If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375031912032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.198326,"lon":-114.426753,"icon":""}]} |
Location: 03/12-19-037-03W5/2 | |
Location Alias: 03/12-19-37-03 W5M | |
Location Alias 2: 03/12-19-037-03 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 03 | |
Section: 19 | |
County/Municipality: Red Deer County | |
Well Name: CVE SYLAKE 12-19-37-3 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0142948 | |
License Date: 1990-01-24 | |
License Status: Abandoned | |
Spud Date: 1990-02-07 | |
Final Drill Date: 1990-02-23 | |
Well Total Depth: 2425.00 m | |
Surface Hole Latitude: 52.198326 | |
Surface Hole Longitude: -114.426753 |
Date | Event |
---|---|
1990-01-24 | Obtained License |
1990-02-08 | Surface Casing Operation Performed |
1990-02-14 | Direction Drilling Operation Performed - Deviate |
1990-02-23 | Finished Drilling |
1990-02-23 | Well Mode changed to Drilled and Cased |
1990-02-24 | Well Log Performed |
1990-02-25 | Drill Stem Test Performed |
1990-02-26 | Drill Stem Test Performed |
1990-02-27 | Drill Stem Test Performed |
1990-02-28 | Drill Stem Test Performed |
1990-03-02 | Drill Stem Test Performed |
1990-03-02 | Well Log Performed |
1990-03-05 | Production Casing Operation Performed |
1990-03-05 | Rig Released |
1990-04-24 | Perforation Treatment Performed - Jet Perforation |
1990-04-25 | Perforation Treatment Performed - Jet Perforation |
1990-04-26 | Perforation Treatment Performed - Fractured |
1990-04-26 | Perforation Treatment Performed - Jet Perforation |
1990-04-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-05-15 | Perforation Treatment Performed - Cement Squeeze |
1991-03-07 | Perforation Treatment Performed - Fractured |
1991-03-07 | Perforation Treatment Performed - Jet Perforation |
1991-03-09 | Perforation Treatment Performed - Fractured |
1991-03-22 | Well Log Performed |
1991-04-16 | Well Began Production |
1991-04-16 | Well Fluid changed to Gas |
1991-04-16 | Well Mode changed to Flowing |
1995-10-26 | Perforation Treatment Performed - Cement Squeeze |
1995-10-26 | Plug Back Performed |
1995-10-26 | Well Fluid changed to Gas |
1995-10-26 | Well Mode changed to Abandoned Zone |
1995-10-27 | Perforation Treatment Performed - Jet Perforation |
1995-10-27 | Well Log Performed |
1995-10-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-08-08 | Well Log Performed |
1996-08-09 | Perforation Treatment Performed - Jet Perforation |
1996-08-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-05-23 | Perforation Treatment Performed - Chemical Squeeze |
2003-03-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-03-02 | Perforation Treatment Performed - Cement Squeeze |
2003-03-02 | Plug Back Performed |
2003-03-03 | Perforation Treatment Performed - Jet Perforation |
2003-03-03 | Well Log Performed |
2003-03-06 | Perforation Treatment Performed - Fractured |
2005-01-01 | Well Fluid changed to Gas |
2005-01-01 | Well Mode changed to Flowing |
2005-09-13 | Well Fluid changed to Gas |
2005-09-13 | Well Mode changed to Suspended |
2015-08-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-08-14 | Perforation Treatment Performed - Jet Perforation |
2015-08-14 | Plug Back Performed |
2015-08-14 | Well Fluid changed to Gas |
2015-08-14 | Well Mode changed to Abandoned Zone |
2015-08-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-08-15 | Perforation Treatment Performed - Remedial Casing |
2015-08-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-08-16 | Perforation Treatment Performed - Jet Perforation |
2015-08-16 | Perforation Treatment Performed - Remedial Casing |
2015-08-17 | Perforation Treatment Performed - Jet Perforation |
2015-08-19 | Perforation Treatment Performed - Remedial Casing |
2015-08-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-08-20 | Perforation Treatment Performed - Jet Perforation |
2015-08-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-08-24 | Perforation Treatment Performed - Remedial Casing |
2016-02-26 | Well Abandoned |
2016-02-26 | Well Fluid changed to Gas |
2016-02-26 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1990-02-14 | 851.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-04-24 | Perforation | 2317.00 | 2320.00 | 13 |
1991-03-09 | Fracture | 2250.50 | 2254.00 | 0 |
1995-10-26 | Cement Squeeze | 2250.50 | 2254.00 | 0 |
1995-10-27 | Perforation | 2300.00 | 2302.00 | 17 |
1995-10-27 | Perforation | 2305.00 | 2306.00 | 17 |
1995-10-29 | Acid Treatment | 2300.00 | 2306.00 | 0 |
1996-08-09 | Perforation | 2307.00 | 2309.50 | 17 |
1996-08-10 | Acid Treatment | 2307.00 | 2309.50 | 0 |
1996-08-10 | Acid Treatment | 2305.00 | 2306.00 | 0 |
1996-08-10 | Acid Treatment | 2300.00 | 2302.00 | 0 |
1998-05-23 | Chemical Squeeze | 2300.00 | 2309.00 | 0 |
1990-04-25 | Perforation | 2308.00 | 2310.50 | 13 |
2003-03-02 | Cement Squeeze | 2300.00 | 2313.50 | 0 |
2003-03-02 | Packing Device Capped w/Cement | 2280.50 | 2290.00 | 0 |
2003-03-03 | Perforation | 2250.00 | 2254.00 | 20 |
2003-03-06 | Fracture | 2250.00 | 2254.00 | 0 |
2015-08-14 | Packing Device Capped w/Cement | 2234.00 | 2242.00 | 0 |
2015-08-14 | Perforation | 1093.00 | 1094.00 | 13 |
2015-08-15 | Remedial Casing Cementing | 1093.00 | 1094.00 | 0 |
2015-08-15 | Packing Device Capped w/Cement | 1080.00 | 1088.00 | 0 |
2015-08-16 | Perforation | 1021.00 | 1022.00 | 13 |
2015-08-16 | Remedial Casing Cementing | 1021.00 | 1022.00 | 0 |
1990-04-25 | Perforation | 2311.50 | 2313.50 | 13 |
2015-08-16 | Packing Device Capped w/Cement | 1008.00 | 1016.00 | 0 |
2015-08-17 | Perforation | 576.00 | 577.00 | 13 |
2015-08-19 | Remedial Casing Cementing | 576.00 | 577.00 | 0 |
2015-08-20 | Packing Device Capped w/Cement | 563.00 | 577.00 | 0 |
2015-08-20 | Perforation | 352.00 | 353.00 | 13 |
2015-08-24 | Remedial Casing Cementing | 352.00 | 353.00 | 0 |
2015-08-24 | Packing Device Capped w/Cement | 339.00 | 347.00 | 0 |
1990-04-26 | Perforation | 2298.00 | 2299.00 | 13 |
1990-04-26 | Fracture | 2298.00 | 2299.00 | 0 |
1990-04-27 | Acid Treatment | 2308.00 | 2320.00 | 0 |
1990-05-15 | Cement Squeeze | 2298.00 | 2299.00 | 0 |
1991-03-07 | Perforation | 2250.50 | 2254.00 | 18 |
1991-03-07 | Fracture | 2250.50 | 2254.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 5969 | 0.0 | 0.0 | 0.0 |
1992 | 3900 | 0.0 | 0.0 | 0.0 |
1993 | 3245 | 0.0 | 0.0 | 0.0 |
1994 | 7954 | 0.0 | 0.0 | 0.0 |
1995 | 4295 | 0.0 | 0.0 | 0.0 |
2005 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-08-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]