X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0375020412002

Well Details

Well ID: 0375020412002
Loading map...
Location: 00/12-04-037-02W5/2
Location Alias: 00/12-04-37-02 W5M
Location Alias 2: 00/12-04-037-02 W5/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 5
Range: 02
Section: 04
County/Municipality: Red Deer County
Well Name: HARVEST ET AL SYLAKE 12-4-37-2
Operator Name: Harvest Operations Corp.
License Number: 0354253
License Date: 2006-03-16
License Status: Suspension
Spud Date: 2006-03-20
Final Drill Date: 2006-03-21
Well Total Depth: 905.00 m
Surface Hole Latitude: 52.152139
Surface Hole Longitude: -114.234428

For data sources see[1][2]

Well History

Date Event
2006-03-16 Obtained License
2006-03-20 Surface Casing Operation Performed
2006-03-21 Finished Drilling
2006-03-21 Production Casing Operation Performed
2006-03-21 Rig Released
2006-03-21 Well Log Performed
2006-03-21 Well Mode changed to Drilled and Cased
2006-03-26 Perforation Treatment Performed - Jet Perforation
2006-03-26 Well Log Performed
2006-03-27 Perforation Treatment Performed - Fractured
2006-03-29 Well Fluid changed to Gas
2006-03-29 Well Mode changed to Testing
2006-10-02 Well Began Production
2006-10-02 Well Fluid changed to Gas
2006-10-02 Well Mode changed to Flowing
2015-05-01 Well Fluid changed to Gas
2015-05-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-26 Perforation 831.00 834.50 17
2006-03-26 Perforation 408.50 412.00 17
2006-03-26 Perforation 405.00 408.50 17
2006-03-26 Perforation 396.00 399.00 17
2006-03-27 Fracture 831.00 834.50 0
2006-03-27 Fracture 650.00 651.50 0
2006-03-27 Fracture 642.50 645.50 0
2006-03-27 Fracture 602.50 603.50 0
2006-03-27 Fracture 594.00 596.50 0
2006-03-27 Fracture 573.00 574.00 0
2006-03-27 Fracture 508.50 510.00 0
2006-03-26 Perforation 650.00 651.50 17
2006-03-27 Fracture 458.00 460.00 0
2006-03-27 Fracture 435.00 436.00 0
2006-03-27 Fracture 405.00 412.00 0
2006-03-27 Fracture 396.00 399.00 0
2006-03-26 Perforation 642.50 645.50 17
2006-03-26 Perforation 602.50 603.50 17
2006-03-26 Perforation 594.00 596.50 17
2006-03-26 Perforation 573.00 574.00 17
2006-03-26 Perforation 508.50 510.00 17
2006-03-26 Perforation 458.00 460.00 17
2006-03-26 Perforation 435.00 436.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 2194 0.0 0.0 0.0
2007 8526 0.0 0.0 0.0
2008 8542 0.0 0.0 0.0
2009 8697 0.0 0.0 0.0
2010 8541 0.0 0.0 0.0
2011 8690 0.0 0.0 0.0
2012 8490 0.0 0.0 0.0
2013 8509 0.0 0.0 0.0
2014 8468 0.0 0.0 0.0
2015 2879 0.0 0.0 0.0

For data sources see[5]

References