X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374071506022

Well Details

Well ID: 0374071506022
Loading map...
Location: 02/06-15-037-07W4/2
Location Alias: 02/06-15-37-07 W4M
Location Alias 2: 02/06-15-037-07 W4/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 07
Section: 15
County/Municipality: Special Areas No. 4
Well Name: CLEO ENERGY PROVOST 6-15-37-7
Operator Name: Cleo Energy Corp.
License Number: 0143394
License Date: 1990-02-22
License Status: Abandoned
Spud Date: 1990-02-24
Final Drill Date: 1990-02-27
Well Total Depth: 1012.00 m
Surface Hole Latitude: 52.176258
Surface Hole Longitude: -110.926748

For data sources see[1][2]

Well History

Date Event
1990-02-22 Obtained License
1990-02-25 Surface Casing Operation Performed
1990-02-27 Finished Drilling
1990-02-27 Well Mode changed to Drilled and Cased
1990-02-28 Well Log Performed
1990-03-01 Production Casing Operation Performed
1990-03-01 Rig Released
1990-05-12 Perforation Treatment Performed - Jet Perforation
1990-08-30 Perforation Treatment Performed - Acid Wash - No Pressure
1990-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-31 Perforation Treatment Performed - Cement Squeeze
1990-08-31 Plug Back Performed
1990-09-04 Perforation Treatment Performed - Jet Perforation
1990-09-07 Well Log Performed
1990-09-12 Well Began Production
1990-09-12 Well Fluid changed to Crude Oil
1990-09-12 Well Mode changed to Pumping
2003-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-08 Plug Back Performed
2003-06-08 Well Fluid changed to Crude Oil
2003-06-08 Well Log Performed
2003-06-08 Well Mode changed to Abandoned Zone
2003-06-13 Well Abandoned
2003-06-13 Well Fluid changed to Crude Oil
2003-06-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-05-12 Perforation 949.40 950.40 7
1990-08-30 Acid Wash 949.40 950.40 0
1990-08-31 Acid Treatment 949.40 950.40 0
1990-08-31 Cement Squeeze 949.40 950.40 0
1990-09-04 Perforation 958.00 961.70 13
2003-06-08 Packing Device Capped w/Cement 946.20 954.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2551 0.0 0.0 0.0
1991 7757 0.0 0.0 0.0
1992 8522 0.0 0.0 0.0
1993 7887 0.0 0.0 0.0
1994 8148 0.0 0.0 0.0
1995 2394 0.0 0.0 0.0
2000 1430 0.0 0.0 0.0
2001 8372 0.0 0.0 0.0
2002 2633 0.0 0.0 0.0

For data sources see[5]

References