If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0374213604020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.218737,"lon":-112.880932,"icon":""}]} |
Location: 02/04-36-037-21W4/0 | |
Location Alias: 02/04-36-37-21 W4M | |
Location Alias 2: 02/04-36-037-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 4 | |
Range: 21 | |
Section: 36 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: BEARSPAW 102 EWINGLK 4-36-37-21 | |
Operator Name: Bearspaw Petroleum Ltd. | |
License Number: 0401245 | |
License Date: 2008-09-23 | |
License Status: Issued | |
Spud Date: 2008-10-26 | |
Final Drill Date: 2008-10-27 | |
Well Total Depth: 702.00 m | |
Surface Hole Latitude: 52.218737 | |
Surface Hole Longitude: -112.880932 |
Date | Event |
---|---|
2008-09-23 | Obtained License |
2008-10-26 | Surface Casing Operation Performed |
2008-10-27 | Finished Drilling |
2008-10-27 | Production Casing Operation Performed |
2008-10-27 | Well Mode changed to Drilled and Cased |
2008-10-28 | Rig Released |
2008-11-21 | Well Log Performed |
2009-01-13 | Perforation Treatment Performed - Jet Perforation |
2009-01-15 | Perforation Treatment Performed - Fractured |
2010-07-09 | Well Began Production |
2010-07-09 | Well Fluid changed to Gas |
2010-07-09 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-01-13 | Perforation | 235.20 | 236.20 | 14 |
2009-01-13 | Perforation | 294.80 | 296.30 | 14 |
2009-01-13 | Perforation | 305.50 | 307.00 | 14 |
2009-01-13 | Perforation | 276.00 | 278.00 | 14 |
2009-01-13 | Perforation | 330.00 | 334.00 | 14 |
2009-01-13 | Perforation | 335.50 | 336.50 | 14 |
2009-01-13 | Perforation | 346.50 | 348.00 | 14 |
2009-01-13 | Perforation | 352.30 | 353.80 | 14 |
2009-01-13 | Perforation | 435.50 | 437.50 | 14 |
2009-01-13 | Perforation | 438.50 | 440.00 | 14 |
2009-01-13 | Perforation | 547.00 | 550.00 | 14 |
2009-01-13 | Perforation | 245.00 | 248.00 | 14 |
2009-01-15 | Fracture | 547.00 | 550.00 | 0 |
2009-01-15 | Fracture | 438.50 | 440.00 | 0 |
2009-01-15 | Fracture | 435.50 | 437.50 | 0 |
2009-01-15 | Fracture | 352.30 | 353.80 | 0 |
2009-01-15 | Fracture | 346.50 | 348.00 | 0 |
2009-01-15 | Fracture | 335.50 | 336.50 | 0 |
2009-01-15 | Fracture | 330.00 | 334.00 | 0 |
2009-01-15 | Fracture | 276.00 | 278.00 | 0 |
2009-01-15 | Fracture | 305.50 | 307.00 | 0 |
2009-01-15 | Fracture | 294.80 | 296.30 | 0 |
2009-01-13 | Perforation | 251.00 | 252.00 | 14 |
2009-01-15 | Fracture | 290.50 | 293.00 | 0 |
2009-01-15 | Fracture | 288.60 | 289.60 | 0 |
2009-01-15 | Fracture | 271.00 | 272.00 | 0 |
2009-01-15 | Fracture | 267.50 | 269.00 | 0 |
2009-01-15 | Fracture | 261.80 | 264.30 | 0 |
2009-01-15 | Fracture | 253.00 | 254.50 | 0 |
2009-01-15 | Fracture | 251.00 | 252.00 | 0 |
2009-01-15 | Fracture | 245.00 | 248.00 | 0 |
2009-01-15 | Fracture | 235.20 | 236.20 | 0 |
2009-01-13 | Perforation | 253.00 | 254.50 | 14 |
2009-01-13 | Perforation | 261.80 | 264.30 | 14 |
2009-01-13 | Perforation | 267.50 | 269.00 | 14 |
2009-01-13 | Perforation | 271.00 | 272.00 | 14 |
2009-01-13 | Perforation | 288.60 | 289.60 | 14 |
2009-01-13 | Perforation | 290.50 | 293.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 3991 | 0.0 | 0.0 | 0.0 |
2011 | 7390 | 0.0 | 0.0 | 0.0 |
2012 | 8617 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8571 | 0.0 | 0.0 | 0.0 |
2015 | 8679 | 0.0 | 0.0 | 0.0 |
2016 | 8303 | 0.0 | 0.0 | 0.0 |
2017 | 6644 | 0.0 | 0.0 | 0.0 |
2018 | 4860 | 0.0 | 0.0 | 0.0 |
2019 | 5931 | 0.0 | 0.0 | 0.0 |
2020 | 2087 | 0.0 | 0.0 | 0.0 |
For data sources see[5]