If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0365092812000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.125308,"lon":-115.23473,"icon":""}]} |
Location: 00/12-28-036-09W5/0 | |
Location Alias: 00/12-28-36-09 W5M | |
Location Alias 2: 00/12-28-036-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 5 | |
Range: 09 | |
Section: 28 | |
County/Municipality: Clearwater County | |
Well Name: CRESTAR ET AL RICINUS 12-28-36-9 | |
Operator Name: TAQA North Ltd. | |
License Number: 0066728 | |
License Date: 1977-11-14 | |
License Status: Suspension | |
Spud Date: 1977-11-23 | |
Final Drill Date: 1977-12-27 | |
Well Total Depth: 2841.00 m | |
Surface Hole Latitude: 52.125308 | |
Surface Hole Longitude: -115.234730 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-11-14 | Obtained License |
1977-12-27 | Finished Drilling |
1977-12-27 | Production Casing Operation Performed |
1978-01-17 | Perforation Treatment Performed - Open-Hole Completion |
1978-01-28 | Perforation Treatment Performed - Fractured |
1978-06-01 | Well Mode changed to Drilled and Cased |
1979-08-02 | Perforation Treatment Performed - Open-Hole Completion |
1980-06-02 | Well Began Production |
1980-06-02 | Well Fluid changed to Crude Oil |
1980-06-02 | Well Mode changed to Flowing |
1981-08-26 | Well Fluid changed to Crude Oil |
1981-08-26 | Well Mode changed to Suspended |
1990-07-17 | Well Fluid changed to Crude Oil |
1990-07-17 | Well Mode changed to Pumping |
1994-07-19 | Perforation Treatment Performed - Jet Perforation |
1994-07-19 | Well Log Performed |
1994-07-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-10-01 | Well Fluid changed to Crude Oil |
1996-10-01 | Well Mode changed to Suspended |
2009-11-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-11-12 | Plug Back Performed |
2009-11-12 | Well Fluid changed to Crude Oil |
2009-11-12 | Well Log Performed |
2009-11-12 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-01-17 | Open Hole/Barefoot Completion | 2782.20 | 2794.70 | 0 |
1978-01-28 | Fracture | 2782.20 | 2794.70 | 0 |
1979-08-02 | Open Hole/Barefoot Completion | 2782.20 | 2841.00 | 0 |
1994-07-19 | Perforation | 2785.00 | 2793.00 | 13 |
1994-07-20 | Acid Treatment | 2782.20 | 2841.00 | 0 |
2009-11-12 | Packing Device Capped w/Cement | 2767.00 | 2775.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 16 | 0.0 | 0.0 | 0.0 |
1990 | 1800 | 0.0 | 0.0 | 0.0 |
1991 | 1344 | 0.0 | 0.0 | 0.0 |
For data sources see[5]