If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0375030601020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.147143,"lon":-114.410302,"icon":""}]} |
Location: 02/01-06-037-03W5/0 | |
Location Alias: 02/01-06-37-03 W5M | |
Location Alias 2: 02/01-06-037-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 5 | |
Range: 03 | |
Section: 06 | |
County/Municipality: Red Deer County | |
Well Name: GPI 102 SYLAKE 1-6-37-3 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0349350 | |
License Date: 2006-01-18 | |
License Status: Suspension | |
Spud Date: 2006-03-29 | |
Final Drill Date: 2006-04-13 | |
Well Total Depth: 2475.00 m | |
Surface Hole Latitude: 52.147143 | |
Surface Hole Longitude: -114.410302 |
Date | Event |
---|---|
2006-01-18 | Obtained License |
2006-03-31 | Surface Casing Operation Performed |
2006-04-04 | Direction Drilling Operation Performed - Deviate |
2006-04-12 | Well Log Performed |
2006-04-13 | Finished Drilling |
2006-04-13 | Well Mode changed to Drilled and Cased |
2006-04-14 | Production Casing Operation Performed |
2006-04-15 | Rig Released |
2006-05-10 | Well Log Performed |
2006-05-12 | Well Log Performed |
2006-05-13 | Perforation Treatment Performed - Jet Perforation |
2006-05-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-05-14 | Well Began Production |
2006-05-14 | Well Fluid changed to Crude Oil |
2006-05-14 | Well Mode changed to Pumping |
2010-09-05 | Perforation Treatment Performed - Jet Perforation |
2010-09-05 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2010-09-05 | Plug Back Performed |
2010-09-05 | Well Fluid changed to Crude Oil |
2010-09-05 | Well Mode changed to Abandoned Zone |
2010-09-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2006-04-04 | 1601.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-05-13 | Perforation | 2362.00 | 2366.50 | 20 |
2006-05-14 | Acid Treatment | 2362.00 | 2366.50 | 0 |
2010-09-05 | Packing Dev Cpd w/Res-Gyp Cem | 2356.00 | 2359.00 | 0 |
2010-09-05 | Perforation | 2350.00 | 2354.00 | 17 |
2010-09-07 | Acid Treatment | 2350.00 | 2354.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 2065 | 0.0 | 0.0 | 0.0 |
2007 | 4710 | 0.0 | 0.0 | 0.0 |
2008 | 7424 | 0.0 | 0.0 | 0.0 |
2009 | 4009 | 0.0 | 0.0 | 0.0 |
For data sources see[6]