X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374200712000

Well Details

Well ID: 0374200712000
Loading map...
Location: 00/12-07-037-20W4/0
Location Alias: 00/12-07-37-20 W4M
Location Alias 2: 00/12-07-037-20 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 20
Section: 07
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH EWINGLK 12-7-37-20
Operator Name: Cona Resources Ltd.
License Number: 0022027
License Date: 1962-02-01
License Status: Suspension
Spud Date: 1962-02-13
Final Drill Date: 1962-03-02
Well Total Depth: 1674.90 m
Surface Hole Latitude: 52.166835
Surface Hole Longitude: -112.859494

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-02-01 Obtained License
1962-02-19 Lost Circulation Occurred
1962-02-26 Drill Stem Test Performed
1962-02-28 Drill Stem Test Performed
1962-03-01 Drill Stem Test Performed
1962-03-02 Finished Drilling
1962-03-02 Well Mode changed to Drilled and Cased
1962-03-03 Production Casing Operation Performed
1962-03-07 Perforation Treatment Performed - Bullet Perforation
1962-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-03-11 Perforation Treatment Performed - Cement Squeeze
1962-03-13 Perforation Treatment Performed - Acid Wash - No Pressure
1962-03-13 Perforation Treatment Performed - Jet Perforation
1962-05-10 Perforation Treatment Performed - Cement Squeeze
1962-05-12 Perforation Treatment Performed - Jet Perforation
1962-05-13 Perforation Treatment Performed - Acid Wash - No Pressure
1962-05-13 Perforation Treatment Performed - Jet Perforation
1962-05-15 Well Began Production
1962-05-15 Well Fluid changed to Crude Oil
1962-05-15 Well Mode changed to Flowing
1965-05-07 Perforation Treatment Performed - Cement Squeeze
1965-05-10 Perforation Treatment Performed - Abrasa-Jet Perforation
1965-05-13 Perforation Treatment Performed - Acid Wash - No Pressure
1965-05-15 Perforation Treatment Performed - Abrasa-Jet Perforation
1965-05-18 Perforation Treatment Performed - Acid Wash - No Pressure
1965-05-20 Well Fluid changed to Crude Oil
1965-05-20 Well Mode changed to Pumping
1969-05-23 Well Fluid changed to Crude Oil
1969-05-23 Well Mode changed to Suspended
1973-11-28 Perforation Treatment Performed - Cement Squeeze
1973-11-30 Perforation Treatment Performed - Jet Perforation
1973-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-04 Well Began Injection
1973-12-04 Well Fluid changed to Water
1973-12-04 Well Type changed to Disposal
1989-06-04 Well Log Performed
1989-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-13 Production Casing Operation Performed
2007-09-01 Well Fluid changed to Water
2007-09-01 Well Mode changed to Suspended
2007-09-01 Well Type changed to Disposal
2008-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-09-13 Perforation Treatment Performed - Cement Plug
2008-09-15 Well Log Performed
2008-09-16 Perforation Treatment Performed - Jet Perforation
2008-09-16 Well Log Performed
2008-09-17 Perforation Treatment Performed - Remedial Casing
2008-09-21 Well Log Performed
2008-09-23 Perforation Treatment Performed - Cement Plug
2008-09-24 Well Log Performed
2008-09-26 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-09-27 Perforation Treatment Performed - Cement Plug
2008-09-27 Perforation Treatment Performed - Remedial Casing
2008-10-01 Well Log Performed
2008-10-06 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-10-07 Perforation Treatment Performed - Cement Plug
2008-10-07 Perforation Treatment Performed - Remedial Casing
2008-10-17 Well Log Performed
2008-10-27 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-10-28 Perforation Treatment Performed - Cement Plug
2008-10-28 Perforation Treatment Performed - Remedial Casing
2008-10-30 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-10-31 Perforation Treatment Performed - Cement Plug
2008-10-31 Perforation Treatment Performed - Remedial Casing
2008-11-02 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-11-03 Perforation Treatment Performed - Cement Plug
2008-11-03 Perforation Treatment Performed - Remedial Casing
2008-11-03 Plug Back Performed
2008-11-03 Well Fluid changed to Water
2008-11-03 Well Mode changed to Abandoned Zone
2008-11-03 Well Type changed to Disposal
2008-11-05 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-11-06 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-03-07 Bullet Perforation 1641.00 1642.90 13
1965-05-07 Cement Squeeze 1637.70 1638.60 0
1965-05-10 Hydra Jet Perforation 1638.30 1638.30 0
1965-05-13 Acid Wash 1638.30 1638.30 0
1965-05-15 Hydra Jet Perforation 1638.60 1638.60 0
1965-05-18 Acid Wash 1638.60 1638.60 0
1973-11-28 Cement Squeeze 1638.30 1638.60 0
1973-11-30 Perforation 1655.10 1658.10 13
1973-12-03 Acid Treatment 1655.10 1658.10 0
1989-06-13 Acid Treatment 1655.10 1658.10 0
2008-08-27 Acid Treatment 1655.10 1658.10 0
1962-03-08 Acid Treatment 1641.00 1642.90 0
2008-09-13 Cement Plug 1503.00 1653.80 0
2008-09-16 Perforation 1326.70 1328.50 20
2008-09-17 Remedial Casing Cementing 1326.70 1328.50 0
2008-09-23 Cement Plug 1303.00 1316.00 0
2008-09-26 Hydra Jet Perforation 1089.50 1090.00 20
2008-09-27 Remedial Casing Cementing 1089.50 1090.00 0
2008-09-27 Cement Plug 855.00 1145.00 0
2008-10-06 Hydra Jet Perforation 852.00 855.00 20
2008-10-07 Remedial Casing Cementing 852.00 855.00 0
2008-10-07 Cement Plug 750.00 1022.00 0
1962-03-11 Cement Squeeze 1641.00 1642.90 0
2008-10-27 Hydra Jet Perforation 671.00 672.00 20
2008-10-28 Remedial Casing Cementing 671.00 672.00 0
2008-10-28 Cement Plug 561.00 753.00 0
2008-10-30 Hydra Jet Perforation 386.00 387.00 20
2008-10-31 Remedial Casing Cementing 386.00 387.00 0
2008-10-31 Cement Plug 360.00 561.00 0
2008-11-02 Hydra Jet Perforation 281.00 282.00 20
2008-11-03 Remedial Casing Cementing 281.00 282.00 0
2008-11-03 Cement Plug 270.00 362.00 0
2008-11-05 Hydra Jet Perforation 255.00 256.00 20
1962-03-13 Perforation 1637.70 1639.20 13
2008-11-06 Remedial Casing Cementing 255.00 256.00 0
1962-03-13 Acid Wash 1637.70 1639.20 0
1962-05-10 Cement Squeeze 1637.70 1639.20 0
1962-05-12 Perforation 1637.70 1638.30 13
1962-05-13 Perforation 1638.00 1638.60 13
1962-05-13 Acid Wash 1638.00 1638.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1962-02-19 Lost Circulation 1316.70 1354.50

For data sources see[6]

References