X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375030316000

Well Details

Well ID: 0375030316000
Loading map...
Location: 00/16-03-037-03W5/0
Location Alias: 00/16-03-37-03 W5M
Location Alias 2: 00/16-03-037-03 W5/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 03
Section: 03
County/Municipality: Red Deer County
Well Name: ANDERSON SYLAKE 16-3-37-3
Operator Name: InPlay Oil Corp.
License Number: 0140336
License Date: 1989-07-10
License Status: Abandoned
Spud Date: 1989-09-10
Final Drill Date: 1989-09-24
Well Total Depth: 2330.00 m
Surface Hole Latitude: 52.155824
Surface Hole Longitude: -114.340208

For data sources see[1][2]

Well History

Date Event
1989-07-10 Obtained License
1989-09-12 Surface Casing Operation Performed
1989-09-24 Finished Drilling
1989-09-24 Well Log Performed
1989-09-26 Drill Stem Test Performed
1989-09-27 Drill Stem Test Performed
1989-09-29 Production Casing Operation Performed
1989-09-29 Rig Released
1989-09-29 Well Log Performed
1989-10-17 Well Log Performed
1989-10-18 Well Log Performed
1989-10-19 Perforation Treatment Performed - Jet Perforation
1989-10-21 Perforation Treatment Performed - Acid Wash - No Pressure
1990-01-15 Well Mode changed to Drilled and Cased
1990-09-27 Perforation Treatment Performed - Jet Perforation
1990-09-27 Well Log Performed
1990-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-02 Well Began Production
1990-11-02 Well Fluid changed to Crude Oil
1990-11-02 Well Mode changed to Pumping
1996-09-30 Well Fluid changed to Crude Oil
1996-09-30 Well Mode changed to Suspended
1998-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-08 Plug Back Performed
1998-10-08 Well Log Performed
1998-10-09 Perforation Treatment Performed - Jet Perforation
1998-10-09 Well Log Performed
1998-10-10 Perforation Treatment Performed - Remedial Casing
1998-10-11 Well Fluid changed to Crude Oil
1998-10-11 Well Mode changed to Abandoned and Re-entered
2010-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-02-22 Plug Back Performed
2010-02-23 Well Log Performed
2013-03-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-10-19 Perforation 2277.50 2281.00 13
1989-10-21 Acid Wash 2277.50 2281.00 0
1990-09-27 Perforation 2277.50 2281.00 13
1990-09-28 Acid Treatment 2277.50 2281.00 0
1998-10-08 Packing Device Capped w/Cement 2260.00 2268.00 0
1998-10-09 Perforation 399.00 400.00 17
1998-10-10 Remedial Casing Cementing 399.00 400.00 0
2010-02-22 Packing Device Capped w/Cement 2216.50 2225.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 1344 0.0 0.0 0.0
1991 7292 0.0 0.0 0.0
1992 8226 0.0 0.0 0.0
1993 6807 0.0 0.0 0.0
1994 4644 0.0 0.0 0.0
1995 3946 0.0 0.0 0.0

For data sources see[5]

References