X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374222006000

Well Details

Well ID: 0374222006000
Loading map...
Location: 00/06-20-037-22W4/0
Location Alias: 00/06-20-37-22 W4M
Location Alias 2: 00/06-20-037-22 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 22
Section: 20
County/Municipality: Red Deer County
Well Name: KAISER SCEPTRE MIKWAN 6-20-37-22
Operator Name: Obsidian Energy Ltd.
License Number: 0114305
License Date: 1985-04-24
License Status: RecCertified
Spud Date: 1985-05-17
Final Drill Date: 1985-05-23
Well Total Depth: 1590.00 m
Surface Hole Latitude: 52.191634
Surface Hole Longitude: -113.117292

For data sources see[1][2]

Well History

Date Event
1985-04-24 Obtained License
1985-05-18 Surface Casing Operation Performed
1985-05-23 Finished Drilling
1985-05-24 Well Log Performed
1985-05-25 Drill Stem Test Performed
1985-05-26 Drill Stem Test Performed
1985-05-27 Drill Stem Test Performed
1985-05-28 Production Casing Operation Performed
1985-05-29 Rig Released
1985-06-01 Well Log Performed
1985-06-02 Perforation Treatment Performed - Jet Perforation
1985-06-02 Well Log Performed
1985-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-06-05 Plug Back Performed
1985-06-05 Well Log Performed
1985-06-06 Perforation Treatment Performed - Jet Perforation
1985-06-07 Perforation Treatment Performed - Fractured
1985-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-06-10 Plug Back Performed
1985-06-10 Well Log Performed
1985-06-11 Perforation Treatment Performed - Fractured
1985-06-11 Perforation Treatment Performed - Jet Perforation
1985-06-11 Well Log Performed
1985-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-06-22 Plug Back Performed
1985-06-22 Well Log Performed
1985-06-23 Perforation Treatment Performed - Jet Perforation
1985-06-23 Well Log Performed
1985-06-25 Well Mode changed to Drilled and Cased
1986-12-01 Well Began Production
1986-12-01 Well Fluid changed to Gas
1986-12-01 Well Mode changed to Flowing
1998-05-01 Well Fluid changed to Gas
1998-05-01 Well Mode changed to Suspended
2002-07-03 Perforation Treatment Performed - Cement Squeeze
2002-07-04 Perforation Treatment Performed - Jet Perforation
2002-08-09 Perforation Treatment Performed - Jet Perforation
2002-08-09 Well Log Performed
2002-08-10 Perforation Treatment Performed - Chemical Squeeze
2003-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-05-16 Plug Back Performed
2003-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-05-17 Perforation Treatment Performed - Jet Perforation
2003-05-17 Plug Back Performed
2003-05-17 Well Fluid changed to Gas
2003-05-17 Well Log Performed
2003-05-17 Well Mode changed to Abandoned Zone
2003-05-18 Perforation Treatment Performed - Chemical Squeeze
2003-05-20 Well Abandoned
2003-05-20 Well Fluid changed to Gas
2003-05-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-06-02 Perforation 1562.00 1564.00 13
1985-06-23 Perforation 1373.00 1376.00 13
2002-07-03 Cement Squeeze 1373.00 1376.00 0
2002-07-04 Perforation 1521.00 1523.00 13
2002-07-04 Perforation 1549.50 1552.50 13
2002-08-09 Perforation 1551.00 1552.50 17
2002-08-10 Chemical Squeeze 1551.00 1552.50 0
2003-05-16 Packing Device Capped w/Cement 1552.00 1560.00 0
2003-05-16 Packing Device Capped w/Cement 1528.00 1536.00 0
2003-05-17 Packing Device Capped w/Cement 1504.00 1512.00 0
2003-05-17 Perforation 415.00 417.00 17
1985-06-04 Acid Treatment 1562.00 1564.00 0
2003-05-18 Chemical Squeeze 415.00 417.00 0
1985-06-05 Packing Device Capped w/Cement 1559.50 1560.50 0
1985-06-06 Perforation 1549.00 1552.50 13
1985-06-07 Fracture 1549.00 1552.50 0
1985-06-10 Packing Device Capped w/Cement 1547.00 1548.00 0
1985-06-11 Perforation 1521.00 1523.00 13
1985-06-11 Fracture 1521.00 1523.00 0
1985-06-22 Packing Device Capped w/Cement 1507.00 1510.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 266 0.0 0.0 0.0
1987 4583 0.0 0.0 0.0
1988 1489 0.0 0.0 0.0
1989 8023 0.0 0.0 0.0
1990 8169 0.0 0.0 0.0
1991 8043 0.0 0.0 0.0
1992 8388 0.0 0.0 0.0
1993 8585 0.0 0.0 0.0
1994 8220 0.0 0.0 0.0
1995 8340 0.0 0.0 0.0
1996 6637 0.0 0.0 0.0
1997 3223 0.0 0.0 0.0
1998 190 0.0 0.0 0.0

For data sources see[5]

References