X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375031910000

Well Details

Well ID: 0375031910000
Loading map...
Location: 00/10-19-037-03W5/0
Location Alias: 00/10-19-37-03 W5M
Location Alias 2: 00/10-19-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 19
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 10-19-37-3
Operator Name: Cenovus Energy Inc.
License Number: 0022407
License Date: 1962-05-14
License Status: Issued
Spud Date: 1962-05-29
Final Drill Date: 1962-07-22
Well Total Depth: 2896.80 m
Surface Hole Latitude: 52.196807
Surface Hole Longitude: -114.414755

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-05-14 Obtained License
1962-06-16 Drill Stem Test Performed
1962-06-18 Drill Stem Test Performed
1962-06-19 Drill Stem Test Performed
1962-06-22 Drill Stem Test Performed
1962-07-16 Drill Stem Test Performed
1962-07-19 Drill Stem Test Performed
1962-07-20 Drill Stem Test Performed
1962-07-21 Drill Stem Test Performed
1962-07-22 Drill Stem Test Performed
1962-07-22 Finished Drilling
1962-07-24 Production Casing Operation Performed
1962-08-14 Perforation Treatment Performed - Jet Perforation
1962-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-09-11 Perforation Treatment Performed - Cement Squeeze
1962-09-12 Perforation Treatment Performed - Bullet Perforation
1962-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-11-01 Well Mode changed to Drilled and Cased
1966-03-21 Well Began Production
1966-03-21 Well Fluid changed to Gas
1966-03-21 Well Mode changed to Flowing
1968-05-30 Well Fluid changed to Gas
1968-05-30 Well Mode changed to Suspended
1980-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-15 Well Fluid changed to Gas
1980-10-15 Well Mode changed to Abandoned Zone
1980-12-23 Perforation Treatment Performed - Chemical Squeeze
1982-07-07 Perforation Treatment Performed - Jet Perforation
1982-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-05 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-08-14 Perforation 2283.60 2287.20 7
1982-07-07 Perforation 2283.00 2284.80 7
1982-07-08 Acid Treatment 2283.00 2284.80 0
1990-09-05 Perforation 2280.00 2286.00 18
1962-08-14 Perforation 2871.80 2876.10 7
1962-08-18 Acid Treatment 2871.80 2876.10 0
1962-08-19 Acid Treatment 2283.60 2287.20 0
1962-09-11 Cement Squeeze 2283.60 2287.20 0
1962-09-12 Bullet Perforation 2283.00 2284.80 7
1962-09-13 Acid Treatment 2283.00 2284.80 0
1980-10-15 Packing Device Capped w/Cement 2436.00 2436.00 0
1980-12-23 Chemical Squeeze 2283.60 2287.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0

For data sources see[5]

References