X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374070412000

Well Details

Well ID: 0374070412000
Loading map...
Location: 00/12-04-037-07W4/0
Location Alias: 00/12-04-37-07 W4M
Location Alias 2: 00/12-04-037-07 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 07
Section: 04
County/Municipality: Special Areas No. 4
Well Name: KR BARNWELL PROVOST 12-4-37-7
Operator Name: Barnwell of Canada, Limited
License Number: 0033171
License Date: 1967-12-04
License Status: RecCertified
Spud Date: 1967-12-07
Final Drill Date: 1967-12-09
Well Total Depth: 835.20 m
Surface Hole Latitude: 52.152124
Surface Hole Longitude: -110.954773

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-12-04 Obtained License
1967-12-09 Finished Drilling
1967-12-10 Production Casing Operation Performed
1968-01-11 Perforation Treatment Performed - Jet Perforation
1968-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-01-12 Perforation Treatment Performed - Fractured
1968-03-15 Well Mode changed to Drilled and Cased
1970-08-12 Well Began Production
1970-08-12 Well Fluid changed to Crude Oil
1970-08-12 Well Mode changed to Pumping
1985-03-26 Well Fluid changed to Crude Oil
1985-03-26 Well Mode changed to Suspended
1992-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-10-06 Plug Back Performed
1992-10-06 Well Fluid changed to Crude Oil
1992-10-06 Well Mode changed to Abandoned
1992-10-07 Perforation Treatment Performed - Jet Perforation
1992-10-10 Perforation Treatment Performed - Remedial Casing
1992-10-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-01-11 Perforation 809.90 811.40 7
1968-01-12 Acid Treatment 809.90 811.40 0
1968-01-12 Fracture 809.90 811.40 0
1992-10-06 Packing Device Capped w/Cement 790.00 798.00 0
1992-10-07 Perforation 298.00 298.30 7
1992-10-10 Remedial Casing Cementing 298.00 298.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 0 0.0 0.0 0.0
1970 3295 0.0 0.0 0.0
1971 8270 0.0 0.0 0.0
1972 2183 0.0 0.0 0.0
1973 303 0.0 0.0 0.0
1974 4098 0.0 0.0 0.0
1975 4565 0.0 0.0 0.0
1976 6977 0.0 0.0 0.0
1977 3450 0.0 0.0 0.0
1978 3922 0.0 0.0 0.0
1979 7610 0.0 0.0 0.0
1980 6061 0.0 0.0 0.0
1981 170 0.0 0.0 0.0

For data sources see[5]

References