X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374011412020

Well Details

Well ID: 0374011412020
Loading map...
Location: 02/12-14-037-01W4/0
Location Alias: 02/12-14-37-01 W4M
Location Alias 2: 02/12-14-037-01 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 01
Section: 14
County/Municipality: Municipal District of Provost No. 52
Well Name: Caltex_Res PROVOST 12-14-37-1
Operator Name: Caltex Resources Ltd.
License Number: 0187182
License Date: 1996-04-11
License Status: Suspension
Spud Date: 1996-04-23
Final Drill Date: 1996-04-28
Well Total Depth: 1202.00 m
Surface Hole Latitude: 52.178954
Surface Hole Longitude: -110.043221

For data sources see[1][2]

Well History

Date Event
1996-04-11 Obtained License
1996-04-24 Kick Occurred
1996-04-24 Surface Casing Operation Performed
1996-04-25 Direction Drilling Operation Performed - Horizontal
1996-04-27 Intermediate Casing Operation Performed
1996-04-28 Finished Drilling
1996-04-28 Liner Casing Operation Performed
1996-04-28 Perforation Treatment Performed - Slotted Liner or Casing
1996-04-28 Well Log Performed
1996-04-28 Well Mode changed to Drilled and Cased
1996-04-29 Rig Released
1996-05-02 Well Log Performed
1996-05-04 Well Began Production
1996-05-04 Well Fluid changed to Crude Oil
1996-05-04 Well Mode changed to Pumping
2002-04-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-04-09 Plug Back Performed
2002-04-09 Well Fluid changed to Crude Oil
2002-04-09 Well Mode changed to Abandoned Zone
2002-04-10 Perforation Treatment Performed - Jet Perforation
2019-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-06-23 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-04-25 595.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-04-28 Slotted Liner 872.00 1202.00 0
2002-04-09 Packing Device Capped w/Cement 781.30 838.00 0
2002-04-10 Perforation 763.50 768.00 34
2019-06-23 Packing Device Capped w/Cement 742.00 755.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 5460 0.0 0.0 0.0
1997 6548 0.0 0.0 0.0
1998 1788 0.0 0.0 0.0
1999 1368 0.0 0.0 0.0
2000 7319 0.0 0.0 0.0
2001 3369 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-04-24 Kick 171.30 171.30
1996-04-24 Kick 188.00 188.00
2019-06-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References