X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374200311000

Well Details

Well ID: 0374200311000
Loading map...
Location: 00/11-03-037-20W4/0
Location Alias: 00/11-03-37-20 W4M
Location Alias 2: 00/11-03-037-20 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 20
Section: 03
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 11-3-37-20
Operator Name: Cona Resources Ltd.
License Number: 0008010
License Date: 1954-05-07
License Status: Abandoned
Spud Date: 1954-05-19
Final Drill Date: 1954-06-06
Well Total Depth: 1635.50 m
Surface Hole Latitude: 52.151881
Surface Hole Longitude: -112.781133

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-05-07 Obtained License
1954-06-03 Production Casing Operation Performed
1954-06-06 Finished Drilling
1954-06-06 Perforation Treatment Performed - Open-Hole Completion
1954-06-06 Well Mode changed to Drilled and Cased
1954-06-09 Well Began Production
1954-06-09 Well Fluid changed to Crude Oil
1954-06-09 Well Mode changed to Flowing
1982-12-17 Perforation Treatment Performed - Open-Hole Completion
1983-01-09 Perforation Treatment Performed - Cement Squeeze
1983-01-13 Perforation Treatment Performed - Jet Perforation
1983-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-25 Well Began Injection
1983-06-25 Well Fluid changed to Water
1983-06-25 Well Type changed to Disposal
1986-03-25 Perforation Treatment Performed - Acid Wash - No Pressure
1987-11-21 Perforation Treatment Performed - Acid Wash - No Pressure
1990-11-10 Perforation Treatment Performed - Acid Wash - No Pressure
1992-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-31 Well Fluid changed to Water
2000-10-31 Well Mode changed to Suspended
2000-10-31 Well Type changed to Disposal
2002-08-29 Well Log Performed
2005-07-05 Perforation Treatment Performed - Jet Perforation
2005-07-05 Perforation Treatment Performed - Remedial Casing
2005-07-06 Perforation Treatment Performed - Jet Perforation
2005-07-06 Perforation Treatment Performed - Remedial Casing
2005-07-07 Perforation Treatment Performed - Jet Perforation
2005-07-07 Perforation Treatment Performed - Remedial Casing
2005-07-08 Perforation Treatment Performed - Jet Perforation
2005-07-08 Perforation Treatment Performed - Remedial Casing
2005-07-09 Perforation Treatment Performed - Jet Perforation
2005-07-10 Perforation Treatment Performed - Cement Plug
2005-07-10 Perforation Treatment Performed - Remedial Casing
2005-07-10 Plug Back Performed
2005-07-10 Well Fluid changed to Water
2005-07-10 Well Mode changed to Abandoned Zone
2005-07-10 Well Type changed to Disposal
2005-08-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-06-06 Open Hole/Barefoot Completion 1603.60 1613.90 0
1993-01-15 Acid Treatment 1625.30 1628.60 0
1996-03-27 Acid Treatment 1625.30 1628.60 0
1996-03-28 Acid Treatment 1625.30 1628.60 0
2005-07-05 Perforation 665.50 666.50 17
2005-07-05 Remedial Casing Cementing 665.50 666.50 0
2005-07-06 Perforation 397.00 398.00 17
2005-07-06 Remedial Casing Cementing 397.00 398.00 0
2005-07-07 Perforation 306.00 307.00 17
2005-07-07 Remedial Casing Cementing 306.00 307.00 0
2005-07-08 Perforation 200.00 201.00 17
1982-12-17 Open Hole/Barefoot Completion 1603.60 1635.50 0
2005-07-08 Remedial Casing Cementing 200.00 201.00 0
2005-07-09 Perforation 106.40 107.40 17
2005-07-10 Remedial Casing Cementing 106.40 107.40 0
2005-07-10 Cement Plug 8.00 102.00 0
1983-01-09 Cement Squeeze 1603.60 1635.50 0
1983-01-13 Perforation 1625.30 1628.60 13
1983-01-14 Acid Treatment 1625.30 1628.60 0
1986-03-25 Acid Wash 1625.30 1628.60 0
1987-11-21 Acid Wash 1625.30 1628.60 0
1990-11-10 Acid Wash 1625.30 1628.60 0
1992-03-20 Acid Treatment 1625.30 1628.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0

For data sources see[5]

References