X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375030915000

Well Details

Well ID: 0375030915000
Loading map...
Location: 00/15-09-037-03W5/0
Location Alias: 00/15-09-37-03 W5M
Location Alias 2: 00/15-09-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 09
County/Municipality: Red Deer County
Well Name: CVE SYLAKE 15-9-37-3
Operator Name: Cenovus Energy Inc.
License Number: 0436129
License Date: 2011-08-18
License Status: Issued
Spud Date: 2011-09-11
Final Drill Date: 2011-09-20
Well Total Depth: 3153.00 m
Surface Hole Latitude: 52.159684
Surface Hole Longitude: -114.364895

For data sources see[1][2]

Well History

Date Event
2011-08-18 Obtained License
2011-09-13 Surface Casing Operation Performed
2011-09-15 Direction Drilling Operation Performed - Horizontal
2011-09-20 Finished Drilling
2011-09-20 Well Log Performed
2011-09-20 Well Mode changed to Drilled and Cased
2011-09-21 Liner Casing Operation Performed
2011-09-21 Perforation Treatment Performed - Open-Hole Completion
2011-09-21 Production Casing Operation Performed
2011-09-22 Rig Released
2011-11-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-17 Well Fluid changed to Crude Oil
2011-11-17 Well Mode changed to Drilling and Completing
2012-03-02 Well Began Production
2012-03-02 Well Fluid changed to Crude Oil
2012-03-02 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-15 1386.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-21 Open Hole/Barefoot Completion 3124.00 3153.00 0
2011-11-13 Multi-Stage Fracture 2415.30 2416.10 0
2011-11-13 Multi-Stage Fracture 2338.60 2339.40 0
2011-11-13 Multi-Stage Fracture 2232.80 2233.60 0
2011-11-13 Multi-Stage Fracture 2141.80 2142.60 0
2011-11-13 Multi-Stage Fracture 2021.90 2022.70 0
2011-11-13 Multi-Stage Fracture 3114.70 3115.50 0
2011-11-13 Multi-Stage Fracture 3078.20 3079.00 0
2011-11-13 Multi-Stage Fracture 2973.50 2974.30 0
2011-11-13 Multi-Stage Fracture 2881.90 2882.70 0
2011-11-13 Multi-Stage Fracture 2790.30 2791.10 0
2011-11-13 Multi-Stage Fracture 2700.50 2701.30 0
2011-11-13 Multi-Stage Fracture 2611.40 2612.20 0
2011-11-13 Multi-Stage Fracture 2520.00 2520.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 0 0.0 0.0 0.0
2012 6182 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8306 0.0 0.0 0.0
2016 8745 0.0 0.0 0.0
2017 8326 0.0 0.0 0.0
2018 7644 0.0 0.0 0.0
2019 8503 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References