If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375031606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.178919,"lon":-114.371491,"icon":""}]} |
Location: 00/06-16-037-03W5/0 | |
Location Alias: 00/06-16-37-03 W5M | |
Location Alias 2: 00/06-16-037-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 03 | |
Section: 16 | |
County/Municipality: Red Deer County | |
Well Name: CVE SYLAKE 6-16-37-3 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0101494 | |
License Date: 1983-06-01 | |
License Status: Abandoned | |
Spud Date: 1983-06-11 | |
Final Drill Date: 1983-07-02 | |
Well Total Depth: 2335.00 m | |
Surface Hole Latitude: 52.178919 | |
Surface Hole Longitude: -114.371491 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1983-06-01 | Obtained License |
1983-06-22 | Drill Stem Test Performed |
1983-07-02 | Finished Drilling |
1983-07-02 | Well Mode changed to Drilled and Cased |
1983-07-03 | Well Log Performed |
1983-07-04 | Drill Stem Test Performed |
1983-07-06 | Production Casing Operation Performed |
1983-08-28 | Perforation Treatment Performed - Jet Perforation |
1983-09-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-09-10 | Perforation Treatment Performed - Jet Perforation |
1983-09-12 | Perforation Treatment Performed - Fractured |
1983-09-17 | Perforation Treatment Performed - Jet Perforation |
1983-09-18 | Perforation Treatment Performed - Fractured |
1984-01-06 | Well Began Production |
1984-01-06 | Well Fluid changed to Crude Oil |
1984-01-06 | Well Mode changed to Pumping |
1984-04-30 | Well Log Performed |
1984-05-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-05-01 | Plug Back Performed |
1984-05-02 | Perforation Treatment Performed - Jet Perforation |
1984-05-02 | Well Fluid changed to Crude Oil |
1984-05-02 | Well Mode changed to Abandoned Zone |
1984-05-09 | Perforation Treatment Performed - Fractured |
1984-09-21 | Well Log Performed |
1984-09-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-09-22 | Plug Back Performed |
1984-09-22 | Well Log Performed |
1984-09-23 | Perforation Treatment Performed - Jet Perforation |
1984-09-23 | Well Log Performed |
1984-09-25 | Perforation Treatment Performed - Cement Squeeze |
1984-09-27 | Well Log Performed |
1984-09-28 | Perforation Treatment Performed - Jet Perforation |
1984-10-03 | Perforation Treatment Performed - Fractured |
2006-03-18 | Perforation Treatment Performed - Cement Squeeze |
2006-03-18 | Plug Back Performed |
2006-03-22 | Perforation Treatment Performed - Cement Squeeze |
2006-03-22 | Perforation Treatment Performed - Jet Perforation |
2006-04-01 | Perforation Treatment Performed - Jet Perforation |
2006-04-01 | Well Log Performed |
2006-04-02 | Perforation Treatment Performed - Jet Perforation |
2006-04-02 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2006-04-02 | Plug Back Performed |
2006-04-02 | Well Log Performed |
2006-04-04 | Perforation Treatment Performed - Fractured |
2009-11-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-11-22 | Plug Back Performed |
2009-11-22 | Well Log Performed |
2017-09-14 | Well Log Performed |
2017-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-09-28 | Perforation Treatment Performed - Jet Perforation |
2017-09-28 | Plug Back Performed |
2017-09-28 | Well Log Performed |
2017-10-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-10-02 | Perforation Treatment Performed - Cement Plug |
2017-10-02 | Perforation Treatment Performed - Remedial Casing |
2017-10-02 | Plug Back Performed |
2017-10-03 | Well Log Performed |
2017-10-05 | Perforation Treatment Performed - Jet Perforation |
2017-10-05 | Well Log Performed |
2017-10-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-10-26 | Perforation Treatment Performed - Cement Plug |
2017-10-26 | Perforation Treatment Performed - Remedial Casing |
2017-10-27 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-08-28 | Perforation | 2313.00 | 2314.50 | 7 |
1984-05-01 | Packing Device Capped w/Cement | 2291.00 | 2299.00 | 0 |
1984-05-02 | Perforation | 2194.50 | 2196.50 | 13 |
1984-05-09 | Fracture | 2194.50 | 2196.50 | 0 |
1984-09-22 | Packing Device Capped w/Cement | 2193.00 | 2193.00 | 0 |
1984-09-23 | Perforation | 2001.50 | 2001.50 | 0 |
1984-09-23 | Perforation | 1983.00 | 1983.00 | 0 |
1984-09-25 | Cement Squeeze | 1983.00 | 2001.50 | 0 |
1984-09-28 | Perforation | 2006.00 | 2010.00 | 13 |
1984-10-03 | Fracture | 2006.00 | 2010.00 | 0 |
2006-03-18 | Cement Squeeze | 2006.00 | 2010.00 | 0 |
1983-08-28 | Perforation | 2316.00 | 2317.00 | 7 |
2006-03-22 | Perforation | 2194.50 | 2196.50 | 13 |
2006-03-22 | Cement Squeeze | 2194.50 | 2196.50 | 0 |
2006-04-01 | Perforation | 2275.00 | 2282.00 | 16 |
2006-04-02 | Packing Dev Cpd w/Res-Gyp Cem | 2269.00 | 2272.00 | 0 |
2006-04-02 | Perforation | 2253.00 | 2256.00 | 16 |
2006-04-04 | Fracture | 2253.00 | 2256.00 | 0 |
2009-11-22 | Packing Device Capped w/Cement | 2232.00 | 2240.00 | 0 |
2017-09-28 | Packing Device Capped w/Cement | 1971.80 | 1979.80 | 0 |
2017-09-28 | Perforation | 703.50 | 705.50 | 17 |
2017-10-02 | Remedial Casing Cementing | 703.50 | 705.50 | 0 |
1983-09-09 | Acid Treatment | 2313.00 | 2317.00 | 0 |
2017-10-02 | Cement Plug | 695.00 | 705.50 | 0 |
2017-10-02 | Packing Device Capped w/Cement | 685.70 | 694.00 | 0 |
2017-10-05 | Perforation | 357.50 | 358.50 | 20 |
2017-10-26 | Remedial Casing Cementing | 357.50 | 358.50 | 0 |
2017-10-26 | Cement Plug | 348.30 | 358.50 | 0 |
2017-10-26 | Packing Device Capped w/Cement | 337.80 | 347.80 | 0 |
1983-09-10 | Perforation | 2309.50 | 2311.00 | 7 |
1983-09-10 | Perforation | 2307.50 | 2308.50 | 7 |
1983-09-10 | Perforation | 2305.50 | 2306.50 | 7 |
1983-09-12 | Fracture | 2305.50 | 2317.00 | 0 |
1983-09-17 | Perforation | 2313.00 | 2316.00 | 7 |
1983-09-18 | Fracture | 2305.50 | 2317.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 559 | 0.0 | 0.0 | 0.0 |
1984 | 884 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2009-11-23 | No Incident Encountered | 0.00 | 0.00 |
2017-10-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]