If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0365032803003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.119274,"lon":-114.373654,"icon":""}]} |
| Location: 00/03-28-036-03W5/3 | |
| Location Alias: 00/03-28-36-03 W5M | |
| Location Alias 2: 00/03-28-036-03 W5/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 28 | |
| County/Municipality: Red Deer County | |
| Well Name: BIG HORN HZ LANAWAY 3-28-36-3 | |
| Operator Name: Bonavista Energy Corporation | |
| License Number: 0233403 | |
| License Date: 2000-02-09 | |
| License Status: Suspension | |
| Spud Date: 2000-10-31 | |
| Final Drill Date: 2000-12-18 | |
| Well Total Depth: 2402.00 m | |
| Surface Hole Latitude: 52.119274 | |
| Surface Hole Longitude: -114.373654 |
| Date | Event |
|---|---|
| 2000-02-09 | Obtained License |
| 2000-10-30 | Direction Drilling Operation Performed - Deviate |
| 2000-12-17 | Direction Drilling Operation Performed - Horizontal |
| 2000-12-18 | Finished Drilling |
| 2000-12-18 | Perforation Treatment Performed - Open-Hole Completion |
| 2000-12-18 | Well Structure changed to Drain |
| 2000-12-23 | Rig Released |
| 2001-03-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-03-03 | Plug Back Performed |
| 2001-03-03 | Well Mode changed to Abandoned Zone |
| 2001-03-03 | Well Structure changed to Drain |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2000-10-30 | 2238.00 | Deviate (5 - 79 degrees) |
| 2000-12-17 | 2334.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2000-12-18 | Open Hole/Barefoot Completion | 2334.00 | 2402.00 | 0 |
| 2001-03-03 | Packing Device Capped w/Cement | 2182.00 | 2190.00 | 0 |
For data sources see[5]