X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374032108B00

Well Details

Well ID: 0374032108B00
Loading map...
Location: B0/08-21-037-03W4/0
Location Alias: B0/08-21-37-03 W4M
Location Alias 2: B0/08-21-037-03 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 03
Section: 21
County/Municipality: Special Areas No. 4
Well Name: WLEC 1B0 PROVOST 8-21-37-3
Operator Name: West Lake Energy Corp.
License Number: 0140856
License Date: 1989-09-08
License Status: Suspension
Spud Date: 1989-10-04
Final Drill Date: 1989-10-07
Well Total Depth: 885.00 m
Surface Hole Latitude: 52.191969
Surface Hole Longitude: -110.365161

For data sources see[1][2]

Well History

Date Event
1989-09-08 Obtained License
1989-10-05 Direction Drilling Operation Performed - Deviate
1989-10-05 Surface Casing Operation Performed
1989-10-07 Finished Drilling
1989-10-07 Well Log Performed
1989-10-07 Well Mode changed to Drilled and Cased
1989-10-08 Production Casing Operation Performed
1989-10-08 Rig Released
1989-10-17 Well Log Performed
1989-10-24 Well Log Performed
1989-10-25 Perforation Treatment Performed - Abrasa-Jet Perforation
1989-11-15 Well Began Production
1989-11-15 Well Fluid changed to Crude Oil
1989-11-15 Well Mode changed to Pumping
1989-11-24 Perforation Treatment Performed - Cement Squeeze
1989-11-24 Perforation Treatment Performed - Jet Perforation
1989-11-24 Well Log Performed
1990-03-04 Perforation Treatment Performed - Jet Perforation
1990-03-04 Well Log Performed
2003-11-10 Well Fluid changed to Crude Oil
2003-11-10 Well Mode changed to Suspended
2009-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-31 Plug Back Performed
2009-07-31 Well Fluid changed to Crude Oil
2009-07-31 Well Log Performed
2009-07-31 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-10-05 446.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-10-25 Hydra Jet Perforation 844.50 847.20 0
1989-11-24 Perforation 850.50 851.00 13
1989-11-24 Cement Squeeze 850.50 851.00 0
1990-03-04 Perforation 844.20 845.20 13
2009-07-31 Packing Device Capped w/Cement 827.00 835.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 784 0.0 0.0 0.0
1990 7245 0.0 0.0 0.0
1991 6807 0.0 0.0 0.0
1992 524 0.0 0.0 0.0
1998 144 0.0 0.0 0.0

For data sources see[6]

References