X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374071503D00

Well Details

Well ID: 0374071503D00
Loading map...
Location: D0/03-15-037-07W4/0
Location Alias: D0/03-15-37-07 W4M
Location Alias 2: D0/03-15-037-07 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 07
Section: 15
County/Municipality: Special Areas No. 4
Well Name: CLEO ENERGY PROVOST 3-15-37-7
Operator Name: Cleo Energy Corp.
License Number: 0146446
License Date: 1990-11-22
License Status: Abandoned
Spud Date: 1990-11-29
Final Drill Date: 1990-12-04
Well Total Depth: 1003.00 m
Surface Hole Latitude: 52.174839
Surface Hole Longitude: -110.926050

For data sources see[1][2]

Well History

Date Event
1990-11-22 Obtained License
1990-11-30 Surface Casing Operation Performed
1990-12-02 Direction Drilling Operation Performed - Deviate
1990-12-04 Finished Drilling
1990-12-04 Well Log Performed
1990-12-04 Well Mode changed to Drilled and Cased
1990-12-05 Production Casing Operation Performed
1990-12-05 Well Log Performed
1990-12-06 Rig Released
1991-01-15 Perforation Treatment Performed - Jet Perforation
1991-01-15 Well Log Performed
1991-01-18 Well Began Production
1991-01-18 Well Fluid changed to Crude Oil
1991-01-18 Well Mode changed to Pumping
2003-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-13 Plug Back Performed
2003-01-13 Well Fluid changed to Crude Oil
2003-01-13 Well Mode changed to Abandoned Zone
2003-03-19 Well Abandoned
2003-03-19 Well Fluid changed to Crude Oil
2003-03-19 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-12-02 353.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-01-15 Perforation 968.70 972.00 26
1991-01-15 Perforation 972.50 973.00 26
2003-01-13 Packing Device Capped w/Cement 950.00 958.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 7503 0.0 0.0 0.0
1992 8516 0.0 0.0 0.0
1993 8330 0.0 0.0 0.0
1994 7702 0.0 0.0 0.0
1995 3960 0.0 0.0 0.0

For data sources see[6]

References