X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365092809002

Well Details

Well ID: 0365092809002
Loading map...
Location: 00/09-28-036-09W5/2
Location Alias: 00/09-28-36-09 W5M
Location Alias 2: 00/09-28-036-09 W5/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 09
Section: 28
County/Municipality: Clearwater County
Well Name: CRESTAR ET AL RICINUS 9-28-36-9
Operator Name: TAQA North Ltd.
License Number: 0068041
License Date: 1978-01-23
License Status: Suspension
Spud Date: 1978-02-23
Final Drill Date: 1978-04-14
Well Total Depth: 2781.60 m
Surface Hole Latitude: 52.124738
Surface Hole Longitude: -115.218037

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-01-23 Obtained License
1978-04-14 Finished Drilling
1978-04-14 Well Mode changed to Drilled and Cased
1978-04-18 Production Casing Operation Performed
1978-04-21 Perforation Treatment Performed - Open-Hole Completion
1978-09-11 Perforation Treatment Performed - Fractured
1988-06-09 Perforation Treatment Performed - Cement Plug
1990-12-13 Perforation Treatment Performed - Open-Hole Completion
1994-08-04 Well Log Performed
1995-02-17 Well Log Performed
1995-02-18 Well Log Performed
2001-08-01 Well Fluid changed to Crude Oil
2001-08-01 Well Mode changed to Potential
2001-08-02 Well Began Production
2001-08-02 Well Fluid changed to Crude Oil
2001-08-02 Well Mode changed to Pumping
2001-08-15 Well Fluid changed to Crude Oil
2001-08-15 Well Mode changed to Suspended
2012-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-04-21 Open Hole/Barefoot Completion 2751.10 2781.60 0
1978-09-11 Fracture 2751.10 2781.60 0
1988-06-09 Cement Plug 2760.00 2781.60 0
1990-12-13 Open Hole/Barefoot Completion 2751.10 2776.40 0
2012-11-16 Packing Device Capped w/Cement 2732.00 2740.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1464 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References