If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0374041902020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 02/02-19-037-04W4/0 | |
| Location Alias: 02/02-19-37-04 W4M | |
| Location Alias 2: 02/02-19-037-04 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 037 | |
| Meridian: 4 | |
| Range: 04 | |
| Section: 19 | |
| County/Municipality: Special Areas No. 4 | |
| Well Name: SURGE ENERGY 102 PROVOST 2-19-37-4 | |
| Operator Name: Surge Energy Inc. | |
| License Number: 0449058 | |
| License Date: 2012-10-09 | |
| License Status: Issued | |
| Spud Date: 2012-10-25 | |
| Final Drill Date: 2012-10-29 | |
| Well Total Depth: 1559.00 m | |
| Surface Hole Latitude: 52.195028 | |
| Surface Hole Longitude: -110.559862 |
| Date | Event |
|---|---|
| 2012-10-09 | Obtained License |
| 2012-10-25 | Well Log Performed |
| 2012-10-26 | Surface Casing Operation Performed |
| 2012-10-27 | Direction Drilling Operation Performed - Deviate |
| 2012-10-27 | Direction Drilling Operation Performed - Horizontal |
| 2012-10-28 | Intermediate Casing Operation Performed |
| 2012-10-28 | Well Log Performed |
| 2012-10-29 | Finished Drilling |
| 2012-10-29 | Well Mode changed to Drilled and Cased |
| 2012-10-30 | Liner Casing Operation Performed |
| 2012-10-30 | Perforation Treatment Performed - Slotted Liner or Casing |
| 2012-10-30 | Well Log Performed |
| 2012-10-31 | Rig Released |
| 2012-11-02 | Well Log Performed |
| 2012-11-09 | Well Began Production |
| 2012-11-09 | Well Fluid changed to Crude Oil |
| 2012-11-09 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-10-25 | Chinook Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-10-27 | 624.60 | Deviate (5 - 79 degrees) |
| 2012-10-27 | 950.10 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-10-30 | Slotted Liner | 977.60 | 1559.00 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 1143 | 0.0 | 0.0 | 0.0 |
| 2013 | 8601 | 0.0 | 0.0 | 0.0 |
| 2014 | 8666 | 0.0 | 0.0 | 0.0 |
| 2015 | 8573 | 0.0 | 0.0 | 0.0 |
| 2016 | 8439 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8615 | 0.0 | 0.0 | 0.0 |
| 2019 | 8677 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-10-31 | No Incident Encountered | 0.00 | 0.00 |
| 2012-11-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]