X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364261010002

Well Details

Well ID: 0364261010002
Loading map...
Location: 00/10-10-036-26W4/2
Location Alias: 00/10-10-36-26 W4M
Location Alias 2: 00/10-10-036-26 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 26
Section: 10
County/Municipality: Red Deer County
Well Name: EMBER THREEHCK 10-10-36-26
Operator Name: Ember Resources Inc.
License Number: 0270432
License Date: 2002-05-29
License Status: Issued
Spud Date: 2002-06-12
Final Drill Date: 2002-06-14
Well Total Depth: 1032.00 m
Surface Hole Latitude: 52.080241
Surface Hole Longitude: -113.634929

For data sources see[1][2]

Well History

Date Event
2002-05-29 Obtained License
2002-06-13 Surface Casing Operation Performed
2002-06-14 Finished Drilling
2002-06-14 Well Log Performed
2002-06-14 Well Mode changed to Drilled and Cased
2002-06-15 Production Casing Operation Performed
2002-06-15 Rig Released
2002-07-21 Perforation Treatment Performed - Jet Perforation
2002-08-06 Perforation Treatment Performed - Fractured
2002-08-25 Perforation Treatment Performed - Jet Perforation
2002-09-05 Perforation Treatment Performed - Cement Squeeze
2002-09-05 Well Mode changed to Abandoned Zone
2002-09-14 Perforation Treatment Performed - Jet Perforation
2002-09-16 Perforation Treatment Performed - Fractured
2011-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-02 Perforation Treatment Performed - Jet Perforation
2011-11-02 Plug Back Performed
2011-11-02 Well Log Performed
2011-11-05 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-07-21 Perforation 985.00 988.50 17
2011-11-02 Perforation 322.00 325.00 13
2011-11-02 Perforation 454.00 455.00 13
2011-11-02 Perforation 487.40 488.40 13
2011-11-02 Perforation 525.00 528.00 13
2011-11-02 Perforation 544.50 545.50 13
2011-11-02 Perforation 568.00 569.50 13
2011-11-02 Perforation 597.00 599.00 13
2011-11-02 Perforation 605.00 606.00 13
2011-11-02 Perforation 612.80 614.30 13
2011-11-02 Perforation 653.00 654.00 13
2002-08-06 Fracture 985.00 988.50 0
2011-11-02 Perforation 657.70 659.70 13
2011-11-02 Perforation 683.10 684.10 13
2011-11-02 Perforation 686.10 687.10 13
2011-11-02 Perforation 741.00 743.50 13
2011-11-05 Fracture 322.00 687.10 0
2002-08-25 Perforation 431.50 435.50 17
2002-08-25 Perforation 426.00 428.00 17
2002-09-05 Cement Squeeze 426.00 435.50 0
2002-09-14 Perforation 302.00 306.00 17
2002-09-14 Perforation 297.00 299.50 17
2002-09-16 Fracture 297.00 306.00 0
2011-11-02 Packing Device Capped w/Cement 970.00 978.80 0

For data sources see[4]



References