X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374160608000

Well Details

Well ID: 0374160608000
Loading map...
Location: 00/08-06-037-16W4/0
Location Alias: 00/08-06-37-16 W4M
Location Alias 2: 00/08-06-037-16 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 16
Section: 06
County/Municipality: County of Stettler No. 6
Well Name: ALTEX ET AL PROVOST 8-6-37-16
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0123877
License Date: 1986-09-11
License Status: RecCertified
Spud Date: 1986-09-17
Final Drill Date: 1986-09-20
Well Total Depth: 1168.50 m
Surface Hole Latitude: 52.147037
Surface Hole Longitude: -112.272119

For data sources see[1][2]

Well History

Date Event
1986-09-11 Obtained License
1986-09-18 Surface Casing Operation Performed
1986-09-20 Finished Drilling
1986-09-20 Well Log Performed
1986-09-20 Well Mode changed to Drilled and Cased
1986-09-21 Drill Stem Test Performed
1986-09-21 Well Log Performed
1986-09-22 Production Casing Operation Performed
1986-09-22 Rig Released
1986-10-22 Well Log Performed
1986-10-23 Perforation Treatment Performed - Jet Perforation
1986-10-23 Well Log Performed
1986-10-24 Perforation Treatment Performed - Fractured
1986-12-15 Well Began Production
1986-12-15 Well Fluid changed to Gas
1986-12-15 Well Mode changed to Flowing
1993-06-01 Well Fluid changed to Gas
1993-06-01 Well Mode changed to Suspended
1994-09-17 Well Log Performed
1994-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-18 Perforation Treatment Performed - Jet Perforation
1994-09-18 Perforation Treatment Performed - Remedial Casing
1994-09-18 Plug Back Performed
1994-09-18 Well Abandoned
1994-09-18 Well Fluid changed to Gas
1994-09-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-10-23 Perforation 1143.00 1145.00 13
1986-10-23 Perforation 1136.00 1141.00 13
1986-10-23 Perforation 1129.50 1134.00 13
1986-10-24 Fracture 1129.50 1145.00 0
1994-09-18 Packing Device Capped w/Cement 1116.00 1124.00 0
1994-09-18 Perforation 270.00 270.50 13
1994-09-18 Remedial Casing Cementing 270.00 270.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 363 0.0 0.0 0.0
1987 5583 0.0 0.0 0.0
1988 5130 0.0 0.0 0.0
1989 3659 0.0 0.0 0.0
1990 602 0.0 0.0 0.0
1991 937 0.0 0.0 0.0
1992 2075 0.0 0.0 0.0

For data sources see[5]

References