If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0374201605000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.175735,"lon":-112.809528,"icon":""}]} |
| Location: 00/05-16-037-20W4/0 | |
| Location Alias: 00/05-16-37-20 W4M | |
| Location Alias 2: 00/05-16-037-20 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 037 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 16 | |
| County/Municipality: County of Stettler No. 6 | |
| Well Name: CHALNGR FENNBV 5-16-37-20 | |
| Operator Name: Challenger Development Corp. | |
| License Number: 0363517 | |
| License Date: 2006-09-22 | |
| License Status: Issued | |
| Spud Date: 2006-10-04 | |
| Final Drill Date: 2006-10-08 | |
| Well Total Depth: 470.00 m | |
| Surface Hole Latitude: 52.175735 | |
| Surface Hole Longitude: -112.809528 |
| Date | Event |
|---|---|
| 2006-09-22 | Obtained License |
| 2006-10-04 | Surface Casing Operation Performed |
| 2006-10-08 | Finished Drilling |
| 2006-10-08 | Production Casing Operation Performed |
| 2006-10-08 | Rig Released |
| 2006-10-08 | Well Mode changed to Drilled and Cased |
| 2007-08-24 | Perforation Treatment Performed - Fractured |
| 2007-08-24 | Perforation Treatment Performed - Jet Perforation |
| 2007-09-04 | Perforation Treatment Performed - Jet Perforation |
| 2007-09-06 | Perforation Treatment Performed - Fractured |
| 2007-11-08 | Well Began Production |
| 2007-11-08 | Well Fluid changed to Gas |
| 2007-11-08 | Well Mode changed to Flowing |
| 2008-06-06 | Perforation Treatment Performed - Jet Perforation |
| 2008-06-18 | Perforation Treatment Performed - Fractured |
| 2012-02-01 | Well Fluid changed to Gas |
| 2012-02-01 | Well Mode changed to Suspended |
| 2012-10-01 | Well Fluid changed to Gas |
| 2012-10-01 | Well Mode changed to Flowing |
| 2016-05-01 | Well Fluid changed to Gas |
| 2016-05-01 | Well Mode changed to Suspended |
| 2016-10-01 | Well Fluid changed to Gas |
| 2016-10-01 | Well Mode changed to Flowing |
| 2018-04-22 | Well Fluid changed to Gas |
| 2018-04-22 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2007-08-24 | Perforation | 331.50 | 337.00 | 13 |
| 2008-06-06 | Perforation | 267.50 | 269.00 | 14 |
| 2008-06-06 | Perforation | 258.00 | 259.00 | 14 |
| 2008-06-06 | Perforation | 252.00 | 253.00 | 14 |
| 2008-06-06 | Perforation | 241.30 | 242.30 | 14 |
| 2008-06-06 | Perforation | 212.30 | 213.30 | 14 |
| 2008-06-18 | Fracture | 354.00 | 355.00 | 0 |
| 2008-06-18 | Fracture | 348.30 | 349.30 | 0 |
| 2008-06-18 | Fracture | 305.60 | 307.10 | 0 |
| 2008-06-18 | Fracture | 297.00 | 298.00 | 0 |
| 2008-06-18 | Fracture | 293.00 | 294.00 | 0 |
| 2007-08-24 | Fracture | 331.50 | 337.00 | 0 |
| 2008-06-18 | Fracture | 267.50 | 269.00 | 0 |
| 2008-06-18 | Fracture | 258.00 | 259.00 | 0 |
| 2008-06-18 | Fracture | 252.00 | 253.00 | 0 |
| 2008-06-18 | Fracture | 241.30 | 242.30 | 0 |
| 2008-06-18 | Fracture | 212.30 | 213.30 | 0 |
| 2007-09-04 | Perforation | 286.00 | 289.20 | 14 |
| 2007-09-06 | Fracture | 286.00 | 289.20 | 0 |
| 2008-06-06 | Perforation | 354.00 | 355.00 | 14 |
| 2008-06-06 | Perforation | 348.30 | 349.30 | 14 |
| 2008-06-06 | Perforation | 305.60 | 307.10 | 14 |
| 2008-06-06 | Perforation | 297.00 | 298.00 | 14 |
| 2008-06-06 | Perforation | 293.00 | 294.00 | 14 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2007 | 1296 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8554 | 0.0 | 0.0 | 0.0 |
| 2010 | 8661 | 0.0 | 0.0 | 0.0 |
| 2011 | 8562 | 0.0 | 0.0 | 0.0 |
| 2012 | 2952 | 0.0 | 0.0 | 0.0 |
| 2013 | 8743 | 0.0 | 0.0 | 0.0 |
| 2014 | 8755 | 0.0 | 0.0 | 0.0 |
| 2015 | 8758 | 0.0 | 0.0 | 0.0 |
| 2016 | 5107 | 0.0 | 0.0 | 0.0 |
| 2017 | 7569 | 0.0 | 0.0 | 0.0 |
| 2018 | 2595 | 0.0 | 0.0 | 0.0 |
For data sources see[5]