X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365033004000

Well Details

Well ID: 0365033004000
Loading map...
Location: 00/04-30-036-03W5/0
Location Alias: 00/04-30-36-03 W5M
Location Alias 2: 00/04-30-036-03 W5/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 03
Section: 30
County/Municipality: Red Deer County
Well Name: HB LANAWAY 4-30-36-3
Operator Name: BP Canada Energy Group ULC
License Number: 0020786
License Date: 1961-05-24
License Status: RecCertified
Spud Date: 1961-05-28
Final Drill Date: 1961-06-09
Well Total Depth: 1837.90 m
Surface Hole Latitude: 52.116898
Surface Hole Longitude: -114.427682

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-05-24 Obtained License
1961-06-09 Finished Drilling
1961-06-09 Production Casing Operation Performed
1961-06-09 Well Mode changed to Drilled and Cased
1961-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-11 Perforation Treatment Performed - Fractured
1961-06-11 Perforation Treatment Performed - Jet Perforation
1961-07-08 Well Began Production
1961-07-08 Well Fluid changed to Crude Oil
1961-07-08 Well Mode changed to Flowing
1961-09-02 Well Fluid changed to Crude Oil
1961-09-02 Well Mode changed to Pumping
1972-09-25 Well Fluid changed to Crude Oil
1972-09-25 Well Mode changed to Suspended
1980-07-18 Well Fluid changed to Crude Oil
1980-07-18 Well Mode changed to Pumping
1981-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-12-21 Perforation Treatment Performed - Jet Perforation
1981-12-21 Well Abandoned
1981-12-21 Well Fluid changed to Crude Oil
1981-12-21 Well Mode changed to Abandoned
1981-12-22 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-06-11 Perforation 1809.00 1816.30 13
1961-06-11 Acid Treatment 1809.00 1816.30 0
1961-06-11 Fracture 1809.00 1816.30 0
1981-12-21 Packing Device Capped w/Cement 1794.00 1802.00 0
1981-12-21 Perforation 680.00 681.00 13
1981-12-22 Cement Squeeze 680.00 681.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2068 0.0 0.0 0.0
1968 1700 0.0 0.0 0.0
1969 1248 0.0 0.0 0.0
1970 3306 0.0 0.0 0.0
1971 1160 0.0 0.0 0.0
1980 3728 0.0 0.0 0.0
1981 8111 0.0 0.0 0.0

For data sources see[5]

References