X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365092209000

Well Details

Well ID: 0365092209000
Loading map...
Location: 00/09-22-036-09W5/0
Location Alias: 00/09-22-36-09 W5M
Location Alias 2: 00/09-22-036-09 W5/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 09
Section: 22
County/Municipality: Clearwater County
Well Name: BEC RICINUS 9-22-36-9
Operator Name: Bonavista Energy Corporation
License Number: 0036053
License Date: 1969-03-19
License Status: Issued
Spud Date: 1969-03-21
Final Drill Date: 1969-04-23
Well Total Depth: 2773.70 m
Surface Hole Latitude: 52.111493
Surface Hole Longitude: -115.195781

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-03-19 Obtained License
1969-04-20 Drill Stem Test Performed
1969-04-23 Finished Drilling
1969-04-25 Production Casing Operation Performed
1969-04-26 Well Mode changed to Drilled and Cased
1971-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-09-04 Perforation Treatment Performed - Jet Perforation
1971-09-05 Perforation Treatment Performed - Fractured
1971-11-30 Perforation Treatment Performed - Chemical Squeeze
1973-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-03-10 Perforation Treatment Performed - Fractured
1973-09-09 Well Began Production
1973-09-09 Well Fluid changed to Gas
1973-09-09 Well Mode changed to Flowing
1990-03-05 Perforation Treatment Performed - Jet Perforation
1990-03-09 Perforation Treatment Performed - Fractured
2003-10-01 Well Fluid changed to Gas
2003-10-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-09-04 Perforation 2684.70 2688.30 7
1971-09-04 Acid Treatment 2684.70 2688.30 0
1971-09-05 Fracture 2684.70 2688.30 0
1971-11-30 Chemical Squeeze 2684.70 2688.30 0
1973-03-10 Acid Treatment 2684.70 2688.30 0
1973-03-10 Fracture 2684.70 2688.30 0
1990-03-05 Perforation 2677.80 2690.00 14
1990-03-09 Fracture 2677.80 2690.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 196 0.0 0.0 0.0
1973 1706 0.0 0.0 0.0
1974 5125 0.0 0.0 0.0
1975 2221 0.0 0.0 0.0
1976 2580 0.0 0.0 0.0
1977 5727 0.0 0.0 0.0
1978 6786 0.0 0.0 0.0
1979 8295 0.0 0.0 0.0
1980 8288 0.0 0.0 0.0
1981 8070 0.0 0.0 0.0
1982 8269 0.0 0.0 0.0
1983 8286 0.0 0.0 0.0
1984 8239 0.0 0.0 0.0
1985 8167 0.0 0.0 0.0
1986 8228 0.0 0.0 0.0
1987 4878 0.0 0.0 0.0
1989 7371 0.0 0.0 0.0
1990 6270 0.0 0.0 0.0
1991 6920 0.0 0.0 0.0
1992 8022 0.0 0.0 0.0
1993 8476 0.0 0.0 0.0
1994 8448 0.0 0.0 0.0
1995 8375 0.0 0.0 0.0
1996 8677 0.0 0.0 0.0
1997 8743 0.0 0.0 0.0
1998 6914 0.0 0.0 0.0
1999 512 0.0 0.0 0.0
2000 82 0.0 0.0 0.0
2001 1537 0.0 0.0 0.0
2002 7864 0.0 0.0 0.0
2003 7875 0.0 0.0 0.0
2004 8495 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8711 0.0 0.0 0.0
2007 8711 0.0 0.0 0.0
2008 8579 0.0 0.0 0.0
2009 7439 0.0 0.0 0.0
2010 8533 0.0 0.0 0.0
2011 8551 0.0 0.0 0.0
2012 7358 0.0 0.0 0.0
2013 7347 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8015 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 6775 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[5]

References