If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0374011915A00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.198159,"lon":-110.131009,"icon":""}]} |
Location: A0/15-19-037-01W4/0 | |
Location Alias: A0/15-19-37-01 W4M | |
Location Alias 2: A0/15-19-037-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 037 | |
Meridian: 4 | |
Range: 01 | |
Section: 19 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: Caltex_Res PROVOST 15-19-37-1 | |
Operator Name: Caltex Resources Ltd. | |
License Number: 0069123 | |
License Date: 1978-04-12 | |
License Status: Suspension | |
Spud Date: 1978-06-29 | |
Final Drill Date: 1978-07-01 | |
Well Total Depth: 838.20 m | |
Surface Hole Latitude: 52.198159 | |
Surface Hole Longitude: -110.131009 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-04-12 | Obtained License |
1978-07-01 | Finished Drilling |
1978-07-01 | Well Mode changed to Drilled and Cased |
1978-07-03 | Production Casing Operation Performed |
1978-08-02 | Perforation Treatment Performed - Jet Perforation |
1978-08-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-08-03 | Perforation Treatment Performed - Cement Squeeze |
1978-08-09 | Perforation Treatment Performed - Jet Perforation |
1978-08-30 | Well Began Production |
1978-08-30 | Well Fluid changed to Crude Oil |
1978-08-30 | Well Mode changed to Pumping |
1978-10-29 | Well Fluid changed to Crude Oil |
1978-10-29 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-08-02 | Perforation | 825.00 | 825.70 | 13 |
1978-08-03 | Acid Treatment | 825.00 | 825.70 | 0 |
1978-08-03 | Cement Squeeze | 825.00 | 825.70 | 0 |
1978-08-09 | Perforation | 818.00 | 821.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 1282 | 0.0 | 0.0 | 0.0 |
1979 | 114 | 0.0 | 0.0 | 0.0 |
For data sources see[5]