X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364263312000

Well Details

Well ID: 0364263312000
Loading map...
Location: 00/12-33-036-26W4/0
Location Alias: 00/12-33-36-26 W4M
Location Alias 2: 00/12-33-036-26 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 26
Section: 33
County/Municipality: Red Deer County
Well Name: Vantage JOFFRE 12-33-36-26
Operator Name: Vantage Point Resources Inc.
License Number: 0172601
License Date: 1994-11-16
License Status: Issued
Spud Date: 1994-11-18
Final Drill Date: 1994-11-25
Well Total Depth: 1877.00 m
Surface Hole Latitude: 52.138824
Surface Hole Longitude: -113.666075

For data sources see[1][2]

Well History

Date Event
1994-11-16 Obtained License
1994-11-19 Surface Casing Operation Performed
1994-11-25 Finished Drilling
1994-11-25 Well Log Performed
1994-11-25 Well Mode changed to Drilled and Cased
1994-11-26 Drill Stem Test Performed
1994-11-27 Production Casing Operation Performed
1994-11-29 Rig Released
1994-12-11 Well Log Performed
1994-12-12 Perforation Treatment Performed - Jet Perforation
1994-12-12 Well Log Performed
1994-12-14 Perforation Treatment Performed - Fractured
1995-02-19 Well Log Performed
1995-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-02-20 Plug Back Performed
1995-02-20 Well Log Performed
1995-02-21 Perforation Treatment Performed - Jet Perforation
1995-02-21 Well Log Performed
1995-02-22 Perforation Treatment Performed - Fractured
1995-07-03 Well Began Production
1995-07-03 Well Fluid changed to Gas
1995-07-03 Well Mode changed to Flowing
2017-02-01 Well Fluid changed to Gas
2017-02-01 Well Mode changed to Suspended
2017-04-03 Well Fluid changed to Gas
2017-04-03 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-12-12 Perforation 1852.50 1855.00 14
1994-12-14 Fracture 1852.50 1855.00 0
1995-02-20 Packing Device Capped w/Cement 1827.00 1835.00 0
1995-02-21 Perforation 981.50 983.00 13
1995-02-21 Perforation 984.50 986.00 13
1995-02-21 Perforation 986.50 987.50 13
1995-02-21 Perforation 988.50 990.00 13
1995-02-22 Fracture 981.50 990.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 4096 0.0 0.0 0.0
1996 6567 0.0 0.0 0.0
1997 4556 0.0 0.0 0.0
1998 8739 0.0 0.0 0.0
1999 1865 0.0 0.0 0.0
2001 1143 0.0 0.0 0.0
2005 4821 0.0 0.0 0.0
2006 7716 0.0 0.0 0.0
2007 8744 0.0 0.0 0.0
2008 7941 0.0 0.0 0.0
2009 8737 0.0 0.0 0.0
2010 8567 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 7391 0.0 0.0 0.0
2014 5136 0.0 0.0 0.0
2015 6490 0.0 0.0 0.0
2016 7344 0.0 0.0 0.0
2017 6456 0.0 0.0 0.0
2018 6516 0.0 0.0 0.0
2019 5933 0.0 0.0 0.0
2020 360 0.0 0.0 0.0

For data sources see[5]

References