If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0365020506022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.062755,"lon":-114.257299,"icon":""}]} |
Location: 02/06-05-036-02W5/2 | |
Location Alias: 02/06-05-36-02 W5M | |
Location Alias 2: 02/06-05-036-02 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 5 | |
Range: 02 | |
Section: 05 | |
County/Municipality: Red Deer County | |
Well Name: HARVEST ET AL 102 MARKER 6-5-36-2 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0312006 | |
License Date: 2004-07-20 | |
License Status: Suspension | |
Spud Date: 2004-08-11 | |
Final Drill Date: 2004-08-14 | |
Well Total Depth: 921.00 m | |
Surface Hole Latitude: 52.062755 | |
Surface Hole Longitude: -114.257299 |
Date | Event |
---|---|
2004-07-20 | Obtained License |
2004-08-12 | Surface Casing Operation Performed |
2004-08-14 | Finished Drilling |
2004-08-14 | Production Casing Operation Performed |
2004-08-14 | Rig Released |
2004-08-14 | Well Mode changed to Drilled and Cased |
2004-08-29 | Well Log Performed |
2004-09-11 | Perforation Treatment Performed - Jet Perforation |
2004-09-11 | Well Log Performed |
2004-09-16 | Perforation Treatment Performed - Jet Perforation |
2004-09-16 | Well Log Performed |
2004-09-20 | Perforation Treatment Performed - Fractured |
2004-09-23 | Perforation Treatment Performed - Jet Perforation |
2004-09-24 | Perforation Treatment Performed - Fractured |
2004-09-25 | Well Fluid changed to Gas |
2004-09-25 | Well Mode changed to Testing |
2004-10-27 | Well Began Production |
2004-10-27 | Well Fluid changed to Gas |
2004-10-27 | Well Mode changed to Flowing |
2005-05-19 | Perforation Treatment Performed - Jet Perforation |
2005-05-19 | Perforation Treatment Performed - Remedial Casing |
2005-05-19 | Well Log Performed |
2005-05-20 | Perforation Treatment Performed - Jet Perforation |
2005-05-20 | Perforation Treatment Performed - Remedial Casing |
2005-05-20 | Well Log Performed |
2005-05-24 | Perforation Treatment Performed - Jet Perforation |
2005-05-24 | Perforation Treatment Performed - Remedial Casing |
2005-05-31 | Well Log Performed |
2005-06-04 | Well Log Performed |
2005-07-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-09-11 | Perforation | 886.00 | 890.00 | 17 |
2004-09-23 | Perforation | 429.50 | 431.00 | 17 |
2004-09-23 | Perforation | 426.50 | 427.50 | 17 |
2004-09-23 | Perforation | 421.50 | 424.00 | 17 |
2004-09-24 | Fracture | 466.00 | 469.00 | 0 |
2004-09-24 | Fracture | 460.00 | 463.00 | 0 |
2004-09-24 | Fracture | 433.00 | 435.50 | 0 |
2004-09-24 | Fracture | 429.50 | 431.00 | 0 |
2004-09-24 | Fracture | 426.50 | 427.50 | 0 |
2004-09-24 | Fracture | 421.50 | 424.00 | 0 |
2005-05-19 | Perforation | 302.00 | 303.00 | 17 |
2004-09-16 | Perforation | 881.00 | 883.50 | 17 |
2005-05-19 | Remedial Casing Cementing | 302.00 | 303.00 | 0 |
2005-05-20 | Perforation | 246.00 | 247.00 | 17 |
2005-05-20 | Perforation | 134.00 | 135.00 | 17 |
2005-05-20 | Remedial Casing Cementing | 134.00 | 247.00 | 0 |
2005-05-24 | Perforation | 155.00 | 156.00 | 17 |
2005-05-24 | Remedial Casing Cementing | 155.00 | 156.00 | 0 |
2004-09-16 | Perforation | 842.30 | 844.70 | 17 |
2004-09-20 | Fracture | 886.00 | 890.00 | 0 |
2004-09-20 | Fracture | 881.00 | 883.50 | 0 |
2004-09-20 | Fracture | 842.30 | 844.70 | 0 |
2004-09-23 | Perforation | 466.00 | 469.00 | 17 |
2004-09-23 | Perforation | 460.00 | 463.00 | 17 |
2004-09-23 | Perforation | 433.00 | 435.50 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 1366 | 0.0 | 0.0 | 0.0 |
2005 | 3132 | 0.0 | 0.0 | 0.0 |
For data sources see[5]