If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375030904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.174508,"lon":-114.376471,"icon":""}]} |
Location: 00/04-09-037-03W5/0 | |
Location Alias: 00/04-09-37-03 W5M | |
Location Alias 2: 00/04-09-037-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 03 | |
Section: 09 | |
County/Municipality: Red Deer County | |
Well Name: CVE SYLAKE 4-9-37-3 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0433530 | |
License Date: 2011-05-13 | |
License Status: Issued | |
Spud Date: 2011-08-14 | |
Final Drill Date: 2011-08-23 | |
Well Total Depth: 3275.00 m | |
Surface Hole Latitude: 52.174508 | |
Surface Hole Longitude: -114.376471 |
Date | Event |
---|---|
2011-05-13 | Obtained License |
2011-08-16 | Surface Casing Operation Performed |
2011-08-18 | Direction Drilling Operation Performed - Horizontal |
2011-08-23 | Finished Drilling |
2011-08-23 | Well Log Performed |
2011-08-23 | Well Mode changed to Drilled and Cased |
2011-08-25 | Liner Casing Operation Performed |
2011-08-25 | Perforation Treatment Performed - Open-Hole Completion |
2011-08-25 | Production Casing Operation Performed |
2011-08-25 | Rig Released |
2011-09-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-16 | Well Began Production |
2011-11-16 | Well Fluid changed to Crude Oil |
2011-11-16 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-18 | 1388.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-08-25 | Open Hole/Barefoot Completion | 3229.00 | 3275.00 | 0 |
2011-09-14 | Multi-Stage Fracture | 2421.90 | 2422.40 | 0 |
2011-09-14 | Multi-Stage Fracture | 2360.80 | 2361.30 | 0 |
2011-09-14 | Multi-Stage Fracture | 2299.70 | 2300.20 | 0 |
2011-09-14 | Multi-Stage Fracture | 2198.10 | 2198.60 | 0 |
2011-09-13 | Multi-Stage Fracture | 3205.30 | 3205.80 | 0 |
2011-09-13 | Multi-Stage Fracture | 3140.00 | 3140.50 | 0 |
2011-09-13 | Multi-Stage Fracture | 3048.30 | 3048.80 | 0 |
2011-09-13 | Multi-Stage Fracture | 2956.70 | 2957.20 | 0 |
2011-09-13 | Multi-Stage Fracture | 2865.10 | 2865.60 | 0 |
2011-09-13 | Multi-Stage Fracture | 2788.30 | 2788.80 | 0 |
2011-09-13 | Multi-Stage Fracture | 2625.80 | 2626.30 | 0 |
2011-09-13 | Multi-Stage Fracture | 2507.60 | 2608.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1046 | 0.0 | 0.0 | 0.0 |
2012 | 8540 | 0.0 | 0.0 | 0.0 |
2013 | 8038 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8281 | 0.0 | 0.0 | 0.0 |
2016 | 8712 | 0.0 | 0.0 | 0.0 |
2017 | 8245 | 0.0 | 0.0 | 0.0 |
2018 | 8729 | 0.0 | 0.0 | 0.0 |
2019 | 7340 | 0.0 | 0.0 | 0.0 |
2020 | 2141 | 0.0 | 0.0 | 0.0 |
For data sources see[6]