X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374131806020

Well Details

Well ID: 0374131806020
Loading map...
Location: 02/06-18-037-13W4/0
Location Alias: 02/06-18-37-13 W4M
Location Alias 2: 02/06-18-037-13 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 13
Section: 18
County/Municipality: County of Paintearth No. 18
Well Name: DEML PROVOST 6-18-37-13
Operator Name: Direct Energy Marketing Limited
License Number: 0224133
License Date: 1999-07-02
License Status: RecCertified
Spud Date: 1999-08-02
Final Drill Date: 1999-08-03
Well Total Depth: 587.00 m
Surface Hole Latitude: 52.176655
Surface Hole Longitude: -111.853190

For data sources see[1][2]

Well History

Date Event
1999-07-02 Obtained License
1999-08-02 Surface Casing Operation Performed
1999-08-03 Finished Drilling
1999-08-03 Production Casing Operation Performed
1999-08-03 Rig Released
1999-08-03 Well Mode changed to Drilled and Cased
1999-08-23 Well Log Performed
1999-08-25 Perforation Treatment Performed - Jet Perforation
1999-08-25 Well Log Performed
1999-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-28 Perforation Treatment Performed - Jet Perforation
1999-08-28 Plug Back Performed
1999-08-28 Well Log Performed
1999-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-02 Perforation Treatment Performed - Jet Perforation
1999-09-02 Plug Back Performed
1999-09-02 Well Log Performed
1999-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-18 Perforation Treatment Performed - Jet Perforation
1999-10-18 Plug Back Performed
1999-10-18 Well Log Performed
1999-10-18 Well Mode changed to Abandoned Zone
2002-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-08 Plug Back Performed
2002-06-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-08-25 Perforation 449.00 453.00 14
1999-08-28 Packing Device Capped w/Cement 432.00 440.00 0
1999-08-28 Perforation 223.00 226.00 14
1999-09-02 Packing Device Capped w/Cement 207.00 215.00 0
1999-09-02 Perforation 155.50 159.50 14
1999-10-18 Packing Device Capped w/Cement 144.00 152.00 0
1999-10-18 Perforation 88.50 91.50 14
2002-06-08 Packing Device Capped w/Cement 70.00 78.00 0

For data sources see[4]



References