If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0374032108B00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.191969,"lon":-110.365161,"icon":""}]} |
Location: B0/08-21-037-03W4/0 | |
Location Alias: B0/08-21-37-03 W4M | |
Location Alias 2: B0/08-21-037-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 4 | |
Range: 03 | |
Section: 21 | |
County/Municipality: Special Areas No. 4 | |
Well Name: WLEC 1B0 PROVOST 8-21-37-3 | |
Operator Name: West Lake Energy Corp. | |
License Number: 0140856 | |
License Date: 1989-09-08 | |
License Status: Suspension | |
Spud Date: 1989-10-04 | |
Final Drill Date: 1989-10-07 | |
Well Total Depth: 885.00 m | |
Surface Hole Latitude: 52.191969 | |
Surface Hole Longitude: -110.365161 |
Date | Event |
---|---|
1989-09-08 | Obtained License |
1989-10-05 | Direction Drilling Operation Performed - Deviate |
1989-10-05 | Surface Casing Operation Performed |
1989-10-07 | Finished Drilling |
1989-10-07 | Well Log Performed |
1989-10-07 | Well Mode changed to Drilled and Cased |
1989-10-08 | Production Casing Operation Performed |
1989-10-08 | Rig Released |
1989-10-17 | Well Log Performed |
1989-10-24 | Well Log Performed |
1989-10-25 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1989-11-15 | Well Began Production |
1989-11-15 | Well Fluid changed to Crude Oil |
1989-11-15 | Well Mode changed to Pumping |
1989-11-24 | Perforation Treatment Performed - Cement Squeeze |
1989-11-24 | Perforation Treatment Performed - Jet Perforation |
1989-11-24 | Well Log Performed |
1990-03-04 | Perforation Treatment Performed - Jet Perforation |
1990-03-04 | Well Log Performed |
2003-11-10 | Well Fluid changed to Crude Oil |
2003-11-10 | Well Mode changed to Suspended |
2009-07-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-07-31 | Plug Back Performed |
2009-07-31 | Well Fluid changed to Crude Oil |
2009-07-31 | Well Log Performed |
2009-07-31 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1989-10-05 | 446.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-10-25 | Hydra Jet Perforation | 844.50 | 847.20 | 0 |
1989-11-24 | Perforation | 850.50 | 851.00 | 13 |
1989-11-24 | Cement Squeeze | 850.50 | 851.00 | 0 |
1990-03-04 | Perforation | 844.20 | 845.20 | 13 |
2009-07-31 | Packing Device Capped w/Cement | 827.00 | 835.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 784 | 0.0 | 0.0 | 0.0 |
1990 | 7245 | 0.0 | 0.0 | 0.0 |
1991 | 6807 | 0.0 | 0.0 | 0.0 |
1992 | 524 | 0.0 | 0.0 | 0.0 |
1998 | 144 | 0.0 | 0.0 | 0.0 |
For data sources see[6]