1992-10-14 Acid Treatment 2266.00 2297.00 0
1993-02-03 Acid Treatment 2266.00 2297.00 0
1993-03-19 Acid Treatment 2266.00 2297.00 0
1993-03-30 Acid Treatment 2266.00 2297.00 0
1993-05-19 Acid Treatment 2266.00 2297.00 0
1993-06-10 Acid Treatment 2266.00 2297.00 0
1993-07-19 Acid Treatment 2266.00 2297.00 0
1993-08-16 Acid Treatment 2266.00 2297.00 0
1982-06-01 Cement Squeeze 2872.50 2878.10 0
1993-09-09 Acid Treatment 2266.00 2297.00 0
1993-09-27 Acid Treatment 2266.00 2297.00 0
1993-10-14 Acid Treatment 2266.00 2297.00 0
1994-02-09 Perforation 2268.00 2280.00 13
1994-02-09 Perforation 2285.00 2291.00 13
1994-02-09 Acid Treatment 2266.00 2297.00 0
1994-03-04 Acid Treatment 2266.00 2297.00 0
1994-04-15 Perforation 2268.00 2280.00 13
1994-04-15 Perforation 2285.00 2291.00 13
1995-05-27 Perforation 2228.00 2239.00 13
1982-06-09 Perforation 2872.50 2874.00 13
1995-10-11 Perforation 505.00 516.00 18
2009-12-02 Cement Squeeze 505.00 516.00 0
2009-12-17 Cement Plug 1877.00 2317.00 0
2009-12-18 Packing Device Capped w/Cement 1862.00 1870.00 0
2009-12-19 Perforation 1717.00 1720.50 17
2009-12-19 Perforation 1720.50 1724.00 17
2009-12-20 Fracture 1717.00 1724.00 0
1982-06-10 Acid Treatment 2872.50 2874.00 0
1983-10-14 Cement Squeeze 2872.50 2874.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0

For data sources see[5]

References