X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365061406000

Well Details

Well ID: 0365061406000
Loading map...
Location: 00/06-14-036-06W5/0
Location Alias: 00/06-14-36-06 W5M
Location Alias 2: 00/06-14-036-06 W5/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 06
Section: 14
County/Municipality: Clearwater County
Well Name: CVE CAROL 6-14-36-6
Operator Name: Cenovus Energy Inc.
License Number: 0098388
License Date: 1982-11-01
License Status: RecCertified
Spud Date: 1982-11-06
Final Drill Date: 1982-11-29
Well Total Depth: 2822.00 m
Surface Hole Latitude: 52.092833
Surface Hole Longitude: -114.752437

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-11-01 Obtained License
1982-11-06 Lost Circulation Occurred
1982-11-29 Finished Drilling
1982-11-30 Drill Stem Test Performed
1982-12-02 Drill Stem Test Performed
1982-12-04 Drill Stem Test Performed
1982-12-05 Drill Stem Test Performed
1982-12-07 Production Casing Operation Performed
1983-02-21 Perforation Treatment Performed - Jet Perforation
1983-02-22 Perforation Treatment Performed - Jet Perforation
1983-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-02-23 Perforation Treatment Performed - Jet Perforation
1983-02-25 Perforation Treatment Performed - Fractured
1983-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-03-06 Perforation Treatment Performed - Jet Perforation
1983-03-07 Perforation Treatment Performed - Fractured
1983-03-18 Well Mode changed to Drilled and Cased
1983-11-26 Well Log Performed
1983-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-11-28 Well Log Performed
1983-11-29 Perforation Treatment Performed - Jet Perforation
1983-12-01 Perforation Treatment Performed - Fractured
1996-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-09 Plug Back Performed
1996-07-09 Well Mode changed to Abandoned Zone
1996-07-10 Perforation Treatment Performed - Jet Perforation
1996-07-10 Well Log Performed
1996-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-11 Perforation Treatment Performed - Cement Squeeze
1996-07-11 Perforation Treatment Performed - Jet Perforation
1996-07-11 Plug Back Performed
1996-07-13 Perforation Treatment Performed - Cement Squeeze
1996-07-13 Plug Back Performed
1996-07-15 Perforation Treatment Performed - Jet Perforation
1996-07-16 Perforation Treatment Performed - Fractured
1996-07-18 Well Log Performed
1996-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-13 Perforation Treatment Performed - Jet Perforation
1996-08-13 Plug Back Performed
1996-08-13 Well Log Performed
1996-08-14 Perforation Treatment Performed - Cement Plug
1996-08-14 Perforation Treatment Performed - Remedial Casing
1996-08-14 Well Log Performed
1996-08-15 Well Abandoned
1996-08-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-02-21 Perforation 2742.00 2747.00 13
1983-03-07 Fracture 2696.50 2700.00 0
1983-11-27 Packing Device Capped w/Cement 2686.00 2694.00 0
1983-11-29 Perforation 2484.00 2488.50 13
1983-12-01 Fracture 2484.00 2488.50 0
1996-07-09 Packing Device Capped w/Cement 2467.00 2475.00 0
1996-07-10 Perforation 1650.00 1651.00 13
1996-07-10 Perforation 1703.00 1704.00 13
1996-07-11 Cement Squeeze 1703.00 1704.00 0
1996-07-11 Packing Device Capped w/Cement 1692.00 1701.00 0
1996-07-11 Perforation 1667.00 1668.00 13
1983-02-22 Perforation 2724.00 2725.00 13
1996-07-11 Perforation 1684.00 1685.00 13
1996-07-13 Cement Squeeze 1667.00 1685.00 0
1996-07-15 Perforation 1677.00 1681.00 16
1996-07-16 Fracture 1677.00 1681.00 0
1996-08-13 Packing Device Capped w/Cement 1649.00 1665.00 0
1996-08-13 Perforation 592.00 593.00 13
1996-08-14 Remedial Casing Cementing 592.00 593.00 0
1996-08-14 Cement Plug 562.00 593.00 0
1983-02-22 Perforation 2727.50 2728.50 13
1983-02-22 Perforation 2731.50 2733.50 13
1983-02-23 Packing Device Capped w/Cement 2716.00 2720.00 0
1983-02-23 Perforation 2713.00 2714.00 13
1983-02-25 Fracture 2713.00 2714.00 0
1983-03-05 Packing Device Capped w/Cement 2708.00 2712.00 0
1983-03-06 Perforation 2696.50 2700.00 13

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-11-06 Lost Circulation 165.00 177.00

For data sources see[5]

References