If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0364271706000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.090836,"lon":-113.829172,"icon":""}]} |
| Location: 00/06-17-036-27W4/0 | |
| Location Alias: 00/06-17-36-27 W4M | |
| Location Alias 2: 00/06-17-036-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 17 | |
| County/Municipality: Red Deer County | |
| Well Name: SHININGBANK ET AL PENHOLD 6-17-36-27 | |
| Operator Name: TAQA North Ltd. | |
| License Number: 0117153 | |
| License Date: 1985-08-22 | |
| License Status: Suspension | |
| Spud Date: 1985-09-18 | |
| Final Drill Date: 1985-10-11 | |
| Well Total Depth: 2440.00 m | |
| Surface Hole Latitude: 52.090836 | |
| Surface Hole Longitude: -113.829172 |
| Date | Event |
|---|---|
| 1985-08-22 | Obtained License |
| 1985-09-19 | Surface Casing Operation Performed |
| 1985-09-27 | Drill Stem Test Performed |
| 1985-09-29 | Drill Stem Test Performed |
| 1985-10-09 | Drill Stem Test Performed |
| 1985-10-11 | Finished Drilling |
| 1985-10-11 | Well Mode changed to Drilled and Cased |
| 1985-10-12 | Well Log Performed |
| 1985-10-13 | Well Log Performed |
| 1985-10-15 | Production Casing Operation Performed |
| 1985-10-15 | Rig Released |
| 1985-12-04 | Well Log Performed |
| 1985-12-08 | Well Log Performed |
| 1985-12-09 | Perforation Treatment Performed - Jet Perforation |
| 1985-12-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-12-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1985-12-15 | Plug Back Performed |
| 1985-12-16 | Perforation Treatment Performed - Jet Perforation |
| 1985-12-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-12-22 | Well Began Production |
| 1985-12-22 | Well Fluid changed to Crude Oil |
| 1985-12-22 | Well Mode changed to Flowing |
| 1986-01-13 | Well Fluid changed to Crude Oil |
| 1986-01-13 | Well Mode changed to Suspended |
| 1986-11-11 | Well Fluid changed to Crude Oil |
| 1986-11-11 | Well Mode changed to Pumping |
| 1987-10-23 | Perforation Treatment Performed - Jet Perforation |
| 1987-10-23 | Well Log Performed |
| 1987-10-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1987-10-25 | Perforation Treatment Performed - Cement Squeeze |
| 1987-10-27 | Well Log Performed |
| 1987-10-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-01-22 | Well Log Performed |
| 1988-01-23 | Perforation Treatment Performed - Jet Perforation |
| 1988-01-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1989-05-29 | Well Fluid changed to Crude Oil |
| 1989-05-29 | Well Mode changed to Suspended |
| 1990-03-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1990-03-04 | Plug Back Performed |
| 1990-03-04 | Well Fluid changed to Crude Oil |
| 1990-03-04 | Well Log Performed |
| 1990-03-04 | Well Mode changed to Abandoned Zone |
| 1990-03-06 | Well Log Performed |
| 1990-03-07 | Perforation Treatment Performed - Jet Perforation |
| 1990-03-08 | Perforation Treatment Performed - Fractured |
| 2012-10-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-10-09 | Plug Back Performed |
| 2012-10-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-10-13 | Plug Back Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1985-12-09 | Perforation | 2391.00 | 2394.50 | 13 |
| 1987-10-30 | Acid Treatment | 2303.00 | 2308.60 | 0 |
| 1988-01-23 | Perforation | 2303.00 | 2308.60 | 17 |
| 1988-01-24 | Acid Treatment | 2303.00 | 2308.60 | 0 |
| 1990-03-04 | Packing Device Capped w/Cement | 2256.00 | 2264.00 | 0 |
| 1990-03-07 | Perforation | 1666.00 | 1669.00 | 13 |
| 1990-03-08 | Fracture | 1666.00 | 1669.00 | 0 |
| 2012-10-09 | Packing Device Capped w/Cement | 2196.00 | 2256.00 | 0 |
| 2012-10-13 | Packing Device Capped w/Cement | 1652.00 | 1661.00 | 0 |
| 1985-12-12 | Acid Treatment | 2391.00 | 2394.50 | 0 |
| 1985-12-15 | Packing Device Capped w/Cement | 2377.00 | 2385.00 | 0 |
| 1985-12-16 | Perforation | 2303.00 | 2308.60 | 0 |
| 1985-12-22 | Acid Treatment | 2303.00 | 2308.60 | 0 |
| 1987-10-23 | Perforation | 2338.00 | 2340.00 | 13 |
| 1987-10-23 | Perforation | 2320.00 | 2321.00 | 13 |
| 1987-10-24 | Acid Treatment | 2320.00 | 2340.00 | 0 |
| 1987-10-25 | Cement Squeeze | 2320.00 | 2340.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1985 | 177 | 0.0 | 0.0 | 0.0 |
| 1986 | 978 | 0.0 | 0.0 | 0.0 |
| 1987 | 4031 | 0.0 | 0.0 | 0.0 |
| 1988 | 7380 | 0.0 | 0.0 | 0.0 |
| 1989 | 3468 | 0.0 | 0.0 | 0.0 |
| 1990 | 72 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-10-13 | No Incident Encountered | 0.00 | 0.00 |
| 2012-10-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]