X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374070105A00

Well Details

Well ID: 0374070105A00
Loading map...
Location: A0/05-01-037-07W4/0
Location Alias: A0/05-01-37-07 W4M
Location Alias 2: A0/05-01-037-07 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 07
Section: 01
County/Municipality: Special Areas No. 4
Well Name: CLEO ENERGY PROVOST 5-1-37-7
Operator Name: Cleo Energy Corp.
License Number: 0152479
License Date: 1992-05-14
License Status: Abandoned
Spud Date: 1992-05-30
Final Drill Date: 1992-05-31
Well Total Depth: 970.00 m
Surface Hole Latitude: 52.147782
Surface Hole Longitude: -110.879926

For data sources see[1][2]

Well History

Date Event
1992-05-14 Obtained License
1992-05-30 Surface Casing Operation Performed
1992-05-30 Well Log Performed
1992-05-31 Finished Drilling
1992-05-31 Well Log Performed
1992-05-31 Well Mode changed to Drilled and Cased
1992-06-01 Production Casing Operation Performed
1992-06-01 Rig Released
1992-06-05 Perforation Treatment Performed - Jet Perforation
1992-06-05 Well Log Performed
1992-06-08 Well Began Production
1992-06-08 Well Fluid changed to Crude Oil
1992-06-08 Well Mode changed to Pumping
1993-06-22 Perforation Treatment Performed - Selective Jet Perforations
1993-06-22 Well Log Performed
1998-03-31 Well Fluid changed to Crude Oil
1998-03-31 Well Mode changed to Suspended
2009-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-29 Plug Back Performed
2009-01-29 Well Fluid changed to Crude Oil
2009-01-29 Well Mode changed to Abandoned Zone
2017-02-23 Well Abandoned
2017-02-23 Well Fluid changed to Crude Oil
2017-02-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-06-05 Perforation 928.50 932.00 13
1993-06-22 Selective Jet Perforations 930.30 930.50 1
1993-06-22 Selective Jet Perforations 931.00 931.00 1
2009-01-29 Packing Device Capped w/Cement 910.90 918.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 4934 0.0 0.0 0.0
1993 7590 0.0 0.0 0.0
1994 7776 0.0 0.0 0.0
1995 2010 0.0 0.0 0.0
1996 8238 0.0 0.0 0.0
1997 8275 0.0 0.0 0.0
1998 1750 0.0 0.0 0.0

For data sources see[5]

References